Modelo
(WBS)
Presupuesto
Base
Ajustes PSP
Ajustado
Anticipos Costo
Real
Costo
Ajustado
% Part % Part A % Av
Fin
% Av
Fis
Variación
%
Valor
Ganado
Ejecutado Variación
Q
CPI % CPI EAC VAC % VAC Ingreso Margen
Bruto
Ordenado por 80/20 (Peor CPI primero)
APARTAMENTOS GIRONA
- - - - - - 100.00% 100.00% 12.46% 12.08% -0.38% - - - 0.97 3.06% - - -3.16% - 0.00%
APARTAMENTOS GIRONA INDIRECTOS DE OBRA
- - - - - - 13.36% 13.16% 18.26% 15.43% -2.83% - - - 0.84 15.50% - - -18.34% - 0.00%
INDIRECTOS DE OBRA
- - - - - - 13.36% 13.16% 18.26% 15.43% -2.83% - - - 0.84 15.50% - - -18.34% - 0.00%
PERSONAL DE OBRA OPERATIVO
- - - - - - 3.16% 3.11% 32.81% 27.00% -5.81% - - - 0.82 17.72% - - -21.53% - 0.00%
('MANO DE OBRA',)
- - - - - - 2.84% 2.80% 19.89% 27.00% 7.11% - - - 1.36 -35.77% - - 26.35% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 2.84% 2.80% 19.89% 27.00% 7.11% - - - 1.36 -35.77% - - 26.35% - 0.00%
IGSS PATRONAL
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BONIF. DECRETO
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IRTRA
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INTECAP
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BONO 14
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AGUINALDO
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INDEMNIZACION
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA AYUDANTE
- - - - - - 1.27% 1.25% 7.72% 27.00% 19.28% - - - 3.50 -249.55% - - 71.39% - 0.00%
MANO DE OBRA SEGURIDAD INDUSTRIAL
- - - - - - 0.45% 0.44% 5.47% 27.00% 21.53% - - - 4.93 -393.49% - - 79.74% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PROVISION PRESTACIONES
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA BODEGUERO
- - - - - - 0.37% 0.36% 5.46% 27.00% 21.54% - - - 4.95 -394.89% - - 79.79% - 0.00%
MANO DE OBRA ELECTRICIDAD
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUELDOS ADMON
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VACACIONES
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA ALBA?IL / MAESTRO DE OBRA
- - - - - - 0.76% 0.75% 0.00% 27.00% 27.00% - - - 32282.68 -3228167.69% - - 100.00% - 0.00%
MANO DE OBRA ALBAÑIL / MAESTRO DE OBRA
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.00% 0.00% 0.00% 27.00% 27.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 0.32% 0.31% 0.00% 27.00% 27.00% - - - 13458.49 -1345749.29% - - 99.99% - 0.00%
('SERVICIOS BASICOS',)
- - - - - - 0.32% 0.31% 0.00% 27.00% 27.00% - - - 13458.49 -1345749.29% - - 99.99% - 0.00%
SERVICIO DE SEGURIDAD
- - - - - - 0.32% 0.31% 0.00% 27.00% 27.00% - - - 13458.49 -1345749.29% - - 99.99% - 0.00%
HERRAMIENTO Y EQUIPO
- - - - - - 4.18% 4.12% 11.98% 10.00% -1.98% - - - 0.83 16.56% - - -19.84% - 0.00%
('MATERIALES',)
- - - - - - 0.13% 0.12% 47.83% 10.00% -37.83% - - - 0.21 79.09% - - -378.28% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.05% 0.05% 52.84% 10.00% -42.84% - - - 0.19 81.07% - - -428.37% - 0.00%
ESPIGAS DE HULE
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAMPARA LED TIPO REFLECTOR DE 30W
- - - - - - 0.02% 0.02% 0.00% 10.00% 10.00% - - - 280.00 -27900.00% - - 99.64% - 0.00%
MANGUERA LED ROLLO 5M
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTENSION ELECTRICA
- - - - - - 0.04% 0.04% 77.68% 10.00% -67.68% - - - 0.13 87.13% - - -676.79% - 0.00%
CINTA DE AISLAR SCOTCH
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.07% 0.07% 20.53% 10.00% -10.53% - - - 0.49 51.29% - - -105.30% - 0.00%
BROCAS PARA MADERA DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 9"
- - - - - - 0.07% 0.07% 0.00% 10.00% 10.00% - - - 1120.00 -111900.00% - - 99.91% - 0.00%
DISCOS P/CORTE D/METAL DE 9"
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA DOBLE CARA TRASPARENTE 3/4"
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCA DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 33.60 -3260.00% - - 97.02% - 0.00%
DISCO CIRCULAR CORTE DE MADERA 7 1/4''
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANDADO YALE
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO 5800 PSI
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BOTIQUIN',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA ADHESIVA O ESPARADRAPO
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DIESEL
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUPER
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGULAR
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IDP REGULAR
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IDP SUPER
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IDP DIESEL
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PAPEL HIGIENICO
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPUMA EXPANSIVA SISTA 500 ML
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.37% 0.36% 41.98% 10.00% -31.98% - - - 0.24 76.18% - - -319.77% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.37% 0.36% 41.93% 10.00% -31.93% - - - 0.24 76.15% - - -319.27% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FLETES
- - - - - - 0.37% 0.36% 38.80% 10.00% -28.80% - - - 0.26 74.23% - - -288.02% - 0.00%
('GASTOS INDIRECTOS',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSECTICIDA
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 1.52% 1.50% 7.84% 10.00% 2.16% - - - 1.28 -27.57% - - 21.61% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.03% 0.03% 273.58% 10.00% -263.58% - - - 0.04 96.34% - - -2635.81% - 0.00%
CUBETAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANGUERA P/AGUA DE 1/2" COLOR VERDE 30 MTS
- - - - - - 0.00% 0.00% 42.41% 10.00% -32.41% - - - 0.24 76.42% - - -324.11% - 0.00%
MACHETE TIPO VIZCANIO DE 14"
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PALA CON CABO
- - - - - - 0.00% 0.00% 142.86% 10.00% -132.86% - - - 0.07 93.00% - - -1328.57% - 0.00%
PIOCHA C/CABO
- - - - - - 0.00% 0.00% 401.73% 10.00% -391.73% - - - 0.02 97.51% - - -3917.32% - 0.00%
BARRETAS LARGAS
- - - - - - 0.00% 0.00% 217.01% 10.00% -207.01% - - - 0.05 95.39% - - -2070.06% - 0.00%
RADIO COMUNICADOR PORTATIL
- - - - - - 0.02% 0.02% 287.67% 10.00% -277.67% - - - 0.03 96.52% - - -2776.71% - 0.00%
CARRETA DE MANO
- - - - - - 0.00% 0.00% 336.11% 10.00% -326.11% - - - 0.03 97.02% - - -3261.10% - 0.00%
AZADON C/CABO DE 3 LIBRAS
- - - - - - 0.00% 0.00% 138.34% 10.00% -128.34% - - - 0.07 92.77% - - -1283.39% - 0.00%
ALMADANA
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISTOLA PLASTICA TRUPER DE 8"
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SACATIERRAS CLASSIC
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA ELECTRICA',)
- - - - - - 0.05% 0.05% 63.16% 10.00% -53.16% - - - 0.16 84.17% - - -531.55% - 0.00%
PULIDORA TIPO ESMERILADORA 4 1/2" PULG. 1100W
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PULIDORA TIPO ESMERILADORA 9 PULG. 2000W
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BARRENO ROTOMARTILLO ELEC. TRUPER 1/2
- - - - - - 0.05% 0.05% 10.18% 10.00% -0.18% - - - 0.98 1.75% - - -1.78% - 0.00%
SIERRA CIRCULAR INDUSTRIAL
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIERRA CIRCULAR PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SEGURIDAD INDUSTRIAL',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BOTIQUIN
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
HILO NYLON P/ALBAÑIL
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MARTILLO C/SACA CLAVOS
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO DE CONSTRUCCION',)
- - - - - - 0.45% 0.45% 0.00% 10.00% 10.00% - - - 7116.00 -711500.00% - - 99.99% - 0.00%
ANDAMIOS
- - - - - - 0.36% 0.35% 0.00% 10.00% 10.00% - - - 5616.00 -561500.00% - - 99.98% - 0.00%
VIBRADOR ELECTRICO PARA CONCRETO (COMPLETO)
- - - - - - 0.10% 0.09% 0.00% 10.00% 10.00% - - - 1500.00 -149900.00% - - 99.93% - 0.00%
('VEHICULO',)
- - - - - - 0.99% 0.97% 0.00% 10.00% 10.00% - - - 15488.78 -1548778.40% - - 99.99% - 0.00%
ANDAMIO COLGANTE
- - - - - - 0.99% 0.97% 0.00% 10.00% 10.00% - - - 15488.78 -1548778.40% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 2.14% 2.11% 6.69% 10.00% 3.31% - - - 1.49 -49.45% - - 33.09% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 2.14% 2.11% 4.79% 10.00% 5.21% - - - 2.09 -108.59% - - 52.06% - 0.00%
ALQUILER DE MAQUINARIA
- - - - - - 0.11% 0.11% 22.54% 10.00% -12.54% - - - 0.44 55.64% - - -125.43% - 0.00%
HERRAMIENTAS Y EQUIPO
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELEVADOR DE CARGA
- - - - - - 0.34% 0.33% 0.00% 10.00% 10.00% - - - 5332.00 -533100.00% - - 99.98% - 0.00%
BATEAS
- - - - - - 0.01% 0.01% 0.00% 10.00% 10.00% - - - 112.00 -11100.00% - - 99.11% - 0.00%
ALQUILER ESCALERAS METALICAS PARA ANDAMIO
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PLATAFORMAS DE ANDAMIO
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER DE MEZCLADORA DE CONCRETO A GASOLINA
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RENTA DE COMPACTADORA BAILARINA
- - - - - - 0.09% 0.08% 0.00% 10.00% 10.00% - - - 1344.00 -134300.00% - - 99.93% - 0.00%
ALQUILER FORMALETA DE METAL Y ACCESORIOS
- - - - - - 1.60% 1.57% 0.00% 10.00% 10.00% - - - 25088.00 -2508700.00% - - 100.00% - 0.00%
('SERVICIO Y MANTENIMIENTO',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BANCOS METALICOS DE TRABAJO
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 0.03% 0.03% 3.96% 10.00% 6.04% - - - 2.53 -152.74% - - 60.43% - 0.00%
('EQUIPO DE COMPUTO E IMPRESORAS',)
- - - - - - 0.03% 0.03% 0.00% 10.00% 10.00% - - - 450.00 -44900.00% - - 99.78% - 0.00%
IMPRESORAS
- - - - - - 0.01% 0.01% 0.00% 10.00% 10.00% - - - 100.00 -9900.00% - - 99.00% - 0.00%
COMPUTADORAS LAPTOP
- - - - - - 0.02% 0.02% 0.00% 10.00% 10.00% - - - 350.00 -34900.00% - - 99.71% - 0.00%
('CONSUMIBLES CAFETERIA',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BOLSA PLASTICA
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PAPELERIA Y UTILES',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ENGRAPADORA FAST
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARCHIVADOR AMP. BASICO MEDIA CARTA
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SERVICIOS BASICOS',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TELEFONO E INTERNET
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 10.00% 10.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOPOGRAFIA
- - - - - - 0.28% 0.27% 30.51% 26.00% -4.51% - - - 0.85 14.79% - - -17.36% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.28% 0.27% 30.51% 26.00% -4.51% - - - 0.85 14.79% - - -17.36% - 0.00%
('SUB CONTRATO MOVIMIENTO DE TIERRA',)
- - - - - - 0.28% 0.27% 30.51% 26.00% -4.51% - - - 0.85 14.79% - - -17.36% - 0.00%
SUBCONTRATO SERVICIOS DE TOPOGRAFIA
- - - - - - 0.28% 0.27% 30.51% 26.00% -4.51% - - - 0.85 14.79% - - -17.36% - 0.00%
INSTALACIONES PROVISIONALES + AGUA + ELECTRICIDAD
- - - - - - 1.27% 1.25% 45.76% 41.00% -4.76% - - - 0.90 10.40% - - -11.60% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.86% 0.85% 8.93% 41.00% 32.07% - - - 4.59 -359.06% - - 78.22% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.86% 0.85% 8.49% 41.00% 32.51% - - - 4.83 -383.07% - - 79.30% - 0.00%
INSTALACIONES PROVISIONALES
- - - - - - 0.57% 0.56% 1.76% 41.00% 39.24% - - - 23.32 -2232.44% - - 95.71% - 0.00%
ALQUILER DE SANITARIOS PORTATILES
- - - - - - 0.29% 0.29% 21.71% 41.00% 19.29% - - - 1.89 -88.85% - - 47.05% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VIAJES DE SELECTO
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 0.41% 0.40% 7.43% 41.00% 33.57% - - - 5.52 -452.12% - - 81.89% - 0.00%
('SERVICIOS BASICOS',)
- - - - - - 0.41% 0.40% 5.72% 41.00% 35.28% - - - 7.16 -616.28% - - 86.04% - 0.00%
ALQUILER DE VIVIENDA
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ENERGIA ELECTRICA
- - - - - - 0.27% 0.26% 0.00% 41.00% 41.00% - - - 17330.21 -1732920.80% - - 99.99% - 0.00%
AGUA
- - - - - - 0.14% 0.14% 1.72% 41.00% 39.28% - - - 23.78 -2278.00% - - 95.79% - 0.00%
('EQUIPO DE COMPUTO E IMPRESORAS',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAMARAS ADHUA 2MPX
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
UPS
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS ADMINISTRATIVOS',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COPIA DE LLAVES
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PAPELERIA Y UTILES',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PAPEL P/ FOTOCOPIADORA CARTA
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA ELECTRICA',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BARRENO ROTOMARTILLO ELEC. TRUPER 1/2
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIERRA CIRCULAR PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERRUCHO PARA TABLAYESO 12" TOTAL (3006)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MARTILLO DE HULE
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ENGRAPADORA MARCA TRUPER
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLOMO DE CENTRO
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MACHETE PULIDO DE 18"
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RACK CERRADO
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BOMBA PARA FUMIGAR (MATABI)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
HILO NYLON P/ALBAÑIL
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 9 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE LAMINA
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CARPINTERIA',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BISAGRA 4 X 4 DORADAS
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASADOR CORREDIZO
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOMACORRIENTE DOBLE POLARIZADO
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SOPORTE PARA GANCHO DE ACOMETIDA DE 1 1/4"
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOMACORRIENTE DE SOBRE PONER
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CABLE PARALELO #12
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPAMENTO',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASURERO PARA COLGAR A LA PARED DE ACERO INOXIDABLE
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MESA PLEGABLE
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLA PLEGABLE
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 9"
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAMINA GAL. DE 12 PIES 28MM ACANALADA
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TARUGO PLASTICO 3/8"
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARMELLA
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAMINA GAL. DE 9 PIES 28MM ACANALADA
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BISAGRA CILINDRICA PARA PORTON 5/8X3 . 1/2
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANDADO YALE
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA DE MICROFIBRA
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 2" X 3" X 10'
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLON DE 2" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 4" X 4" X 10'
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 2" X 2" X 9'
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLONCILLO DE 11/2" X 12" X 9'
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN SPRAY
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVELADOR PEGACERAMICO DE 40 KG.
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPUMA EXPANSIVA SISTA 500 ML
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SEGURIDAD INDUSTRIAL',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESLABON TIPO MOSQUETON
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO 4'X8'X1/2" SP GLASS EXTERIO
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MANTENIMIENTO Y LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO SERVICIO DE FUMIGACION
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 41.00% 41.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA ADMINISTRATIVO
- - - - - - 1.65% 1.62% 9.54% 9.00% -0.54% - - - 0.94 5.68% - - -6.02% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 0.99% 0.98% 14.00% 9.00% -5.00% - - - 0.64 35.70% - - -55.52% - 0.00%
('SERVICIOS CONTRATADOS',)
- - - - - - 0.99% 0.98% 13.97% 9.00% -4.97% - - - 0.64 35.60% - - -55.27% - 0.00%
HONORARIOS PROFESIONALES
- - - - - - 0.99% 0.98% 13.97% 9.00% -4.97% - - - 0.64 35.60% - - -55.27% - 0.00%
('GASTOS INDIRECTOS',)
- - - - - - 0.00% 0.00% 0.00% 9.00% 9.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARQUEOS Y PEAJES
- - - - - - 0.00% 0.00% 0.00% 9.00% 9.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.66% 0.65% 2.81% 9.00% 6.19% - - - 3.21 -220.57% - - 68.81% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.66% 0.65% 2.81% 9.00% 6.19% - - - 3.21 -220.57% - - 68.81% - 0.00%
IGSS PATRONAL
- - - - - - 0.00% 0.00% 0.00% 9.00% 9.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BONIF. DECRETO
- - - - - - 0.00% 0.00% 0.00% 9.00% 9.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IRTRA
- - - - - - 0.00% 0.00% 0.00% 9.00% 9.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INTECAP
- - - - - - 0.00% 0.00% 0.00% 9.00% 9.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BONO 14
- - - - - - 0.00% 0.00% 0.00% 9.00% 9.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AGUINALDO
- - - - - - 0.00% 0.00% 0.00% 9.00% 9.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INDEMNIZACION
- - - - - - 0.00% 0.00% 0.00% 9.00% 9.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA AYUDANTE
- - - - - - 0.00% 0.00% 0.00% 9.00% 9.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUELDOS ADMINISTRATIVO
- - - - - - 0.39% 0.38% 0.00% 9.00% 9.00% - - - 5508.00 -550700.00% - - 99.98% - 0.00%
VACACIONES
- - - - - - 0.00% 0.00% 0.00% 9.00% 9.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA ALBA?IL / MAESTRO DE OBRA
- - - - - - 0.27% 0.26% 0.00% 9.00% 9.00% - - - 3780.00 -377900.00% - - 99.97% - 0.00%
MANO DE OBRA ALBAÑIL / MAESTRO DE OBRA
- - - - - - 0.00% 0.00% 0.00% 9.00% 9.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SEGURIDAD INDUSTRIAL
- - - - - - 0.34% 0.34% 14.35% 14.00% -0.35% - - - 0.98 2.44% - - -2.50% - 0.00%
('EQUIPO',)
- - - - - - 0.12% 0.11% 40.59% 14.00% -26.59% - - - 0.34 65.51% - - -189.92% - 0.00%
('SEGURIDAD INDUSTRIAL',)
- - - - - - 0.12% 0.11% 39.84% 14.00% -25.84% - - - 0.35 64.86% - - -184.58% - 0.00%
GUANTE DE PROTECCION
- - - - - - 0.00% 0.00% 89.29% 14.00% -75.29% - - - 0.16 84.32% - - -537.76% - 0.00%
LINEA DE VIDA CON GANCHO GRANDE
- - - - - - 0.01% 0.01% 0.00% 14.00% 14.00% - - - 211.68 -21068.00% - - 99.53% - 0.00%
ARNES
- - - - - - 0.02% 0.02% 0.00% 14.00% 14.00% - - - 352.80 -35180.00% - - 99.72% - 0.00%
ALCOHOLIMETRO
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LENTES DE PROTECCION CLAROS
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LENTES DE PROTECCION OSCUROS
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 58.80 -5780.00% - - 98.30% - 0.00%
CASCO DE PROTECCION CON RATCH
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BOTAS INDUSTRIALES
- - - - - - 0.07% 0.07% 23.79% 14.00% -9.79% - - - 0.59 41.14% - - -69.90% - 0.00%
CASCO DE PROTECCION
- - - - - - 0.01% 0.01% 60.71% 14.00% -46.71% - - - 0.23 76.94% - - -333.67% - 0.00%
TAPON DE OIDOS
- - - - - - 0.00% 0.00% 10.71% 14.00% 3.29% - - - 1.31 -30.67% - - 23.47% - 0.00%
CHALECO REFLECTIVO
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 78.40 -7740.00% - - 98.72% - 0.00%
MASCARILLAS KN95
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 19.60 -1860.00% - - 94.90% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MARTILLO DE HULE
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TENAZA
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBON DE 18"
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALCOHOL EN GEL ANTIBACTERIAL
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SEGURIDAD INDUSTRIAL',)
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BOQUILLAS PARA ALCOHOLIMETRO
- - - - - - 0.00% 0.00% 0.00% 14.00% 14.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.23% 0.22% 0.00% 14.00% 14.00% - - - 5005.00 -500400.00% - - 99.98% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.23% 0.22% 0.00% 14.00% 14.00% - - - 5005.00 -500400.00% - - 99.98% - 0.00%
SEGURIDAD INDUSTRIAL
- - - - - - 0.23% 0.22% 0.00% 14.00% 14.00% - - - 5005.00 -500400.00% - - 99.98% - 0.00%
FIANZAS, SEGUROS Y CONTRATOS
- - - - - - 0.22% 0.22% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 0.22% 0.22% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SERVICIOS BASICOS',)
- - - - - - 0.22% 0.22% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SEGURO DE RESPONSABILIDAD CIVIL
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FIANZAS, SEGUROS Y CONTRATOS
- - - - - - 0.16% 0.16% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PRESTACIONES PERSONAL DE OBRA
- - - - - - 1.88% 1.85% 1.52% 0.00% -1.52% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 1.88% 1.85% 1.52% 0.00% -1.52% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 1.88% 1.85% 1.52% 0.00% -1.52% - - - 0.00 100.00% - - 0.00% - 0.00%
PROVISION PRESTACIONES
- - - - - - 1.88% 1.85% 1.52% 0.00% -1.52% - - - 0.00 100.00% - - 0.00% - 0.00%
LABORATORIOS
- - - - - - 0.38% 0.37% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.38% 0.37% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.38% 0.37% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE LABORATORIO
- - - - - - 0.38% 0.37% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
APARTAMENTOS GIRONA OBRA CIVIL
- - - - - - 86.64% 86.84% 11.58% 11.57% -0.01% - - - 1.00 0.12% - - -0.12% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL -1 (SOTANO)
- - - - - - 1.46% 1.44% 102.44% 2.00% -100.44% - - - 0.02 98.05% - - -5022.02% - 0.00%
NIVEL -1 | MUROS
- - - - - - 1.46% 1.44% 102.44% 2.00% -100.44% - - - 0.02 98.05% - - -5022.02% - 0.00%
('MATERIALES',)
- - - - - - 1.00% 0.98% 116.21% 2.00% -114.21% - - - 0.02 98.28% - - -5710.36% - 0.00%
('MADERA',)
- - - - - - 0.14% 0.14% 212.95% 2.00% -210.95% - - - 0.01 99.06% - - 0.00% - 0.00%
PARALES DE 2" X 3" X 10'
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLON DE 2" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3" X 4" X 10´
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 3" X 4" X 12'
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.14% 0.14% 29.03% 2.00% -27.03% - - - 0.07 93.11% - - -1351.33% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.41% 0.40% 192.03% 2.00% -190.03% - - - 0.01 98.96% - - -9501.60% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.03% 0.03% 70.84% 2.00% -68.84% - - - 0.03 97.18% - - -3441.76% - 0.00%
ACERO DE 5/8 X 9 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.22% 0.21% 127.32% 2.00% -125.32% - - - 0.02 98.43% - - -6265.86% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.17% 0.17% 184.47% 2.00% -182.47% - - - 0.01 98.92% - - -9123.55% - 0.00%
ELECTROMALLA 6X6 3/3
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.42% 0.42% 16.80% 2.00% -14.80% - - - 0.12 88.10% - - -740.10% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.42% 0.42% 0.00% 2.00% 2.00% - - - 1328.42 -132741.56% - - 99.92% - 0.00%
SERVICIO DE BOMBEO CONVENCIONAL
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.03% 0.03% 0.00% 2.00% 2.00% - - - 82.78 -8177.68% - - 98.79% - 0.00%
MATERIALES
- - - - - - 0.03% 0.03% 0.00% 2.00% 2.00% - - - 82.78 -8177.68% - - 98.79% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 9"
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.41% 0.40% 83.11% 2.00% -81.11% - - - 0.02 97.59% - - -4055.70% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.41% 0.40% 83.11% 2.00% -81.11% - - - 0.02 97.59% - - -4055.70% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.35% 0.34% 97.46% 2.00% -95.46% - - - 0.02 97.95% - - -4773.03% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.06% 0.06% 0.00% 2.00% 2.00% - - - 188.13 -18712.86% - - 99.47% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.06% 0.06% 0.00% 2.00% 2.00% - - - 182.21 -18120.80% - - 99.45% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.06% 0.06% 0.00% 2.00% 2.00% - - - 182.21 -18120.80% - - 99.45% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 10.18 -917.60% - - 90.17% - 0.00%
ALQUILER FORMALETA DE METAL Y ACCESORIOS
- - - - - - 0.05% 0.05% 0.00% 2.00% 2.00% - - - 172.03 -17103.20% - - 99.42% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MACHETE TIPO VIZCANIO DE 14"
- - - - - - 0.00% 0.00% 0.00% 2.00% 2.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES
- - - - - - 14.37% 14.16% 22.49% 5.94% -16.55% - - - 0.26 73.59% - - -278.66% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 9.87% 9.73% 19.34% 5.00% -14.34% - - - 0.26 74.15% - - -286.80% - 0.00%
('SUBCONTRATOS',)
- - - - - - 9.87% 9.73% 19.34% 5.00% -14.34% - - - 0.26 74.15% - - -286.80% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 9.87% 9.73% 19.34% 5.00% -14.34% - - - 0.26 74.15% - - -286.80% - 0.00%
SUBCONTRATO - MAT + MO / ELECTRICIDAD ESPECIALES
- - - - - - 9.87% 9.73% 19.34% 5.00% -14.34% - - - 0.26 74.15% - - -286.80% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 4.50% 4.43% 29.41% 8.00% -21.41% - - - 0.27 72.80% - - -267.63% - 0.00%
('SUBCONTRATOS',)
- - - - - - 4.50% 4.43% 29.41% 8.00% -21.41% - - - 0.27 72.80% - - -267.63% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 4.50% 4.43% 29.41% 8.00% -21.41% - - - 0.27 72.80% - - -267.63% - 0.00%
SUB CONTRATO SUMINISTRO E INSTALACION HIDRAULICAS
- - - - - - 4.50% 4.43% 29.41% 8.00% -21.41% - - - 0.27 72.80% - - -267.63% - 0.00%
PRELIMINARES Y CIMENTACION
- - - - - - 7.97% 9.35% 57.75% 92.41% 34.66% - - - 1.60 -60.03% - - 37.51% - 0.00%
CIMENTACION
- - - - - - 5.54% 5.46% 75.14% 87.00% 11.86% - - - 1.16 -15.79% - - 13.63% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 1942.99% 87.00% -1855.99% - - - 0.04 95.52% - - -2133.32% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 273.14 -27213.65% - - 99.63% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 273.14 -27213.65% - - 99.63% - 0.00%
('MOVIMIENTO DE TIERRA',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MOVIMIENTO DE TIERRA
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 4.16% 4.10% 77.85% 87.00% 9.15% - - - 1.12 -11.75% - - 10.52% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 8962.61% 87.00% -8875.61% - - - 0.01 99.03% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 35.14 -3413.93% - - 97.15% - 0.00%
EPOXICO EBOND 580 MV
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 633.79% 87.00% -546.79% - - - 0.14 86.27% - - -628.50% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 156.49 -15548.69% - - 99.36% - 0.00%
DIESEL
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IDP DIESEL
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.01% 0.01% 625.84% 87.00% -538.84% - - - 0.14 86.10% - - -619.36% - 0.00%
DISCOS P/CORTE D/METAL DE 9"
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VARILLA ROSCADA DE 3/8 X 3.MTS
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CARTUCHO EPOXICO HILTI HIT-RE-500
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CADENA GALVANIZADA DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.01% 0.01% 0.00% 87.00% 87.00% - - - 879.25 -87824.81% - - 99.89% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 167.76% 87.00% -80.76% - - - 0.52 48.14% - - -92.83% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.01% 0.01% 0.00% 87.00% 87.00% - - - 880.26 -87925.73% - - 99.89% - 0.00%
SELECTO
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 312.49 -31148.66% - - 99.68% - 0.00%
ARENA DE RIO EMBOLSADA
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 1.78% 1.75% 89.58% 87.00% -2.58% - - - 0.97 2.88% - - -2.96% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.12% 0.12% 31.75% 87.00% 55.25% - - - 2.74 -173.99% - - 63.50% - 0.00%
ACERO DE 1' X 12 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1' X 9 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/4 X 9 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 9 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 9 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 9MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1" X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1' X 6 MT G60 LEG
- - - - - - 0.58% 0.58% 0.00% 87.00% 87.00% - - - 79872.98 -7987197.74% - - 100.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.07% 0.07% 24.56% 87.00% 62.44% - - - 3.54 -254.18% - - 71.77% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.47% 0.47% 8.06% 87.00% 78.94% - - - 10.79 -978.82% - - 90.73% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.20% 0.20% 23.57% 87.00% 63.43% - - - 3.69 -269.14% - - 72.91% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.28% 0.27% 14.44% 87.00% 72.56% - - - 6.03 -502.65% - - 83.41% - 0.00%
ELECTROMALLA 6X6 3/3
- - - - - - 0.05% 0.05% 73.54% 87.00% 13.46% - - - 1.18 -18.30% - - 15.47% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 293.94% 87.00% -206.94% - - - 0.30 70.40% - - -237.86% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE LAMINA
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 2.22% 2.19% 67.58% 87.00% 19.42% - - - 1.29 -28.73% - - 22.32% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 87.00% 87.00% - - - 3783.61 -378261.26% - - 99.97% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 1.15% 1.14% 0.00% 87.00% 87.00% - - - 157708.42 -15770742.35% - - 100.00% - 0.00%
SERVICIO DE BOMBEO CONVENCIONAL
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO FLUIDO 4001 M3
- - - - - - 1.04% 1.03% 126.46% 87.00% -39.46% - - - 0.69 31.20% - - -45.35% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.02% 0.02% 46.62% 87.00% 40.38% - - - 1.87 -86.60% - - 46.41% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 46.62% 87.00% 40.38% - - - 1.87 -86.60% - - 46.41% - 0.00%
('MADERA',)
- - - - - - 0.10% 0.10% 41.86% 87.00% 45.14% - - - 2.08 -107.85% - - 51.89% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 87.00% 87.00% - - - 889.24 -88823.57% - - 99.89% - 0.00%
TABLON DE 2" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 4" X 4" X 10'
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.04% 0.04% 0.00% 87.00% 87.00% - - - 5292.70 -529169.72% - - 99.98% - 0.00%
PARALES DE 3" X 4" X 10'
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.05% 0.05% 27.07% 87.00% 59.93% - - - 3.21 -221.44% - - 68.89% - 0.00%
('SEGURIDAD INDUSTRIAL',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CERCA PLASTICA LIMITACION NARANJA
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 0.00% 87.00% 87.00% - - - 2456.92 -245592.35% - - 99.96% - 0.00%
MATERIALES
- - - - - - 0.02% 0.02% 0.00% 87.00% 87.00% - - - 2456.92 -245592.35% - - 99.96% - 0.00%
('SUBCONTRATOS',)
- - - - - - 1.38% 1.36% 55.68% 87.00% 31.32% - - - 1.56 -56.24% - - 35.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 1.38% 1.36% 55.68% 87.00% 31.32% - - - 1.56 -56.24% - - 35.99% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 1.08% 1.06% 71.20% 87.00% 15.80% - - - 1.22 -22.20% - - 18.17% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.30% 0.30% 0.00% 87.00% 87.00% - - - 41088.01 -4108701.20% - - 100.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CUBETAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TONELES DE METAL VACIOS
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SEGURIDAD INDUSTRIAL',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GUANTE DE PROTECCION
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LENTES DE PROTECCION CLAROS
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LENTES DE PROTECCION OSCUROS
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TAPON DE OIDOS
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
HILO NYLON P/ALBAÑIL
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS ADMINISTRATIVOS',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VIATICOS
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VIAJES DE SELECTO
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FLETES
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RECARGO POR SUSPENSIÓN DE OBRA
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PROVISION PRESTACIONES
- - - - - - 0.00% 0.00% 0.00% 87.00% 87.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PRELIMINARES
- - - - - - 2.43% 3.89% 33.35% 100.00% 66.65% - - - 3.00 -199.85% - - 66.65% - 0.00%
('SUBCONTRATOS',)
- - - - - - 1.28% 1.46% 133.42% 100.00% -33.42% - - - 0.75 25.05% - - -33.42% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 1.28% 1.46% 133.42% 100.00% -33.42% - - - 0.75 25.05% - - -33.42% - 0.00%
SUBCONTRATOS
- - - - - - 0.47% 0.56% 300.71% 100.00% -200.71% - - - 0.33 66.75% - - -200.71% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.81% 0.90% 28.54% 100.00% 71.46% - - - 3.50 -250.40% - - 71.46% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.70% 0.89% 53.80% 100.00% 46.20% - - - 1.86 -85.86% - - 46.20% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.70% 0.89% 53.80% 100.00% 46.20% - - - 1.86 -85.86% - - 46.20% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.70% 0.79% 75.94% 100.00% 24.06% - - - 1.32 -31.68% - - 24.06% - 0.00%
VIAJES DE SELECTO
- - - - - - 0.00% 0.10% -121.35% 100.00% 221.35% - - - 15950.57 -1594957.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.44% 0.54% 16.75% 100.00% 83.25% - - - 5.97 -497.13% - - 83.25% - 0.00%
('MOVIMIENTO DE TIERRA',)
- - - - - - 0.44% 0.54% 16.75% 100.00% 83.25% - - - 5.97 -497.13% - - 83.25% - 0.00%
SUBCONTRATO MOVIMIENTO DE TIERRA
- - - - - - 0.44% 0.54% 16.75% 100.00% 83.25% - - - 5.97 -497.13% - - 83.25% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 0.00% 0.10% -124.17% 100.00% 224.17% - - - 15950.57 -1594957.00% - - 99.99% - 0.00%
('GASTOS ADMINISTRATIVOS',)
- - - - - - 0.00% 0.10% -124.17% 100.00% 224.17% - - - 15950.57 -1594957.00% - - 99.99% - 0.00%
MULTAS DE TRANSITO
- - - - - - 0.00% 0.10% -124.17% 100.00% 224.17% - - - 15950.57 -1594957.00% - - 99.99% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.90% -120.82% 100.00% 220.82% - - - 144357.78 -14435677.98% - - 100.00% - 0.00%
('CONCRETO',)
- - - - - - 0.00% 0.10% -86.63% 100.00% 186.63% - - - 15950.57 -1594957.00% - - 99.99% - 0.00%
RELLENO FLUIDO TIPO BASE
- - - - - - 0.00% 0.10% -86.63% 100.00% 186.63% - - - 15950.57 -1594957.00% - - 99.99% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.10% -126.30% 100.00% 226.30% - - - 15950.57 -1594957.00% - - 99.99% - 0.00%
SILLETA 7.5
- - - - - - 0.00% 0.10% -126.30% 100.00% 226.30% - - - 15950.57 -1594957.00% - - 99.99% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.10% -122.16% 100.00% 222.16% - - - 16621.72 -1662072.00% - - 99.99% - 0.00%
CAL
- - - - - - 0.00% 0.10% -122.16% 100.00% 222.16% - - - 16621.72 -1662072.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.20% -126.32% 100.00% 226.32% - - - 32032.64 -3203163.99% - - 100.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.10% -126.26% 100.00% 226.26% - - - 16082.07 -1608107.00% - - 99.99% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.10% -126.37% 100.00% 226.37% - - - 15950.57 -1594957.00% - - 99.99% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.40% -124.90% 100.00% 224.90% - - - 63802.28 -6380127.99% - - 100.00% - 0.00%
DIESEL
- - - - - - 0.00% 0.10% -118.26% 100.00% 218.26% - - - 15950.57 -1594957.00% - - 99.99% - 0.00%
REGULAR
- - - - - - 0.00% 0.10% -127.17% 100.00% 227.17% - - - 15950.57 -1594957.00% - - 99.99% - 0.00%
IDP REGULAR
- - - - - - 0.00% 0.10% -127.28% 100.00% 227.28% - - - 15950.57 -1594957.00% - - 99.99% - 0.00%
IDP DIESEL
- - - - - - 0.00% 0.10% -126.88% 100.00% 226.88% - - - 15950.57 -1594957.00% - - 99.99% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL 8
- - - - - - 1.95% 1.92% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 8 | MUROS
- - - - - - 1.02% 1.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.59% 0.58% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.25% 0.25% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.05% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 3/3
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE ALTA RESISTENCIA 7.2 MM G70
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.26% 0.25% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.43% 0.42% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.43% 0.42% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.38% 0.38% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.05% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 8 | LOSAS
- - - - - - 0.92% 0.91% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.53% 0.52% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.24% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4/4
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.26% 0.26% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL 9
- - - - - - 1.92% 1.89% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 9 | MUROS
- - - - - - 1.00% 0.98% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.56% 0.56% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 3/3
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE ALTA RESISTENCIA 7.2 MM G70
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.32% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.31% 0.30% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.43% 0.42% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.43% 0.42% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.38% 0.38% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.05% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 9 | LOSAS
- - - - - - 0.92% 0.91% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.53% 0.52% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.24% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4/4
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.26% 0.26% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL 10
- - - - - - 1.91% 1.88% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 10 | MUROS
- - - - - - 0.99% 0.97% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.55% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.22% 0.22% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 3/3
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE ALTA RESISTENCIA 7.2 MM G70
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.32% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.32% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.43% 0.42% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.43% 0.42% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.38% 0.38% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.05% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 10 | LOSAS
- - - - - - 0.92% 0.91% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.53% 0.52% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.24% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4/4
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.26% 0.26% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL 11
- - - - - - 1.91% 1.88% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 11 | MUROS
- - - - - - 0.99% 0.97% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.55% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.22% 0.22% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 3/3
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE ALTA RESISTENCIA 7.2 MM G70
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.32% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.32% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.43% 0.42% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.43% 0.42% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.38% 0.38% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.05% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 11 | LOSAS
- - - - - - 0.93% 0.91% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.53% 0.52% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.25% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4/4
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.26% 0.26% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL 12
- - - - - - 1.31% 1.29% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 12 | MUROS
- - - - - - 0.73% 0.72% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.42% 0.41% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.18% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 3/3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE ALTA RESISTENCIA 7.2 MM G70
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.31% 0.31% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.31% 0.31% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.28% 0.27% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 12 | LOSAS
- - - - - - 0.58% 0.57% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.32% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4/4
- - - - - - 0.09% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.16% 0.16% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.14% 0.13% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.24% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.24% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.22% 0.21% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL 13
- - - - - - 0.09% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 13 | MUROS
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.05% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 3/3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE ALTA RESISTENCIA 7.2 MM G70
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 13 | LOSAS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 2/2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA SECUNDARIA
- - - - - - 8.82% 8.69% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 1
- - - - - - 0.75% 0.74% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.16% 0.15% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.59% 0.58% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.50% 0.50% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION DE DUCHA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.09% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO HERRERIA GENERAL
- - - - - - 0.09% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 10
- - - - - - 0.73% 0.72% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.04% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK "U" DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.55% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.55% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.18% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION DE DUCHA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 11
- - - - - - 0.73% 0.72% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.04% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK "U" DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.55% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.55% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.18% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION DE DUCHA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 12
- - - - - - 0.64% 0.63% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ANDAMIOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKATOP SEAL 107, KIT 16.3 KG
- - - - - - 0.04% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGARD 62, KIT 22 KG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.41% 0.41% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.41% 0.41% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION DE DUCHA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.24% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZOTEA
- - - - - - 0.16% 0.16% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.12% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.12% 0.12% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.08% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL2
- - - - - - 0.72% 0.71% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.04% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK "U" DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.55% 0.54% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.55% 0.54% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION DE DUCHA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 3
- - - - - - 0.73% 0.72% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.08% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK "U" DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.56% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.56% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION DE DUCHA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.37% 0.37% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 4
- - - - - - 0.73% 0.72% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.04% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK "U" DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.56% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.56% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION DE DUCHA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.37% 0.37% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 5
- - - - - - 0.73% 0.72% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.04% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK "U" DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.56% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.56% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.18% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION DE DUCHA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 6
- - - - - - 0.73% 0.72% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.04% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK "U" DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.55% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.55% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.18% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION DE DUCHA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 7
- - - - - - 0.73% 0.72% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.04% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK "U" DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.55% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.55% 0.55% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.18% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION DE DUCHA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 8
- - - - - - 0.72% 0.71% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.04% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK "U" DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.55% 0.54% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.55% 0.54% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION DE DUCHA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 9
- - - - - - 0.72% 0.71% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.04% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK "U" DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.55% 0.54% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.55% 0.54% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION DE DUCHA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS
- - - - - - 22.67% 22.33% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADO EN MUROS
- - - - - - 2.88% 2.84% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.40% 0.40% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BANDEJA PARA PINTURA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANERAL PARA PINTURA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.40% 0.40% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FELPA SIN RODILLO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA MUROS MO
- - - - - - 0.40% 0.39% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 2.47% 2.44% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 2.47% 2.44% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO ACABADOS CEMENTICIOS
- - - - - - 1.45% 1.43% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTATO ACABADO PLASTICO EN MUROS
- - - - - - 1.03% 1.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRAS COMPLEMENTARIAS
- - - - - - 0.31% 0.31% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA PARA PARQUEO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO BRASILIA DE 43 X 43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO DUELA 20X60
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.22% 0.22% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.19% 0.18% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO ROTULOS DE SE?ALIZACION
- - - - - - 0.12% 0.12% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 1.83% 1.80% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 1.83% 1.80% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 1.20% 1.19% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO INSTALACION DE TABLAYESO MATERIALES Y MANO DE OBRA
- - - - - - 1.20% 1.19% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.63% 0.62% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.63% 0.62% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADO EN CIELOS
- - - - - - 0.40% 0.40% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.40% 0.40% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.40% 0.40% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO ACABADOS CEMENTICIOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO ACABADO PLASTICO EN CIELOS
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 3.53% 3.48% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 2.20% 2.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 2.20% 2.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO BRASILIA DE 43 X 43
- - - - - - 0.61% 0.60% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.30% 0.29% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO CERAMICO 20X30
- - - - - - 0.32% 0.31% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO PEGAMIX AMU
- - - - - - 0.11% 0.11% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO 33X33 ANTIDESLIZANTE
- - - - - - 0.16% 0.16% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO DUELA 20X60
- - - - - - 0.63% 0.63% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 1.33% 1.31% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 1.33% 1.31% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 1.33% 1.31% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 2.26% 2.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 2.26% 2.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE CARPINTERIA',)
- - - - - - 1.79% 1.76% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO SUMINISTRO DE PUERTAS
- - - - - - 1.79% 1.76% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.47% 0.47% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO SUMINISTRO E INSTALACION DE PORTON Y MOTOR ELECTRICO
- - - - - - 0.16% 0.16% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO - MAT + MO / PUERTA METALICA
- - - - - - 0.31% 0.31% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
HERRERIA
- - - - - - 1.05% 1.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA METALICA 2"
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 1.03% 1.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.98% 0.97% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO BARANDA ACERO INOXIDABLE
- - - - - - 0.41% 0.40% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASAMANOS DE METAL
- - - - - - 0.21% 0.21% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE LOUVERS
- - - - - - 0.36% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANERIA
- - - - - - 2.02% 1.99% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 2.02% 1.99% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE VENTANERIA',)
- - - - - - 2.02% 1.99% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO INSTALACION DE VENTANERIA
- - - - - - 2.02% 1.99% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS SANITARIOS
- - - - - - 2.72% 2.68% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 1.33% 1.31% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.16% 0.16% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR OLORES
- - - - - - 0.16% 0.16% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 1.16% 1.15% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE UNA FOSA
- - - - - - 0.21% 0.20% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.11% 0.11% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.15% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA METALICA 2"
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA 2584
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA 2714
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA 444-X
- - - - - - 0.03% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE CON REJILLA CUADRADA P/DUCHA
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA SENCILLA
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRIFERIA LAVAMANOS LLAVE SENCILLA
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LLAVE SENCILLA DE DUCHA
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO 1/2"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 1.40% 1.38% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 1.40% 1.38% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 1.20% 1.18% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUMINISTRO LAVATRAPEADOR PLATICO + ESTRUCTURA DE SOPORTE
- - - - - - 0.20% 0.20% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CARPINTERIA
- - - - - - 5.66% 5.57% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 5.66% 5.57% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE CARPINTERIA',)
- - - - - - 5.66% 5.57% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE FABRICACION INSTALACION CLOSETH
- - - - - - 1.79% 1.76% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE FABRICACION INSTALACION COCINAS
- - - - - - 3.87% 3.81% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS
- - - - - - 6.54% 6.44% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EQUIPAMIENTO DEL EDIFICIO
- - - - - - 2.27% 2.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 2.27% 2.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 2.27% 2.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO ELEVADOR
- - - - - - 2.27% 2.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESFOGUE DE CONEXION FINAL
- - - - - - 0.20% 0.20% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MOVIMIENTO DE TIERRA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCAVACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE DEMOLICION
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.10% 0.10% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AQUASTOP
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKA MALLA 1X100M
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SELECTO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 5003 M3
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 5001 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 2" X 2" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CORTE DE SISA EN CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO DE CONCRETO DE 16"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBERIA PVC 6" F949
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.09% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO ACABADOS CEMENTICIOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO RESANE DE ESTRUCTURA PRINCIPAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO TAPADERA HIERRO FUNDIDO
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CISTERNA DE AGUA POTABLE
- - - - - - 0.93% 0.91% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.66% 0.65% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.27% 0.26% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.25% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AQUASTOP
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EMULSION ASFALTICA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKATOP SEAL 107, KIT 16.3 KG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGARD 62, KIT 22 KG
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.20% 0.19% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.17% 0.17% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 2" X 2" X 10'
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PREFABRICADOS',)
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCALONES
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.26% 0.26% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.24% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO MANTENIMIENTO CISTERNA
- - - - - - 0.19% 0.19% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO TAPADERA HIERRO FUNDIDO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLANTA DE TRATAMIENTO
- - - - - - 2.62% 2.58% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPAMIENTO EDIFICIO',)
- - - - - - 0.52% 0.51% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPAMIENTO PTAR',)
- - - - - - 0.52% 0.51% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUMINISTRO E INSTALACION DE PTAR
- - - - - - 0.52% 0.51% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 1.89% 1.86% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.53% 0.52% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.49% 0.48% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.40% 0.39% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AQUASTOP
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EMULSION ASFALTICA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKATOP SEAL 107, KIT 16.3 KG
- - - - - - 0.24% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGARD 62, KIT 22 KG
- - - - - - 0.13% 0.13% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.42% 0.41% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.44% 0.43% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 2" X 2" X 10'
- - - - - - 0.12% 0.11% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.32% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PREFABRICADOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCALONES
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.20% 0.20% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO TAPADERA DE FIBRA 12 TON
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OTROS
- - - - - - 0.28% 0.28% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SELECTO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.21% 0.21% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.21% 0.21% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA Y CHAPEO
- - - - - - 0.19% 0.19% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TANQUE DE RETENCION
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.16% 0.16% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AQUASTOP
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EMULSION ASFALTICA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKATOP SEAL 107, KIT 16.3 KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGARD 62, KIT 22 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 2" X 2" X 10'
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PREFABRICADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCALONES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO TAPADERA HIERRO FUNDIDO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL 2
- - - - - - 2.43% 2.40% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 2 | MUROS
- - - - - - 1.51% 1.49% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 1.01% 1.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.60% 0.59% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.09% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.45% 0.44% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 3/3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE ALTA RESISTENCIA 7.2 MM G70
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.40% 0.39% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.28% 0.28% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.12% 0.11% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.49% 0.49% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.49% 0.49% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.44% 0.43% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.06% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 2 | LOSAS
- - - - - - 0.92% 0.91% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.53% 0.52% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.24% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4/4
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.26% 0.26% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL 3
- - - - - - 2.33% 2.29% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 3 | MUROS
- - - - - - 1.40% 1.38% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.91% 0.90% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.54% 0.54% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.43% 0.42% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE ALTA RESISTENCIA 7.2 MM G70
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.35% 0.35% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.10% 0.10% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.25% 0.25% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.49% 0.48% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.49% 0.48% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.44% 0.43% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 3 | LOSAS
- - - - - - 0.92% 0.91% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.53% 0.52% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.24% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4/4
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.26% 0.26% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL 4
- - - - - - 2.20% 2.16% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 4 | MUROS
- - - - - - 1.27% 1.25% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.80% 0.79% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.43% 0.42% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.37% 0.37% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE ALTA RESISTENCIA 7.2 MM G70
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.35% 0.35% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.06% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.30% 0.29% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.47% 0.46% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.47% 0.46% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.42% 0.41% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 4 | LOSAS
- - - - - - 0.92% 0.91% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.53% 0.52% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.24% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4/4
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.26% 0.26% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL 5
- - - - - - 2.09% 2.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 5 | MUROS
- - - - - - 1.17% 1.15% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.73% 0.72% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE ALTA RESISTENCIA 7.2 MM G70
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.34% 0.34% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.31% 0.30% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.44% 0.43% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.44% 0.43% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.39% 0.39% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 5 | LOSAS
- - - - - - 0.92% 0.91% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.53% 0.52% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.24% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4/4
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.26% 0.26% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL 6
- - - - - - 2.07% 2.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 6 | MUROS
- - - - - - 1.14% 1.12% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.70% 0.69% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.35% 0.35% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.24% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 3/3
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE ALTA RESISTENCIA 7.2 MM G70
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.34% 0.33% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.29% 0.28% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.43% 0.43% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.43% 0.43% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.39% 0.38% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.05% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 6 | LOSAS
- - - - - - 0.92% 0.91% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.53% 0.52% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.24% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4/4
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.26% 0.26% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL 7
- - - - - - 1.97% 1.94% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 7 | MUROS
- - - - - - 1.04% 1.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.61% 0.60% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.27% 0.27% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.11% 0.11% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 3/3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE ALTA RESISTENCIA 7.2 MM G70
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.22% 0.21% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.11% 0.11% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.43% 0.42% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.43% 0.42% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.38% 0.38% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.05% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 7 | LOSAS
- - - - - - 0.92% 0.91% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.53% 0.52% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.24% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4/4
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.26% 0.26% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL - ESTRUCTURA PRINCIPAL | NIVEL 1
- - - - - - 2.64% 2.60% 0.00% 20.79% 20.79% - - - 86291.59 -8629058.52% - - 100.00% - 0.00%
NIVEL 1 | LOSAS
- - - - - - 0.92% 0.91% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.53% 0.52% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.24% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4/4
- - - - - - 0.14% 0.14% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 1 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.26% 0.26% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.23% 0.23% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MATERIALES
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.37% 0.36% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.33% 0.32% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 1 | MUROS
- - - - - - 1.72% 1.69% 0.00% 32.00% 32.00% - - - 86310.41 -8630941.28% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 32.00% 32.00% - - - 207.49 -20648.80% - - 99.52% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 32.00% 32.00% - - - 207.49 -20648.80% - - 99.52% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 32.00% 32.00% - - - 207.49 -20648.80% - - 99.52% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.54% 0.53% 0.00% 32.00% 32.00% - - - 27144.18 -2714318.24% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.54% 0.53% 0.00% 32.00% 32.00% - - - 27144.18 -2714318.24% - - 100.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.48% 0.47% 0.00% 32.00% 32.00% - - - 24120.31 -2411931.04% - - 100.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.06% 0.06% 0.00% 32.00% 32.00% - - - 3023.87 -302287.20% - - 99.97% - 0.00%
('MATERIALES',)
- - - - - - 1.17% 1.15% 0.00% 32.00% 32.00% - - - 58958.74 -5895774.24% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 0.00% 32.00% 32.00% - - - 881.46 -88045.92% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.02% 0.02% 0.00% 32.00% 32.00% - - - 881.46 -88045.92% - - 99.89% - 0.00%
('CONCRETO',)
- - - - - - 0.43% 0.42% 0.00% 32.00% 32.00% - - - 21582.76 -2158175.52% - - 100.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.34% 0.33% 0.00% 32.00% 32.00% - - - 17048.00 -1704700.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.09% 0.09% 0.00% 32.00% 32.00% - - - 4534.76 -453375.52% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.73% 0.71% 0.00% 32.00% 32.00% - - - 36494.53 -3649352.80% - - 100.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.04% 0.04% 0.00% 32.00% 32.00% - - - 2222.14 -222114.08% - - 99.95% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.14% 0.14% 0.00% 32.00% 32.00% - - - 6924.62 -692361.76% - - 99.99% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.02% 0.02% 0.00% 32.00% 32.00% - - - 1033.58 -103258.40% - - 99.90% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.50% 0.49% 0.00% 32.00% 32.00% - - - 25168.37 -2516737.12% - - 100.00% - 0.00%
ACERO DE ALTA RESISTENCIA 7.2 MM G70
- - - - - - 0.02% 0.02% 0.00% 32.00% 32.00% - - - 1145.81 -114481.44% - - 99.91% - 0.00%