Modelo
(WBS)
Presupuesto
Base
Ajustes PSP
Ajustado
Anticipos Costo
Real
Costo
Ajustado
% Part % Part A % Av
Fin
% Av
Fis
Variación
%
Valor
Ganado
Ejecutado Variación
Q
CPI % CPI EAC VAC % VAC Ingreso Margen
Bruto
Ordenado por 80/20 (Peor CPI primero)
BOCONIA RESIDENCIALES
- - - - - - 100.00% 100.00% 89.36% 80.78% -8.58% - - - 0.90 9.61% - - -10.63% - 0.00%
SALON SOCIAL
- - - - - - 2.14% 2.13% 97.56% 44.51% -53.05% - - - 0.46 54.38% - - -119.18% - 0.00%
CASA CLUB
- - - - - - 2.14% 2.13% 97.56% 44.51% -53.05% - - - 0.46 54.38% - - -119.18% - 0.00%
ACABADOS GRISES
- - - - - - 0.29% 0.28% 62.83% 1.00% -61.83% - - - 0.02 98.41% - - -6183.49% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.14% 0.13% 111.70% 1.00% -110.70% - - - 0.01 99.10% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.14% 0.13% 111.70% 1.00% -110.70% - - - 0.01 99.10% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.12% 0.12% 122.58% 1.00% -121.58% - - - 0.01 99.18% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 1.00% 1.00% - - - 36.54 -3554.49% - - 97.26% - 0.00%
('MATERIALES',)
- - - - - - 0.16% 0.15% 20.42% 1.00% -19.42% - - - 0.05 95.10% - - -1941.76% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 596.00% 1.00% -595.00% - - - 0.00 99.83% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.52 47.99% - - -92.27% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 2275.19% 1.00% -2274.19% - - - 0.00 99.96% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 71.13% 1.00% -70.13% - - - 0.01 98.59% - - -7013.19% - 0.00%
MONOCAPA BLANCO EXTRA FINO
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 10.30% 1.00% -9.30% - - - 0.10 90.29% - - -930.15% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 879.01% 1.00% -878.01% - - - 0.00 99.89% - - 0.00% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.01% 0.01% 43.69% 1.00% -42.69% - - - 0.02 97.71% - - -4269.09% - 0.00%
BROCAS PARA MADERA DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON BLANCO
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.01% 0.01% 0.00% 1.00% 1.00% - - - 23.70 -2270.38% - - 95.78% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 3/8 X 6"
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 13.08% 1.00% -12.08% - - - 0.08 92.35% - - -1207.80% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 15.07% 1.00% -14.07% - - - 0.07 93.37% - - -1407.35% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.02% 0.02% 0.00% 1.00% 1.00% - - - 47.53 -4652.75% - - 97.90% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.27 73.32% - - -274.81% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.27 73.32% - - -274.81% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 14.86 -1386.14% - - 93.27% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 14.86 -1386.14% - - 93.27% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 1.00% 1.00% - - - 16.12 -1512.37% - - 93.80% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 1.00% 1.00% - - - 16.12 -1512.37% - - 93.80% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.03% 0.03% 0.00% 1.00% 1.00% - - - 104.81 -10381.28% - - 99.05% - 0.00%
IMPERMEABILIZANTE
- - - - - - 0.03% 0.03% 0.00% 1.00% 1.00% - - - 104.81 -10381.28% - - 99.05% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.07% 0.00% 1.00% 1.00% - - - 225.10 -22409.70% - - 99.56% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.07% 0.07% 0.00% 1.00% 1.00% - - - 225.10 -22409.70% - - 99.56% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO PVC GRIS DE 2" X 3 MTS
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COPLA PVC GRIS DE 2" ELECTRICIDAD
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO PVC GRIS DE 1" X 3 MTS
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VUELTA PVC GRIS DE 2"
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 1.55 -55.26% - - 35.59% - 0.00%
('EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 1.55 -55.26% - - 35.59% - 0.00%
ANDAMIOS
- - - - - - 0.00% 0.00% 0.00% 1.00% 1.00% - - - 1.55 -55.26% - - 35.59% - 0.00%
PRELIMINARES
- - - - - - 0.03% 0.02% 891.52% 100.00% -791.52% - - - 0.11 88.78% - - -791.52% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 101148.17% 100.00% -101048.17% - - - 0.00 99.90% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 15555.19% 100.00% -15455.19% - - - 0.01 99.36% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 15555.19% 100.00% -15455.19% - - - 0.01 99.36% - - 0.00% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO - MAT + MO / ELECTRICIDAD ESPECIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SUMINISTRO E INSTALACION HIDRAULICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.01% 0.01% 169.67% 100.00% -69.67% - - - 0.59 41.06% - - -69.67% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.01% 0.01% 169.67% 100.00% -69.67% - - - 0.59 41.06% - - -69.67% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1944.94 -194394.00% - - 99.95% - 0.00%
VIAJES DE SELECTO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 65.61% 100.00% 34.39% - - - 1.52 -52.42% - - 34.39% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 13.01 -1201.00% - - 92.31% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 13.01 -1201.00% - - 92.31% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 66.38 -6538.00% - - 98.49% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 66.38 -6538.00% - - 98.49% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON TRANSPARENTTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN POLVO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMENTO PVC GALON
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5591.47 -559047.00% - - 99.98% - 0.00%
IMPREVISTOS
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5591.47 -559047.00% - - 99.98% - 0.00%
CIMENTACION
- - - - - - 0.19% 0.18% 167.48% 100.00% -67.48% - - - 0.60 40.29% - - -67.48% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 259.09% 100.00% -159.09% - - - 0.39 61.40% - - -159.09% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 259.09% 100.00% -159.09% - - - 0.39 61.40% - - -159.09% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.05% 0.05% 188.16% 100.00% -88.16% - - - 0.53 46.85% - - -88.16% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3922.16 -392116.00% - - 99.97% - 0.00%
('MATERIALES',)
- - - - - - 0.12% 0.12% 114.28% 100.00% -14.28% - - - 0.88 12.50% - - -14.28% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 1144.34% 100.00% -1044.34% - - - 0.09 91.26% - - -1044.34% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 506.95 -50595.00% - - 99.80% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 174.03% 100.00% -74.03% - - - 0.57 42.54% - - -74.03% - 0.00%
NYLON BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 686.10 -68510.00% - - 99.85% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 155.03% 100.00% -55.03% - - - 0.65 35.50% - - -55.03% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 155.03% 100.00% -55.03% - - - 0.65 35.50% - - -55.03% - 0.00%
('CONCRETO',)
- - - - - - 0.08% 0.08% 135.87% 100.00% -35.87% - - - 0.74 26.40% - - -35.87% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5400.08 -539908.00% - - 99.98% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.06% 0.06% 0.00% 100.00% 100.00% - - - 19050.46 -1904946.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 5.74% 100.00% 94.26% - - - 17.41 -1641.24% - - 94.26% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 70.91% 100.00% 29.09% - - - 1.41 -41.02% - - 29.09% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 583.75 -58275.00% - - 99.83% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5872.13 -587113.00% - - 99.98% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1205.18 -120418.00% - - 99.92% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 80.89% 100.00% 19.11% - - - 1.24 -23.63% - - 19.11% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.62 -2662.00% - - 96.38% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.62 -2662.00% - - 96.38% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 122.46 -12146.00% - - 99.18% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 122.46 -12146.00% - - 99.18% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 537.16 -53616.00% - - 99.81% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 396.44 -39544.00% - - 99.75% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 140.72 -13972.00% - - 99.29% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1470.58 -146958.00% - - 99.93% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1208.69 -120769.00% - - 99.92% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 261.89 -26089.00% - - 99.62% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VIAJES DE SELECTO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LOSAS
- - - - - - 0.47% 0.46% 119.77% 100.00% -19.77% - - - 0.83 16.51% - - -19.77% - 0.00%
('MATERIALES',)
- - - - - - 0.27% 0.26% 126.09% 100.00% -26.09% - - - 0.79 20.69% - - -26.09% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 9096.08% 100.00% -8996.08% - - - 0.01 98.90% - - -8996.08% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.96 -2496.00% - - 96.15% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 18221.26% 100.00% -18121.26% - - - 0.01 99.45% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 1300.89% 100.00% -1200.89% - - - 0.08 92.31% - - -1200.89% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 1300.89% 100.00% -1200.89% - - - 0.08 92.31% - - -1200.89% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 540.67% 100.00% -440.67% - - - 0.18 81.50% - - -440.67% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 329.51 -32851.00% - - 99.70% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1247.16 -124616.00% - - 99.92% - 0.00%
FORMALETA DE MADERA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 402.84 -40184.00% - - 99.75% - 0.00%
PARALES DE 3" X 4" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 479.60% 100.00% -379.60% - - - 0.21 79.15% - - -379.60% - 0.00%
('CONCRETO',)
- - - - - - 0.08% 0.08% 177.17% 100.00% -77.17% - - - 0.56 43.56% - - -77.17% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11715.63 -1171463.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.05% 0.04% 0.00% 100.00% 100.00% - - - 13791.51 -1379051.00% - - 99.99% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.01% 0.01% 101.57% 100.00% -1.57% - - - 0.98 1.54% - - -1.57% - 0.00%
BLOCK DE 19X19X19.5 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 126.66 -12566.00% - - 99.21% - 0.00%
BLOCK POMEZ DE 20X20X40CM
- - - - - - 0.01% 0.01% 106.17% 100.00% -6.17% - - - 0.94 5.81% - - -6.17% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.14% 0.14% 54.32% 100.00% 45.68% - - - 1.84 -84.11% - - 45.68% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9068.79 -906779.00% - - 99.99% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 69.15% 100.00% 30.85% - - - 1.45 -44.61% - - 30.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.02% 0.01% 79.01% 100.00% 20.99% - - - 1.27 -26.56% - - 20.99% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.02% 0.02% 81.78% 100.00% 18.22% - - - 1.22 -22.27% - - 18.22% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 27.91% 100.00% 72.09% - - - 3.58 -258.34% - - 72.09% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.05% 0.05% 87.02% 100.00% 12.98% - - - 1.15 -14.92% - - 12.98% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3424.84 -342384.00% - - 99.97% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1342.43 -134143.00% - - 99.93% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 13.32 -1232.00% - - 92.49% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 13.32 -1232.00% - - 92.49% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 312.87 -31187.00% - - 99.68% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 312.87 -31187.00% - - 99.68% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3311.65 -331065.00% - - 99.97% - 0.00%
IMPREVISTOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2522.53 -252153.00% - - 99.96% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 789.12 -78812.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.20% 0.20% 112.04% 100.00% -12.04% - - - 0.89 10.74% - - -12.04% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.20% 0.20% 112.04% 100.00% -12.04% - - - 0.89 10.74% - - -12.04% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.19% 0.18% 110.72% 100.00% -10.72% - - - 0.90 9.68% - - -10.72% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 4091.18 -409018.00% - - 99.98% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.01% 0.01% 102.70% 100.00% -2.70% - - - 0.97 2.63% - - -2.70% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.01% 0.01% 102.70% 100.00% -2.70% - - - 0.97 2.63% - - -2.70% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.01% 0.01% 102.70% 100.00% -2.70% - - - 0.97 2.63% - - -2.70% - 0.00%
MUROS
- - - - - - 0.29% 0.28% 108.17% 100.00% -8.17% - - - 0.92 7.56% - - -8.17% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.14% 0.14% 135.38% 100.00% -35.38% - - - 0.74 26.13% - - -35.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.14% 0.14% 135.38% 100.00% -35.38% - - - 0.74 26.13% - - -35.38% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.14% 0.14% 136.56% 100.00% -36.56% - - - 0.73 26.77% - - -36.56% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 382.29 -38129.00% - - 99.74% - 0.00%
('MATERIALES',)
- - - - - - 0.15% 0.14% 81.57% 100.00% 18.43% - - - 1.23 -22.59% - - 18.43% - 0.00%
('MADERA',)
- - - - - - 0.02% 0.01% 189.41% 100.00% -89.41% - - - 0.53 47.20% - - -89.41% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 64.92 -6392.00% - - 98.46% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1312.93 -131193.00% - - 99.92% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 270.55% 100.00% -170.55% - - - 0.37 63.04% - - -170.55% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.03% 0.02% 125.91% 100.00% -25.91% - - - 0.79 20.58% - - -25.91% - 0.00%
BLOCK DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.03% 0.02% 91.22% 100.00% 8.78% - - - 1.10 -9.63% - - 8.78% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.06% 0.05% 73.04% 100.00% 26.96% - - - 1.37 -36.91% - - 26.96% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.33% 100.00% 28.67% - - - 1.40 -40.19% - - 28.67% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 113.58 -11258.00% - - 99.12% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 113.48% 100.00% -13.48% - - - 0.88 11.88% - - -13.48% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 99.48% 100.00% 0.52% - - - 1.01 -0.52% - - 0.52% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 97.58% 100.00% 2.42% - - - 1.02 -2.48% - - 2.42% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 19.13% 100.00% 80.87% - - - 5.23 -422.87% - - 80.87% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.02% 0.02% 49.57% 100.00% 50.43% - - - 2.02 -101.72% - - 50.43% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.02% 0.02% 69.50% 100.00% 30.50% - - - 1.44 -43.88% - - 30.50% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.01% 0.01% 112.39% 100.00% -12.39% - - - 0.89 11.03% - - -12.39% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 53.95% 100.00% 46.05% - - - 1.85 -85.37% - - 46.05% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 232.02 -23102.00% - - 99.57% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 232.02 -23102.00% - - 99.57% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 739.54 -73854.00% - - 99.86% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 739.54 -73854.00% - - 99.86% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA MADERA DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1953.85 -195285.00% - - 99.95% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1441.99 -144099.00% - - 99.93% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 511.86 -51086.00% - - 99.80% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2123.87 -212287.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1301.19 -130019.00% - - 99.92% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 822.68 -82168.00% - - 99.88% - 0.00%
('CONCRETO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2354.73 -235373.00% - - 99.96% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2354.73 -235373.00% - - 99.96% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 192.00 -19100.00% - - 99.48% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 192.00 -19100.00% - - 99.48% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 192.00 -19100.00% - - 99.48% - 0.00%
ACABADOS FINALES
- - - - - - 0.87% 0.90% 58.31% 0.00% -58.31% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ANDAMIOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.19% 0.23% 35.28% 0.00% -35.28% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.01% 103.55% 0.00% -103.55% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 6/6 CORRUGADA
- - - - - - 0.00% 0.00% 109.54% 0.00% -109.54% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 394.27% 0.00% -394.27% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 494.31% 0.00% -494.31% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 79.01% 0.00% -79.01% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 11.72% 0.00% -11.72% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 110.43% 0.00% -110.43% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 246.75% 0.00% -246.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.03% 0.03% 25.87% 0.00% -25.87% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA BLANCO EXTRA FINO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.01% 0.01% 69.40% 0.00% -69.40% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 277.94% 0.00% -277.94% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 995.31% 0.00% -995.31% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 131.35% 0.00% -131.35% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 121.88% 0.00% -121.88% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO PVC GRIS DE 2" X 3 MTS
- - - - - - 0.00% 0.00% 342.64% 0.00% -342.64% - - - 0.00 100.00% - - 0.00% - 0.00%
COPLA PVC GRIS DE 2" ELECTRICIDAD
- - - - - - 0.00% 0.00% 88.13% 0.00% -88.13% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO PVC GRIS DE 1" X 3 MTS
- - - - - - 0.00% 0.00% 30.68% 0.00% -30.68% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA DE AISLAR SCOTCH
- - - - - - 0.00% 0.00% 26.06% 0.00% -26.06% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 2.29% 0.00% -2.29% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAFLEX 1A GRIS 300 ML
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BANDEJA PARA PINTURA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANERAL PARA PINTURA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN POLVO
- - - - - - 0.00% 0.00% 12.24% 0.00% -12.24% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FORMALETA DE MADERA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPREVISTOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.02% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FELPA SIN RODILLO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
THINNER
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA MUROS MO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.02% 0.03% 166.41% 0.00% -166.41% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO BRASILIA DE 43 X 43
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 1116.19% 0.00% -1116.19% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 28.87% 0.00% -28.87% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.00% 0.00% 23.59% 0.00% -23.59% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO CERAMICO 20X30
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA AVELLANA MA 20X66 A
- - - - - - 0.00% 0.00% 5057.85% 0.00% -5057.85% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 796.55% 0.00% -796.55% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE ARENA CON ARENA COLOR CHOCOLATE
- - - - - - 0.00% 0.00% 91.43% 0.00% -91.43% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.03% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO REDONDO ECOLINE - AMERICAN STANDARD
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MINGITORIO ARTICO 307-R LLAVE PUSH BI INCESA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LLAVE P/LAVAMANOS SENCILLA FOSET
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE CON REJILLA CUADRADA P/DUCHA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO DE ABASTO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHAPETA CROMADA DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/2 A LA PARED
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.03% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO 8'X4'X1/2" ULTRALIGHT
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO 8'X4'X1/2" ANTI-MOHO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANALETA CARGA 1-5/8" X 12' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL LISTON CARGA 1 1/2"X12' CAL 26 LMS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REBORDE TIPO "J" 10'
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE GALVANIZADO CALIBRE 12
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE GALVANIZADO CALIBRE 16
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ANGULAR 1"X10' CAL 26
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIN CLIP DE 1 1/4"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO CINTA DE PAPEL JUNTAS 2 (76.2M)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO FULMINANTE CAL 27
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO LIJA PARA AGUA NO. 150
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO LIJA PARA AGUA NO. 220
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO MASILLA CUBETA 28 KG USG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO TACHUELON 1"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO TORNILLO PUNTA BROCA 1/2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO TORNILLO R-FINA NO. 6 X 1 PUNTA NORMAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.68% 0.67% 66.54% 0.00% -66.54% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE CARPINTERIA',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO INSTALACION DE PUERTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO SUMINISTRO DE PUERTAS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO - MAT + MO / ELECTRICIDAD ESPECIALES
- - - - - - 0.06% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE VENTANERIA',)
- - - - - - 0.25% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO INSTALACION DE VENTANERIA
- - - - - - 0.25% 0.24% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.01% 0.01% 345.54% 0.00% -345.54% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.01% 0.01% 345.54% 0.00% -345.54% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SUMINISTRO E INSTALACION HIDRAULICAS
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO INSTALACION DE ARTEFACTOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.10% 322.64% 0.00% -322.64% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 48103.79% 0.00% -48103.79% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.07% 0.07% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO PULIDO DE CONCRETO
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.13% 0.13% 64.59% 0.00% -64.59% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO INSTALACION DE BARANDA
- - - - - - 0.13% 0.13% 64.59% 0.00% -64.59% - - - 0.00 100.00% - - 0.00% - 0.00%
INDIRECTOS DE OBRA
- - - - - - 10.56% 10.21% 149.53% 77.90% -71.63% - - - 0.52 47.90% - - -91.96% - 0.00%
INDIRECTOS
- - - - - - 10.56% 10.21% 149.53% 77.90% -71.63% - - - 0.52 47.90% - - -91.96% - 0.00%
SERVICIOS
- - - - - - 0.26% 0.25% 224.54% 75.00% -149.54% - - - 0.33 66.60% - - -199.38% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.26% 0.25% 5.16% 75.00% 69.84% - - - 14.55 -1354.85% - - 93.13% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.26% 0.25% 3.61% 75.00% 71.39% - - - 20.78 -1978.36% - - 95.19% - 0.00%
INSTALACIONES PROVISIONALES
- - - - - - 0.26% 0.25% 0.00% 75.00% 75.00% - - - 58194.00 -5819300.00% - - 100.00% - 0.00%
CISTERNA DE AGUA
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RIPIO
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SERVICIOS BASICOS',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INTERNET OFICINA
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ENERGIA ELECTRICA
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AGUA
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SERVICIOS CONTRATADOS',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUBLICIDAD
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGULAR
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IDP REGULAR
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
HERRAMIENTO Y EQUIPO
- - - - - - 2.42% 2.34% 192.44% 80.00% -112.44% - - - 0.42 58.43% - - -140.55% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 8481.95% 80.00% -8401.95% - - - 0.01 99.06% - - 0.00% - 0.00%
('SEGURIDAD INDUSTRIAL',)
- - - - - - 0.01% 0.01% 484.28% 80.00% -404.28% - - - 0.17 83.48% - - -505.35% - 0.00%
TAPON DE OIDOS CON CAJA BULLHE HP 22DB
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAMISA T-SHIRT, CINTA REFLECTIVA. 50 MEDIUM Y 50 LARGE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ROTULOS DE SE?ALIZAICON
- - - - - - 0.01% 0.01% 0.00% 80.00% 80.00% - - - 1876.84 -187584.00% - - 99.95% - 0.00%
CINTA REFLECTIVA 3M ROJO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CERCA PLASTICA LIMITACION NARANJA
- - - - - - 0.00% 0.00% 762.40% 80.00% -682.40% - - - 0.10 89.51% - - -853.00% - 0.00%
CINTA DE PELIGRO COLOR ROJO
- - - - - - 0.00% 0.00% 25.33% 80.00% 54.67% - - - 3.16 -215.79% - - 68.33% - 0.00%
CINTA DE PRECAUCION COLOR AMARILLO
- - - - - - 0.00% 0.00% 50.67% 80.00% 29.33% - - - 1.58 -57.89% - - 36.67% - 0.00%
('ACABADOS',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA PARA LLAVES
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE LAMINA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACEITE DW 40 11 ONZ AFLOJALO TODO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPUMA LIMPIADORA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICON PARA TABLEROS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TAPAGOTERA DE ALUMINIO 01*10M
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAMENT-1 ADITIVO ACELERANTE P/CONCRETO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR COMBIFLEX
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ANTISOL BLANCO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIURETANO MARCA DYMONIC 100
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICONE SISTA 280ML BLANCO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('BOTIQUIN',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLAS HÚMEDAS O PAÑUELOS DESECHABLES
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CARPINTERIA',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BISAGRA 4 X 4 DORADAS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DIESEL
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUPER
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGULAR
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IDP REGULAR
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IDP SUPER
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IDP DIESEL
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPIGAS DE HULE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOMACORRIENTE DOBLE POLARIZADO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOMACORRIENTE DE SOBRE PONER
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COPLA CONDUIT DE 4"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CABLE TSJ 3' X 12'
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CABLE THHN # 10
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLETA RADIANT RDZBK 15AMP 125V 2USB+RECEPTACULO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FOCO LED 13W PAR30IP65
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTENSION ELECTRICA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FLEXITUBO 1/2"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO REDONDO HIERRO NEGRO 1" CHAPA 16
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GUIA P/ELECTRICISTA METALICA P/ CABLE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BOMBILLA NORMAL 100W
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CABLE PARALELO #12
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CABLE TSJ 2X12
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA DE AISLAR SCOTCH
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLAFONERA LED DE 18W
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAMPARA LED 2L 20W 3K
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPAMENTO',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLA PLEGABLE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA MADERA DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #150 H-98 O C-99 3M
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DE 9"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 9"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 1"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 2''
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 9"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICON BLANCO 10.1Z ML
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO DE 1/4"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COSTALES VACIOS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAMINA GAL. DE 12 PIES 28MM ACANALADA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIERRA SANDFLEX
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANGUERA P/PASAR NIVELES 1/2"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3/4"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON BLANCO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TELA DE REFUERZO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN POLVO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 100 P/AGUA BASE DE LONA 3M
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BARRA ROSCADA 9.5 MM ( 3 / 8 ) X UN METRO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 36 BASE DE AGUA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LLAVERO CON ETIQUETA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA MADERA DE 1"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACEITE DE RICINO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 7 X 1/2"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 240 P/AGUA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 400 P/AGUA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA MADERA DE 1/2 (ESTACONES)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MINI FELPAS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COSTANERA LEGITIMA DE 5"X6MTS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO DE 4"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FELPA DE 4"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCA DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACIDO MURIATICO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 1''
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO RECTANGULAR DE ALUMINIO DE 1 3/4" X 3" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO CIRCULAR CORTE DE MADERA 7 1/4''
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO DE ALAMBRE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 220 BASE DE AGUA 3M
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEDAZO METALICO 3/16"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANDADO YALE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 5/8 X 8"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAMINA GAL. DE 10 PIES 28MM ACANALADA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 3/8 X 6"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIA VIDRIO LIQUIDO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AMBIENTAL GLADE 400 ML
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DETERGENTE ESPUMIL 1000 GRS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESINFECTANTE OLIMPO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIQUIDO ATRAPA POLVO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA DE MICROFIBRA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ATOMIZADOR GUATEPLAST 32 ONZ
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SQUEEGEE LIMPIADOR DE VIDRIOS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA DE MICROFIBRA 20U SURTIDO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JABON EN GEL ANTIBACTERIAL
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALCOHOL EN GEL ANTIBACTERIAL
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA DE MANOS UNIVERSAL TK BLANCA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PAPEL TOALLA PARA MANOS BLANCA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BOLSAS GRANDES PARA BASURA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIADOR DE EFLORESCENCIA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PAPEL HIGIENICO 8 ROLLOS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLON DE 2" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 4" X 4" X 10'
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TARIMA DE MADERA DE POLIN C/CABOTE 40''X48''
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MARCADOR DE ESQUINA TRUPER 15121
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPERMEABILIZANTE FASTYL
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SELLADOR ACRILICO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
THINNER
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 1 1/2"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN SPRAY
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SELLADOR MULTIFUNCIONAL 6000 MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REDUCIDOR DE 3/4" X 1 1/2" PVC
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TEE DE 1 1/4" PVC
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CODO DE 1 1/2" X 45 PVC AP
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TAPON HEMBRA DE 1" PVC
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TEFLON DE 3/4"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIPLE DE 1" X 3" HG
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
UNION DE 1" PVC
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LLAVE STILSON
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTROS PARA HERRAMIENTAS',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO P/CORTE D/CONCRETO DE 4"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CABO PARA PALA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CABO PARA PIOCHA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CABO PARA AZADON
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28 KG
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPONJA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASILLA PARA GRIETAS EXT/INT. MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLANCHA DE THERMOPOR DE 2*50*100 CM
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE GALVANIZADO CALIBRE 10
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 12*1" PUNTA DE BROCA CON ARANDELA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.24% 0.23% 478.33% 80.00% -398.33% - - - 0.17 83.28% - - -497.91% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.24% 0.23% 460.50% 80.00% -380.50% - - - 0.17 82.63% - - -475.63% - 0.00%
VIAJES DE RIPIO Y VARIOS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FLETES
- - - - - - 0.24% 0.23% 206.68% 80.00% -126.68% - - - 0.39 61.29% - - -158.35% - 0.00%
FLETES DE CAMION 5 TONELADAS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FLETES DE CAMION DOBLE EJE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FILTRO PARA AGUA PACIFIC FILTERS DE 3 ETAPAS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER DE SANITARIOS PORTATILES
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.12% 0.11% 414.37% 80.00% -334.37% - - - 0.19 80.69% - - -417.96% - 0.00%
('SEGURIDAD INDUSTRIAL',)
- - - - - - 0.12% 0.11% 125.20% 80.00% -45.20% - - - 0.64 36.10% - - -56.50% - 0.00%
GUANTE DE PROTECCION
- - - - - - 0.01% 0.01% 575.30% 80.00% -495.30% - - - 0.14 86.09% - - -619.12% - 0.00%
LENTES PROTECTORES
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 573.44 -57244.00% - - 99.83% - 0.00%
LINEA DE VIDA CON GANCHO GRANDE
- - - - - - 0.02% 0.02% 0.00% 80.00% 80.00% - - - 3918.77 -391776.80% - - 99.97% - 0.00%
ARNES
- - - - - - 0.01% 0.01% 0.00% 80.00% 80.00% - - - 3023.10 -302210.40% - - 99.97% - 0.00%
ALCOHOLIMETRO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CUBRENUCA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTINTOR 10 LBS
- - - - - - 0.00% 0.00% 14.57% 80.00% 65.43% - - - 5.49 -449.09% - - 81.79% - 0.00%
LENTES DE PROTECCION CLAROS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LENTES DE PROTECCION OSCUROS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECIBELIMETRO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BOTAS INDUSTRIALES
- - - - - - 0.05% 0.05% 108.80% 80.00% -28.80% - - - 0.74 26.47% - - -36.00% - 0.00%
CASCO DE PROTECCION
- - - - - - 0.01% 0.01% 71.36% 80.00% 8.64% - - - 1.12 -12.10% - - 10.80% - 0.00%
TAPON DE OIDOS
- - - - - - 0.00% 0.00% 63.96% 80.00% 16.04% - - - 1.25 -25.08% - - 20.05% - 0.00%
MASCARILLA C/VALVULA DE CARBON
- - - - - - 0.01% 0.01% 0.00% 80.00% 80.00% - - - 2401.28 -240028.00% - - 99.96% - 0.00%
CHALECO REFLECTIVO
- - - - - - 0.00% 0.00% 308.13% 80.00% -228.13% - - - 0.26 74.04% - - -285.16% - 0.00%
BOTAS DE HULE PUNTA DE ACERO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MARCO DE ANDAMIO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA ELECTRICA',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ATORNILLADOR 18V. MILWAUKEE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PULIDORA TIPO ESMERILADORA 4 1/2" PULG. 1100W
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISTOLA DE CALOR TRUPER
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIERRA ELECTRICA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RENTA DE COMPRESOR
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ROTOMARTILLO INDUSTRIAL
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BARRENO ROTOMARTILLO ELEC. TRUPER 1/2
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIERRA CIRCULAR INDUSTRIAL
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL LASER AUTONIVELANTE 2 LÍNEAS VERTICAL Y HORIZONTAL MARCA DEWALT
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CUBETAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TIJERA PARA CORTAR LAMINA 10" (524101)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERRUCHO PARA TABLAYESO 12" TOTAL (3006)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TIRALINEAS DE PLASTICO 30M TRUPER
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA 4" INOXIDABLE MANGO DE PLASTICO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANGUERA P/AGUA DE 1/2" COLOR VERDE 30 MTS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MACHETE TIPO VIZCANIO DE 14"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAIMAN 24"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PALA CON CABO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
HACHA C/ CABO 3.5 LBS.
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIOCHA C/CABO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PALAS METALICAS PARA RECOGER BASURA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCUADRILON DE 16' X 24'
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RADIO COMUNICADOR PORTATIL
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DEPOSITO ROTOPLAS DE 1,100 LITROS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL 3 BURBUJAS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TENAZA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BARRETAS LARGAS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA METALICA DE 2" MANGO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JUEGO SIERRA BANDA M-18 FUEL CORTE 5" MILWAUKEE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISTOLA PARA CALAFATEO SENCILLA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RADIO COMUNICADOR PORTATIL
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BOMBA MANUAL PARA BARRIL
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DEPOSITO ROTOPLAS DE 2,500 LITROS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUNTERO CON EMPUÑADURA 3/4X12
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CARRETA DE MANO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COBA DE 8" CON CABO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZADON C/CABO DE 3 LIBRAS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIVEL DE 100' C/YESO AZUL IRWIN
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALMADANA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BOMBA PARA FUMIGAR (MATABI)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISTOLA PLASTICA TRUPER DE 8"
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SACATIERRAS CLASSIC
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCALERA DE ALUMINIO 2 BANDAS 5 PIES
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTENSION 6 PIES X 1 3/4 P/PLANCHON DE MAGNESIO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CUCHILLA PRECORTADA 18MM CON ESTUCHE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 5 TRUPER
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 10' TRUPER
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 12' TRUPER
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
HILO NYLON P/ALBAÑIL
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MARTILLO C/SACA CLAVOS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SEGUETA PARA SIERRA BANDA PORTÁTIL M-18 MILWAUKEE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINCEL PARA ROTOMARTILLO BOSCH
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUNTA PARA ROTOMARTILLO BOCH
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINCEL CON PUNTA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUNTA PARA CONCRETO SDS MAX
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 2.05% 1.98% 88.27% 80.00% -8.27% - - - 0.91 9.37% - - -10.34% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 2.05% 1.98% 85.59% 80.00% -5.59% - - - 0.93 6.54% - - -6.99% - 0.00%
ALQUILER DE MAQUINARIA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
HERRAMIENTAS Y EQUIPO
- - - - - - 2.05% 1.98% 40.47% 80.00% 39.53% - - - 1.98 -97.70% - - 49.42% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VIBRO COMPACTADORA BAILARINA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER VIBRO COMPACTADORA BAILARINA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER TORNILLOS NIVELADORES
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RENTA DE COMPACTADORA BAILARINA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RENTA DE MINICARGADOR CON BRAZO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RENTA DE RODO VIBRADOR NO TRIPULADO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SERVICIO Y MANTENIMIENTO',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIOS Y MANTENIMIENTOS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO DE COMPUTO E IMPRESORAS',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AIRE COMPRIMIDO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MEGAFONO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS ADMINISTRATIVOS',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ATENCION AL PERSONAL
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS INDIRECTOS',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARQUEOS Y PEAJES
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PAPELERIA Y UTILES',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PAPEL P/ FOTOCOPIADORA CARTA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MARCADOR PERMANENTE
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TIJERA MULTIUSOS SCOTCH
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BATERIAS DOBLE A
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BATERIA AAA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PAPELERIA Y UTILES
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SERVICIOS BASICOS',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TELEFONO E INTERNET
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE VENTANERIA',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPARACION Y MANTENIMIENTO
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 80.00% 80.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA ADMINISTRATIVO
- - - - - - 1.15% 1.11% 177.19% 75.00% -102.19% - - - 0.42 57.67% - - -136.26% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 1.15% 1.11% 61.70% 75.00% 13.30% - - - 1.22 -21.56% - - 17.74% - 0.00%
('SERVICIOS CONTRATADOS',)
- - - - - - 0.85% 0.83% 66.25% 75.00% 8.75% - - - 1.13 -13.21% - - 11.67% - 0.00%
HONORARIOS PROFESIONALES
- - - - - - 0.85% 0.83% 66.25% 75.00% 8.75% - - - 1.13 -13.21% - - 11.67% - 0.00%
('SERVICIOS BASICOS',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE SEGURIDAD
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS ADMINISTRATIVOS',)
- - - - - - 0.29% 0.28% 0.00% 75.00% 75.00% - - - 66150.00 -6614900.00% - - 100.00% - 0.00%
SUPERVISOR SEGURIDAD INDUSTRIAL
- - - - - - 0.29% 0.28% 0.00% 75.00% 75.00% - - - 66150.00 -6614900.00% - - 100.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IGSS PATRONAL
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BONIF. DECRETO
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IRTRA
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INTECAP
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BONO 14
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AGUINALDO
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INDEMNIZACION
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA AYUDANTE
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA SEGURIDAD INDUSTRIAL
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA BODEGUERO
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VACACIONES
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA ALBAÑIL / MAESTRO DE OBRA
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGULAR
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IDP REGULAR
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA OPERATIVO
- - - - - - 2.52% 2.43% 152.12% 75.00% -77.12% - - - 0.49 50.70% - - -102.83% - 0.00%
('MANO DE OBRA',)
- - - - - - 1.73% 1.67% 151.03% 75.00% -76.03% - - - 0.50 50.34% - - -101.37% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 1.73% 1.67% 151.03% 75.00% -76.03% - - - 0.50 50.34% - - -101.37% - 0.00%
IGSS PATRONAL
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BONIF. DECRETO
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IRTRA
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INTECAP
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BONO 14
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AGUINALDO
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INDEMNIZACION
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA AYUDANTE
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA SEGURIDAD INDUSTRIAL
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 1.73% 1.67% 52.60% 75.00% 22.40% - - - 1.43 -42.59% - - 29.87% - 0.00%
PROVISION PRESTACIONES
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA BODEGUERO
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA ELECTRICIDAD
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VACACIONES
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA ALBAÑIL / MAESTRO DE OBRA
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 0.79% 0.76% 65.27% 75.00% 9.73% - - - 1.15 -14.90% - - 12.97% - 0.00%
('SERVICIOS BASICOS',)
- - - - - - 0.21% 0.20% 232.77% 75.00% -157.77% - - - 0.32 67.78% - - -210.36% - 0.00%
SERVICIO DE SEGURIDAD
- - - - - - 0.21% 0.20% 232.77% 75.00% -157.77% - - - 0.32 67.78% - - -210.36% - 0.00%
('GASTOS ADMINISTRATIVOS',)
- - - - - - 0.58% 0.56% 0.28% 75.00% 74.72% - - - 266.28 -26528.42% - - 99.62% - 0.00%
ATENCION AL PERSONAL
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MAESTRO DE OBRA
- - - - - - 0.35% 0.33% 0.00% 75.00% 75.00% - - - 78750.00 -7874900.00% - - 100.00% - 0.00%
BODEGUERO
- - - - - - 0.24% 0.23% 0.00% 75.00% 75.00% - - - 54032.62 -5403162.50% - - 100.00% - 0.00%
('SERVICIOS CONTRATADOS',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
HONORARIOS PROFESIONALES
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.00% 0.00% 0.00% 75.00% 75.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES PROVISIONALES
- - - - - - 0.73% 0.70% 189.67% 100.00% -89.67% - - - 0.53 47.28% - - -89.67% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.73% 0.70% 35.43% 100.00% 64.57% - - - 2.82 -182.27% - - 64.57% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.73% 0.70% 34.70% 100.00% 65.30% - - - 2.88 -188.17% - - 65.30% - 0.00%
INSTALACIONES PROVISIONALES
- - - - - - 0.64% 0.62% 0.00% 100.00% 100.00% - - - 192850.00 -19284900.00% - - 100.00% - 0.00%
CISTERNA DE AGUA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER DE SANITARIOS PORTATILES
- - - - - - 0.09% 0.09% 275.54% 100.00% -175.54% - - - 0.36 63.71% - - -175.54% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FLETES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CUBETAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CARRETA DE MANO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SEGURIDAD INDUSTRIAL',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASCARILLAS DESECHABLES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TERMINAL BIOMETRICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONSUMIBLES CAFETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BOLSA PLASTICA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO DE COMPUTO E IMPRESORAS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPUTADORAS DE ESCRITORIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS INDIRECTOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARQUEOS Y PEAJES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PAPELERIA Y UTILES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MARCADOR RESALTADOR FABER CASTELL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MARCADOR PERMANENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TIJERA MULTIUSOS SCOTCH
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ENGRAPADORA FAST
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CARGADOR PARA BATERIAS AA / AAA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAPICEROS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PAPELERIA Y UTILES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SERVICIOS CONTRATADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LONA VINILICA 3.3X0.80
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LONA VINILICA 2X2 MTS FULL COLOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE LAMINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ANTISOL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICONE SISTA 280ML BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CARPINTERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BISAGRA 4 X 4 DORADAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BISAGRA 3 X 3 GRIS NIQUEL MATE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGULAR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IDP REGULAR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IDP SUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPIGAS DE HULE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOMACORRIENTE DOBLE POLARIZADO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COPLA PVC GRIS DE 2" ELECTRICIDAD
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA MADERA DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 2''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAMINA GAL. DE 12 PIES 28MM ACANALADA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIERRA SANDFLEX
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAMINA 12' ACANALADA COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LONA VINILICA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FELPA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO + BANDEJA + MANERAL DE 9"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 1''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO CIRCULAR CORTE DE MADERA 7 1/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANDADO YALE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAMINA GAL. DE 10 PIES 28MM ACANALADA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DETERGENTE ESPUMIL 1000 GRS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JABON EN GEL ANTIBACTERIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 2" X 2" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLON DE 2" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 4" X 4" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 8´
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4'X8'X1/4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLONCILLO DE 11/2" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 3" X 4" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TARIMA DE MADERA DE POLIN C/CABOTE 40''X48''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA DE ACEITE EN COLORES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SELLADOR ACRILICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
THINNER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPERMEABILIZANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN SPRAY
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SELLADOR MULTIFUNCIONAL 6000 MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADAPTADOR MACHO DE 1/2" PVC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO DE 2" (160 PSI) PVC AGUA POTABLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TEE DE 1 1/4" PVC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CODO PVC DE 1" X 45 A/P
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REDUCIDOR DE 2" X 1 1/2" PVC AP
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADAPTADOR MACHO DE 2" PVC AP
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMENTO PVC 1/4
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REDUCIDOR DE 2" X 1 1/2" PVC DRENAJE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TEE DE 1/2" PVC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO DE 4" (80 PSI) PVC DRENAJE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FLOTE PARA TANQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA EMPOTRADA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO PVC DE 1" X 250 PSI A/P
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CODO PVC DE 1" X 90 A/P
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REDUCIDOR PVC DE 3/4" A 1" A/P
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADAPTADOR HEMBRA DE 1/2" PVC CON ROSCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CODO DE 1 1/2" X 90 PVC DRENAJE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CODO DE 1/2" X 45 PVC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CODO DE 2" X 90 PVC AGUA POTABLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CODO DE 2" X 90 PVC DRENAJE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TEE DE 1" PVC AP.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TEE DE 2" PVC DRENAJE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADAPTADOR HEMBRA DE 3/4" PVC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REDUCIDOR PVC DE 1/2" A 1" A/P
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MANTENIMIENTO Y LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO SERVICIO DE FUMIGACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LABORATORIOS
- - - - - - 0.14% 0.14% 143.52% 95.00% -48.52% - - - 0.66 33.81% - - -51.07% - 0.00%
('MATERIALES',)
- - - - - - 0.14% 0.14% 143.52% 95.00% -48.52% - - - 0.66 33.81% - - -51.07% - 0.00%
('CONCRETO',)
- - - - - - 0.14% 0.14% 143.52% 95.00% -48.52% - - - 0.66 33.81% - - -51.07% - 0.00%
SERVICIO DE LABORATORIO
- - - - - - 0.14% 0.14% 143.52% 95.00% -48.52% - - - 0.66 33.81% - - -51.07% - 0.00%
TOPOGRAFIA
- - - - - - 0.71% 0.69% 105.24% 78.00% -27.24% - - - 0.74 25.88% - - -34.92% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.71% 0.69% 105.03% 78.00% -27.03% - - - 0.74 25.73% - - -34.65% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 78.00% 78.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 78.00% 78.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 78.00% 78.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB CONTRATO MOVIMIENTO DE TIERRA',)
- - - - - - 0.71% 0.69% 0.00% 78.00% 78.00% - - - 168570.87 -16856987.00% - - 100.00% - 0.00%
SUBCONTRATO SERVICIOS DE TOPOGRAFIA
- - - - - - 0.71% 0.69% 0.00% 78.00% 78.00% - - - 168570.87 -16856987.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 78.00% 78.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 78.00% 78.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 78.00% 78.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 78.00% 78.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 78.00% 78.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IDP REGULAR
- - - - - - 0.00% 0.00% 0.00% 78.00% 78.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 78.00% 78.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN SPRAY
- - - - - - 0.00% 0.00% 0.00% 78.00% 78.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PRESTACIONES PERSONAL DE OBRA
- - - - - - 1.43% 1.38% 122.00% 92.00% -30.00% - - - 0.75 24.59% - - -32.61% - 0.00%
('MANO DE OBRA',)
- - - - - - 1.43% 1.38% 121.98% 92.00% -29.98% - - - 0.75 24.58% - - -32.59% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 1.43% 1.38% 121.98% 92.00% -29.98% - - - 0.75 24.58% - - -32.59% - 0.00%
IGSS PATRONAL
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BONIF. DECRETO
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IRTRA
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INTECAP
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BONO 14
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AGUINALDO
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INDEMNIZACION
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA AYUDANTE
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA SEGURIDAD INDUSTRIAL
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PROVISION PRESTACIONES
- - - - - - 1.43% 1.38% 112.73% 92.00% -20.73% - - - 0.82 18.39% - - -22.53% - 0.00%
MANO DE OBRA BODEGUERO
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUELDOS ADMON
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VACACIONES
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MANO DE OBRA ALBAÑIL / MAESTRO DE OBRA
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 9"
- - - - - - 0.00% 0.00% 0.00% 92.00% 92.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FIANZAS, SEGUROS Y CONTRATOS
- - - - - - 1.21% 1.17% 51.33% 51.00% -0.33% - - - 0.99 0.64% - - -0.64% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 1.21% 1.17% 51.33% 51.00% -0.33% - - - 0.99 0.64% - - -0.64% - 0.00%
('SERVICIOS BASICOS',)
- - - - - - 1.21% 1.17% 51.33% 51.00% -0.33% - - - 0.99 0.64% - - -0.64% - 0.00%
FIANZAS DE ANTICIPO
- - - - - - 0.26% 0.25% 37.48% 51.00% 13.52% - - - 1.36 -36.06% - - 26.50% - 0.00%
FIANZA DE CONSERVACION DE OBRA
- - - - - - 0.36% 0.34% 0.00% 51.00% 51.00% - - - 54855.83 -5485482.95% - - 100.00% - 0.00%
FIANZA DE CUMPLIMIENTO DE CONTRATO
- - - - - - 0.38% 0.37% 47.77% 51.00% 3.23% - - - 1.07 -6.77% - - 6.34% - 0.00%
SEGURO DE RESPONSABILIDAD CIVIL
- - - - - - 0.21% 0.20% 0.00% 51.00% 51.00% - - - 32046.81 -3204580.88% - - 100.00% - 0.00%
FIANZAS, SEGUROS Y CONTRATOS
- - - - - - 0.00% 0.00% 0.00% 51.00% 51.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 19
- - - - - - 1.30% 1.25% 74.84% 42.53% -32.31% - - - 0.57 43.17% - - -75.97% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 84.95% 63.07% -21.88% - - - 0.74 25.75% - - -34.69% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 116.53% 100.00% -16.53% - - - 0.86 14.19% - - -16.53% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 156.21% 100.00% -56.21% - - - 0.64 35.98% - - -56.21% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 323.95% 100.00% -223.95% - - - 0.31 69.13% - - -223.95% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 62.28% 100.00% 37.72% - - - 1.61 -60.57% - - 37.72% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 11.33% 100.00% 88.67% - - - 8.82 -782.40% - - 88.67% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 68.03% 100.00% 31.97% - - - 1.47 -47.00% - - 31.97% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 12.45% 100.00% 87.55% - - - 8.03 -703.50% - - 87.55% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1887.30 -188630.00% - - 99.95% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 82.58% 100.00% 17.42% - - - 1.21 -21.10% - - 17.42% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 82.58% 100.00% 17.42% - - - 1.21 -21.10% - - 17.42% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 113.39% 100.00% -13.39% - - - 0.88 11.81% - - -13.39% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 164.78% 100.00% -64.78% - - - 0.61 39.31% - - -64.78% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 10891.79% 100.00% -10791.79% - - - 0.01 99.08% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 603.17% 100.00% -503.17% - - - 0.17 83.42% - - -503.17% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 171.15% 100.00% -71.15% - - - 0.58 41.57% - - -71.15% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 166.31% 100.00% -66.31% - - - 0.60 39.87% - - -66.31% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 186.19% 100.00% -86.19% - - - 0.54 46.29% - - -86.19% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 83.76% 100.00% 16.24% - - - 1.19 -19.39% - - 16.24% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 276.65% 100.00% -176.65% - - - 0.36 63.85% - - -176.65% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 174.74% 100.00% -74.74% - - - 0.57 42.77% - - -74.74% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 174.93% 100.00% -74.93% - - - 0.57 42.83% - - -74.93% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 57.34% 100.00% 42.66% - - - 1.74 -74.40% - - 42.66% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 57.34% 100.00% 42.66% - - - 1.74 -74.40% - - 42.66% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 75.65% 67.00% -8.65% - - - 0.89 11.43% - - -12.91% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 109.42% 67.00% -42.42% - - - 0.61 38.77% - - -63.32% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 295360.00% 67.00% -295293.00% - - - 0.00 99.98% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.37 63.15% - - -171.37% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 14780.46% 67.00% -14713.46% - - - 0.00 99.55% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 7.59 -659.11% - - 86.83% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 62720.00% 67.00% -62653.00% - - - 0.00 99.89% - - 0.00% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 3082.34% 67.00% -3015.34% - - - 0.02 97.83% - - -4500.50% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 18.51 -1751.21% - - 94.60% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 344.62% 67.00% -277.62% - - - 0.19 80.56% - - -414.36% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 240.93 -23992.53% - - 99.58% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.04 95.98% - - -2387.56% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 110.02% 67.00% -43.02% - - - 0.61 39.10% - - -64.21% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 67.00% 67.00% - - - 7644.61 -764360.62% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 67.00% 67.00% - - - 5710.62 -570961.77% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 82.08% 67.00% -15.08% - - - 0.82 18.38% - - -22.51% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 44.80% 67.00% 22.20% - - - 1.50 -49.54% - - 33.13% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 32.64 -3164.24% - - 96.94% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 18.45% 67.00% 48.55% - - - 3.63 -263.15% - - 72.46% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 446.51 -44550.81% - - 99.78% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 204.29% 67.00% -137.29% - - - 0.33 67.20% - - -204.91% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 67.00% -142.89% - - - 0.32 68.08% - - -213.27% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 233.97% 67.00% -166.97% - - - 0.29 71.36% - - -249.21% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 107.33% 67.00% -40.33% - - - 0.62 37.58% - - -60.19% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1297.90% 67.00% -1230.90% - - - 0.05 94.84% - - -1837.16% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 452.79 -45179.27% - - 99.78% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 121.24 -12024.32% - - 99.18% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 67.94 -6694.47% - - 98.53% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 263.60 -26260.48% - - 99.62% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO DE 2" (80 PSI) PVC DRENAJE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 67.00% 67.00% - - - 1289.80 -128880.36% - - 99.92% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 760.07 -75906.81% - - 99.87% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 529.74 -52873.55% - - 99.81% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 67.00% 28.13% - - - 1.72 -72.39% - - 41.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 67.00% 28.13% - - - 1.72 -72.39% - - 41.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 67.00% 67.00% - - - 2135.65 -213465.18% - - 99.95% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 67.00% 67.00% - - - 17336.39 -1733539.07% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 51.58% 0.00% -51.58% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 4.23% 0.00% -4.23% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 10.15% 0.00% -10.15% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 64.22% 0.00% -64.22% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 433.72% 0.00% -433.72% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 12.52% 0.00% -12.52% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 518.09% 0.00% -518.09% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 80.56% 0.00% -80.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 80.56% 0.00% -80.56% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 52.95% 69.88% 16.93% - - - 1.32 -31.98% - - 24.23% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 99.79% 68.00% -31.79% - - - 0.68 31.86% - - -46.76% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 102.79% 68.00% -34.79% - - - 0.66 33.84% - - -51.16% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 68.00% -32.00% - - - 0.68 32.00% - - -47.06% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 68.00% -32.00% - - - 0.68 32.00% - - -47.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.18% 72.00% 71.82% - - - 402.75 -40174.82% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.14% 72.00% 65.86% - - - 11.73 -1073.05% - - 91.48% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 688.00 -68699.60% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 688.00 -68699.60% - - 99.85% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 72.10% 0.00% -72.10% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 188.26% 0.00% -188.26% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 188.26% 0.00% -188.26% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 2.14% 0.00% -2.14% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 6.17% 0.00% -6.17% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 2.07% 0.00% -2.07% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 18
- - - - - - 1.30% 1.25% 74.20% 42.53% -31.67% - - - 0.57 42.68% - - -74.47% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 83.57% 63.07% -20.50% - - - 0.75 24.53% - - -32.51% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 122.86% 100.00% -22.86% - - - 0.81 18.61% - - -22.86% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 173.99% 100.00% -73.99% - - - 0.57 42.53% - - -73.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 74322.47% 100.00% -74222.47% - - - 0.00 99.87% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 121739.13% 100.00% -121639.13% - - - 0.00 99.92% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 1005.17% 100.00% -905.17% - - - 0.10 90.05% - - -905.17% - 0.00%
CAL
- - - - - - 0.00% 0.00% 30.09% 100.00% 69.91% - - - 3.32 -232.39% - - 69.91% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 61049.00% 100.00% -60949.00% - - - 0.00 99.84% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 321.37% 100.00% -221.37% - - - 0.31 68.88% - - -221.37% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 81.61% 100.00% 18.39% - - - 1.23 -22.53% - - 18.39% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 6.22% 100.00% 93.78% - - - 16.09 -1508.50% - - 93.78% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 68.03% 100.00% 31.97% - - - 1.47 -47.00% - - 31.97% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2594.18 -259318.00% - - 99.96% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1887.30 -188630.00% - - 99.95% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 76.18% 100.00% 23.82% - - - 1.31 -31.26% - - 23.82% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 76.18% 100.00% 23.82% - - - 1.31 -31.26% - - 23.82% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 78.52% 67.00% -11.52% - - - 0.85 14.68% - - -17.20% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 114.82% 67.00% -47.82% - - - 0.58 41.65% - - -71.38% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 213274.55% 67.00% -213207.55% - - - 0.00 99.97% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.37 63.15% - - -171.37% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 7597.21% 67.00% -7530.21% - - - 0.01 99.12% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 7.59 -659.11% - - 86.83% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.57 43.05% - - -75.59% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1883.32% 67.00% -1816.32% - - - 0.04 96.44% - - -2710.92% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 18.51 -1751.21% - - 94.60% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 132.14% 67.00% -65.14% - - - 0.51 49.30% - - -97.23% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 240.93 -23992.53% - - 99.58% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.04 95.98% - - -2387.56% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 123.68% 67.00% -56.68% - - - 0.54 45.83% - - -84.60% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 44.80% 67.00% 22.20% - - - 1.50 -49.54% - - 33.13% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 32.64 -3164.24% - - 96.94% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 54.77% 67.00% 12.23% - - - 1.22 -22.33% - - 18.25% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 446.51 -44550.81% - - 99.78% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 487.36% 67.00% -420.36% - - - 0.14 86.25% - - -627.40% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 67.00% -142.89% - - - 0.32 68.08% - - -213.27% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 233.97% 67.00% -166.97% - - - 0.29 71.36% - - -249.21% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 170.97% 67.00% -103.97% - - - 0.39 60.81% - - -155.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1916.61% 67.00% -1849.61% - - - 0.03 96.50% - - -2760.62% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.97% 67.00% -41.97% - - - 0.61 38.51% - - -62.64% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 67.00% 67.00% - - - 7644.61 -764360.62% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 67.00% 67.00% - - - 5710.62 -570961.77% - - 99.98% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 452.79 -45179.27% - - 99.78% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 121.24 -12024.32% - - 99.18% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 67.94 -6694.47% - - 98.53% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 263.60 -26260.48% - - 99.62% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 67.00% 67.00% - - - 1289.80 -128880.36% - - 99.92% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 760.07 -75906.81% - - 99.87% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 529.74 -52873.55% - - 99.81% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 67.00% 28.13% - - - 1.72 -72.39% - - 41.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 67.00% 28.13% - - - 1.72 -72.39% - - 41.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 67.00% 67.00% - - - 2135.65 -213465.18% - - 99.95% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 67.00% 67.00% - - - 17336.39 -1733539.07% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 111.06% 100.00% -11.06% - - - 0.90 9.96% - - -11.06% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 159.36% 100.00% -59.36% - - - 0.63 37.25% - - -59.36% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 15806.01% 100.00% -15706.01% - - - 0.01 99.37% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 245.83% 100.00% -145.83% - - - 0.41 59.32% - - -145.83% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 165.92% 100.00% -65.92% - - - 0.60 39.73% - - -65.92% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 186.19% 100.00% -86.19% - - - 0.54 46.29% - - -86.19% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 80.54% 100.00% 19.46% - - - 1.24 -24.17% - - 19.46% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 276.65% 100.00% -176.65% - - - 0.36 63.85% - - -176.65% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 174.74% 100.00% -74.74% - - - 0.57 42.77% - - -74.74% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 145.77% 100.00% -45.77% - - - 0.69 31.40% - - -45.77% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 165.44% 100.00% -65.44% - - - 0.60 39.55% - - -65.44% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 58.58% 100.00% 41.42% - - - 1.71 -70.70% - - 41.42% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 58.58% 100.00% 41.42% - - - 1.71 -70.70% - - 41.42% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 41.97% 0.00% -41.97% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 8.97% 0.00% -8.97% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 8.77% 0.00% -8.77% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.35% 0.00% -71.35% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2272.46% 0.00% -2272.46% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 2272.46% 0.00% -2272.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 15.02% 0.00% -15.02% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 621.70% 0.00% -621.70% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 92.82% 0.00% -92.82% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 92.82% 0.00% -92.82% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 62.20% 0.00% -62.20% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 62.20% 0.00% -62.20% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 53.05% 69.88% 16.83% - - - 1.32 -31.73% - - 24.09% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 99.79% 68.00% -31.79% - - - 0.68 31.86% - - -46.76% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 102.79% 68.00% -34.79% - - - 0.66 33.84% - - -51.16% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 68.00% -32.00% - - - 0.68 32.00% - - -47.06% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 68.00% -32.00% - - - 0.68 32.00% - - -47.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.39% 72.00% 71.61% - - - 183.61 -18260.81% - - 99.46% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 13.46% 72.00% 58.54% - - - 5.35 -434.78% - - 81.30% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 688.00 -68699.60% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 688.00 -68699.60% - - 99.85% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO DE 2" (80 PSI) PVC DRENAJE
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 72.10% 0.00% -72.10% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 188.26% 0.00% -188.26% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 188.26% 0.00% -188.26% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 2.14% 0.00% -2.14% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 6.17% 0.00% -6.17% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 2.07% 0.00% -2.07% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 3
- - - - - - 1.30% 1.25% 89.44% 56.95% -32.49% - - - 0.64 36.32% - - -57.05% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 98.43% 87.23% -11.20% - - - 0.89 11.38% - - -12.84% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 134.53% 50.00% -84.53% - - - 0.37 62.83% - - -169.07% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 181.54% 50.00% -131.54% - - - 0.28 72.46% - - -263.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 181.54% 50.00% -131.54% - - - 0.28 72.46% - - -263.08% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 50.00% 50.00% - - - 1827.38 -182638.50% - - 99.95% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 753.09 -75209.00% - - 99.87% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 50.00% 50.00% - - - 12310.10 -1230910.00% - - 99.99% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 58.17% 50.00% -8.17% - - - 0.86 14.04% - - -16.34% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2272.46% 50.00% -2222.46% - - - 0.02 97.80% - - -4444.93% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 2272.46% 50.00% -2222.46% - - - 0.02 97.80% - - -4444.93% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 329.43% 50.00% -279.43% - - - 0.15 84.82% - - -558.86% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 431.43 -43043.00% - - 99.77% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 3.29 -229.00% - - 69.60% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 238.80% 50.00% -188.80% - - - 0.21 79.06% - - -377.61% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 41.80 -4079.50% - - 97.61% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 212.35% 50.00% -162.35% - - - 0.24 76.45% - - -324.71% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 1554.26% 50.00% -1504.26% - - - 0.03 96.78% - - -3008.51% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 4.92 -391.50% - - 79.65% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 4.92 -391.50% - - 79.65% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 12.96 -1196.50% - - 92.29% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 9.59 -859.00% - - 89.57% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 3.38 -237.50% - - 70.37% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 249.20 -24820.50% - - 99.60% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 249.20 -24820.50% - - 99.60% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 340.40 -33939.50% - - 99.71% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 340.40 -33939.50% - - 99.71% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 50.00% 50.00% - - - 832.99 -83199.00% - - 99.88% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 50.00% 50.00% - - - 832.99 -83199.00% - - 99.88% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 0.00% 50.00% 50.00% - - - 1012.75 -101175.00% - - 99.90% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 124.46 -12345.50% - - 99.20% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 5.62 -462.00% - - 82.21% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 8.69 -769.00% - - 88.49% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 1.74 -73.50% - - 42.36% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 7.20 -620.50% - - 86.12% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 50.00% 50.00% - - - 865.04 -86404.50% - - 99.88% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 50.00% 50.00% - - - 4640.83 -463983.00% - - 99.98% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 40.34 -3933.50% - - 97.52% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 50.00% 50.00% - - - 4600.50 -459949.50% - - 99.98% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 77.99 -7699.00% - - 98.72% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 77.99 -7699.00% - - 98.72% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 77.99 -7699.00% - - 98.72% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 110.70% 100.00% -10.70% - - - 0.90 9.67% - - -10.70% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 123.60% 100.00% -23.60% - - - 0.81 19.09% - - -23.60% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 316.08% 100.00% -216.08% - - - 0.32 68.36% - - -216.08% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 177.36% 100.00% -77.36% - - - 0.56 43.62% - - -77.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 50.35% 100.00% 49.65% - - - 1.99 -98.61% - - 49.65% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 87.33% 100.00% 12.67% - - - 1.15 -14.51% - - 12.67% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 16.11% 100.00% 83.89% - - - 6.21 -520.85% - - 83.89% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1825.21 -182421.00% - - 99.95% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.94 -10094.00% - - 99.02% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 100.22% 100.00% -0.22% - - - 1.00 0.22% - - -0.22% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 100.22% 100.00% -0.22% - - - 1.00 0.22% - - -0.22% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 99.67% 100.00% 0.33% - - - 1.00 -0.33% - - 0.33% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 132.86% 100.00% -32.86% - - - 0.75 24.73% - - -32.86% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 272.11% 100.00% -172.11% - - - 0.37 63.25% - - -172.11% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 123.73% 100.00% -23.73% - - - 0.81 19.18% - - -23.73% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 26.95% 100.00% 73.05% - - - 3.71 -271.00% - - 73.05% - 0.00%
CAL
- - - - - - 0.00% 0.00% 27.39% 100.00% 72.61% - - - 3.65 -265.07% - - 72.61% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 4807.82 -480682.00% - - 99.98% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 326.34 -32534.00% - - 99.69% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2594.18 -259318.00% - - 99.96% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1887.30 -188630.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 71.50% 100.00% 28.50% - - - 1.40 -39.86% - - 28.50% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 71.50% 100.00% 28.50% - - - 1.40 -39.86% - - 28.50% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 61.23% 100.00% 38.77% - - - 1.63 -63.31% - - 38.77% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 82.33% 100.00% 17.67% - - - 1.21 -21.46% - - 17.67% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 1231.53% 100.00% -1131.53% - - - 0.08 91.88% - - -1131.53% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 441.43% 100.00% -341.43% - - - 0.23 77.35% - - -341.43% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 110.02% 100.00% -10.02% - - - 0.91 9.11% - - -10.02% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 40.92% 100.00% 59.08% - - - 2.44 -144.36% - - 59.08% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6508.78 -650778.00% - - 99.98% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 13.18% 100.00% 86.82% - - - 7.59 -658.81% - - 86.82% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 825.52 -82452.00% - - 99.88% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.36 -14736.00% - - 99.33% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 163.42 -16242.00% - - 99.39% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 117.66% 100.00% -17.66% - - - 0.85 15.01% - - -17.66% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 124.59 -12359.00% - - 99.20% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 100.00% 61.13% - - - 2.57 -157.29% - - 61.13% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 100.00% 61.13% - - - 2.57 -157.29% - - 61.13% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 96.45% 86.12% -10.33% - - - 0.89 10.71% - - -11.99% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 106.96% 88.00% -18.96% - - - 0.82 17.72% - - -21.54% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 110.17% 88.00% -22.17% - - - 0.80 20.12% - - -25.19% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 84.61% 84.00% -0.61% - - - 0.99 0.72% - - -0.73% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 86.40% 84.00% -2.40% - - - 0.97 2.77% - - -2.85% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 85.81% 84.00% -1.81% - - - 0.98 2.11% - - -2.15% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 85.81% 84.00% -1.81% - - - 0.98 2.11% - - -2.15% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 25.10% 84.00% 58.90% - - - 3.35 -234.71% - - 70.12% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 73.38% 0.00% -73.38% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 98.23% 0.00% -98.23% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 97.36% 0.00% -97.36% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 97.36% 0.00% -97.36% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 97.36% 0.00% -97.36% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 101.72% 0.00% -101.72% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 101.72% 0.00% -101.72% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 101.72% 0.00% -101.72% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 100.03% 0.00% -100.03% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 153.17% 0.00% -153.17% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 153.17% 0.00% -153.17% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGATEC PLUS ADHESIVO PARA CERAMICA GRIS DE 20KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 0.00% -32.30% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO GR 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA PLOMO 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA GRIS 20X66
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 20.40% 0.00% -20.40% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 58.78% 0.00% -58.78% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 54.68% 0.00% -54.68% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 0.00% -96.70% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 81.77% 0.00% -81.77% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 4
- - - - - - 1.30% 1.25% 88.66% 56.95% -31.71% - - - 0.64 35.76% - - -55.68% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 99.21% 87.23% -11.98% - - - 0.88 12.08% - - -13.74% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 130.42% 50.00% -80.42% - - - 0.38 61.66% - - -160.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 182.67% 50.00% -132.67% - - - 0.27 72.63% - - -265.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 182.67% 50.00% -132.67% - - - 0.27 72.63% - - -265.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 50.00% 50.00% - - - 1827.38 -182638.50% - - 99.95% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 753.09 -75209.00% - - 99.87% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 50.00% 50.00% - - - 12310.10 -1230910.00% - - 99.99% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 45.38% 50.00% 4.62% - - - 1.10 -10.17% - - 9.23% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 3017.22% 50.00% -2967.22% - - - 0.02 98.34% - - -5934.44% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 11.73 -1073.00% - - 91.47% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 233.23% 50.00% -183.23% - - - 0.21 78.56% - - -366.46% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 41.80 -4079.50% - - 97.61% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 166.85% 50.00% -116.85% - - - 0.30 70.03% - - -233.71% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 3108.51% 50.00% -3058.51% - - - 0.02 98.39% - - -6117.03% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 40.15% 50.00% 9.85% - - - 1.25 -24.54% - - 19.70% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 431.43 -43043.00% - - 99.77% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 3.29 -229.00% - - 69.60% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 4.92 -391.50% - - 79.65% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 4.92 -391.50% - - 79.65% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 9.78% 50.00% 40.22% - - - 5.11 -411.15% - - 80.44% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 124.46 -12345.50% - - 99.20% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 5.62 -462.00% - - 82.21% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 8.69 -769.00% - - 88.49% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 1.74 -73.50% - - 42.36% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1374.95% 50.00% -1324.95% - - - 0.04 96.36% - - -2649.90% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 50.00% 50.00% - - - 865.04 -86404.50% - - 99.88% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 12.96 -1196.50% - - 92.29% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 9.59 -859.00% - - 89.57% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 3.38 -237.50% - - 70.37% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 249.20 -24820.50% - - 99.60% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 249.20 -24820.50% - - 99.60% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 340.40 -33939.50% - - 99.71% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 340.40 -33939.50% - - 99.71% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 50.00% 50.00% - - - 832.99 -83199.00% - - 99.88% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 50.00% 50.00% - - - 832.99 -83199.00% - - 99.88% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 50.00% 50.00% - - - 4640.83 -463983.00% - - 99.98% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 40.34 -3933.50% - - 97.52% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 50.00% 50.00% - - - 4600.50 -459949.50% - - 99.98% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 77.99 -7699.00% - - 98.72% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 77.99 -7699.00% - - 98.72% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 50.00% 50.00% - - - 77.99 -7699.00% - - 98.72% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 104.64% 100.00% -4.64% - - - 0.96 4.43% - - -4.64% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 128.67% 100.00% -28.67% - - - 0.78 22.28% - - -28.67% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 272.11% 100.00% -172.11% - - - 0.37 63.25% - - -172.11% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 61.87% 100.00% 38.13% - - - 1.62 -61.64% - - 38.13% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 1.85% 100.00% 98.15% - - - 54.14 -5314.21% - - 98.15% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 27.21% 100.00% 72.79% - - - 3.68 -267.50% - - 72.79% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2594.18 -259318.00% - - 99.96% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1887.30 -188630.00% - - 99.95% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 87.72% 100.00% 12.28% - - - 1.14 -14.00% - - 12.28% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 87.72% 100.00% 12.28% - - - 1.14 -14.00% - - 12.28% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 101.06% 100.00% -1.06% - - - 0.99 1.05% - - -1.06% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 111.75% 100.00% -11.75% - - - 0.89 10.52% - - -11.75% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 246.38% 100.00% -146.38% - - - 0.41 59.41% - - -146.38% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 187.32% 100.00% -87.32% - - - 0.53 46.61% - - -87.32% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9457.29 -945629.00% - - 99.99% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5325.36 -532436.00% - - 99.98% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 689.14 -68814.00% - - 99.85% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1825.21 -182421.00% - - 99.95% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.94 -10094.00% - - 99.02% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 92.79% 100.00% 7.21% - - - 1.08 -7.78% - - 7.21% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 92.79% 100.00% 7.21% - - - 1.08 -7.78% - - 7.21% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 72.75% 100.00% 27.25% - - - 1.37 -37.46% - - 27.25% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 103.97% 100.00% -3.97% - - - 0.96 3.82% - - -3.97% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 286254.55% 100.00% -286154.55% - - - 0.00 99.97% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 4377.01% 100.00% -4277.01% - - - 0.02 97.72% - - -4277.01% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 62720.00% 100.00% -62620.00% - - - 0.00 99.84% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 223.74% 100.00% -123.74% - - - 0.45 55.30% - - -123.74% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 136.70% 100.00% -36.70% - - - 0.73 26.84% - - -36.70% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 49.34% 100.00% 50.66% - - - 2.03 -102.68% - - 50.66% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6508.78 -650778.00% - - 99.98% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 2.64% 100.00% 97.36% - - - 37.94 -3694.05% - - 97.36% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 127.41% 100.00% -27.41% - - - 0.78 21.51% - - -27.41% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.36 -14736.00% - - 99.33% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 163.42 -16242.00% - - 99.39% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 117.66% 100.00% -17.66% - - - 0.85 15.01% - - -17.66% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 39.75% 100.00% 60.25% - - - 2.52 -151.54% - - 60.25% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 100.00% 61.13% - - - 2.57 -157.29% - - 61.13% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 100.00% 61.13% - - - 2.57 -157.29% - - 61.13% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 93.68% 86.12% -7.56% - - - 0.92 8.07% - - -8.78% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 102.71% 88.00% -14.71% - - - 0.86 14.32% - - -16.72% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 105.79% 88.00% -17.79% - - - 0.83 16.82% - - -20.22% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 83.50% 84.00% 0.50% - - - 1.01 -0.60% - - 0.59% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 85.81% 84.00% -1.81% - - - 0.98 2.11% - - -2.15% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 85.81% 84.00% -1.81% - - - 0.98 2.11% - - -2.15% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 85.81% 84.00% -1.81% - - - 0.98 2.11% - - -2.15% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 84.00% 77.42% - - - 12.77 -1177.11% - - 92.17% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 71.46% 0.00% -71.46% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 94.60% 0.00% -94.60% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 27.93% 0.00% -27.93% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 27.93% 0.00% -27.93% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 27.93% 0.00% -27.93% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 100.02% 0.00% -100.02% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 153.15% 0.00% -153.15% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 153.15% 0.00% -153.15% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGATEC PLUS ADHESIVO PARA CERAMICA GRIS DE 20KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 0.00% -32.30% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO GR 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA PLOMO 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA GRIS 20X66
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 20.40% 0.00% -20.40% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 58.78% 0.00% -58.78% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 54.68% 0.00% -54.68% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 0.00% -96.70% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 20
- - - - - - 1.30% 1.25% 65.38% 42.53% -22.85% - - - 0.65 34.95% - - -53.72% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 87.51% 63.07% -24.44% - - - 0.72 27.92% - - -38.74% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 129.65% 100.00% -29.65% - - - 0.77 22.87% - - -29.65% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 187.67% 100.00% -87.67% - - - 0.53 46.72% - - -87.67% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 111483.15% 100.00% -111383.15% - - - 0.00 99.91% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 182608.70% 100.00% -182508.70% - - - 0.00 99.95% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 437.04% 100.00% -337.04% - - - 0.23 77.12% - - -337.04% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 27349.40% 100.00% -27249.40% - - - 0.00 99.63% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 323.95% 100.00% -223.95% - - - 0.31 69.13% - - -223.95% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 61.53% 100.00% 38.47% - - - 1.63 -62.53% - - 38.47% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 68.03% 100.00% 31.97% - - - 1.47 -47.00% - - 31.97% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2594.18 -259318.00% - - 99.96% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1887.30 -188630.00% - - 99.95% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 842.97 -84197.00% - - 99.88% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 75.63% 100.00% 24.37% - - - 1.32 -32.22% - - 24.37% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 75.63% 100.00% 24.37% - - - 1.32 -32.22% - - 24.37% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 76.47% 67.00% -9.47% - - - 0.88 12.39% - - -14.14% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 110.97% 67.00% -43.97% - - - 0.60 39.62% - - -65.63% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 329640.00% 67.00% -329573.00% - - - 0.00 99.98% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.37 63.15% - - -171.37% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 9228.24% 67.00% -9161.24% - - - 0.01 99.27% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 7.59 -659.11% - - 86.83% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.57 43.05% - - -75.59% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1194.53% 67.00% -1127.53% - - - 0.06 94.39% - - -1682.89% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 18.51 -1751.21% - - 94.60% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 469.97% 67.00% -402.97% - - - 0.14 85.74% - - -601.45% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 240.93 -23992.53% - - 99.58% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.04 95.98% - - -2387.56% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 106.59% 67.00% -39.59% - - - 0.63 37.14% - - -59.08% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 67.00% 67.00% - - - 7644.61 -764360.62% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 67.00% 67.00% - - - 5710.62 -570961.77% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 98.03% 67.00% -31.03% - - - 0.68 31.65% - - -46.31% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 53.64% 67.00% 13.36% - - - 1.25 -24.92% - - 19.95% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 32.64 -3164.24% - - 96.94% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 564.33 -56332.76% - - 99.82% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 446.51 -44550.81% - - 99.78% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 330.14% 67.00% -263.14% - - - 0.20 79.71% - - -392.75% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 67.00% -142.89% - - - 0.32 68.08% - - -213.27% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 233.97% 67.00% -166.97% - - - 0.29 71.36% - - -249.21% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 142.97% 67.00% -75.97% - - - 0.47 53.14% - - -113.39% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 988.23% 67.00% -921.23% - - - 0.07 93.22% - - -1374.98% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 452.79 -45179.27% - - 99.78% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 121.24 -12024.32% - - 99.18% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 67.94 -6694.47% - - 98.53% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 263.60 -26260.48% - - 99.62% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 67.00% 67.00% - - - 1289.80 -128880.36% - - 99.92% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 760.07 -75906.81% - - 99.87% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 529.74 -52873.55% - - 99.81% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 67.00% 28.13% - - - 1.72 -72.39% - - 41.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 67.00% 28.13% - - - 1.72 -72.39% - - 41.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 67.00% 67.00% - - - 2135.65 -213465.18% - - 99.95% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 67.00% 67.00% - - - 17336.39 -1733539.07% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 109.50% 100.00% -9.50% - - - 0.91 8.68% - - -9.50% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 158.00% 100.00% -58.00% - - - 0.63 36.71% - - -58.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 17871.97% 100.00% -17771.97% - - - 0.01 99.44% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 187.76% 100.00% -87.76% - - - 0.53 46.74% - - -87.76% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 171.15% 100.00% -71.15% - - - 0.58 41.57% - - -71.15% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 151.63% 100.00% -51.63% - - - 0.66 34.05% - - -51.63% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 164.28% 100.00% -64.28% - - - 0.61 39.13% - - -64.28% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 51.54% 100.00% 48.46% - - - 1.94 -94.01% - - 48.46% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 276.65% 100.00% -176.65% - - - 0.36 63.85% - - -176.65% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 174.74% 100.00% -74.74% - - - 0.57 42.77% - - -74.74% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 174.93% 100.00% -74.93% - - - 0.57 42.83% - - -74.93% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 56.72% 100.00% 43.28% - - - 1.76 -76.31% - - 43.28% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 56.72% 100.00% 43.28% - - - 1.76 -76.31% - - 43.28% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 58.75% 0.00% -58.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 23.30% 0.00% -23.30% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 14.24% 0.00% -14.24% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.35% 0.00% -71.35% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 1012.10% 0.00% -1012.10% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 109.37% 0.00% -109.37% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 44.49% 0.00% -44.49% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 1036.17% 0.00% -1036.17% - - - 0.00 100.00% - - 0.00% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 5.46% 0.00% -5.46% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 123.75% 0.00% -123.75% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 123.75% 0.00% -123.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 80.56% 0.00% -80.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 80.56% 0.00% -80.56% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 53.05% 69.88% 16.83% - - - 1.32 -31.72% - - 24.08% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.00% 68.00% -32.00% - - - 0.68 32.00% - - -47.06% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 102.79% 68.00% -34.79% - - - 0.66 33.84% - - -51.16% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 68.00% -32.00% - - - 0.68 32.00% - - -47.06% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 68.00% -32.00% - - - 0.68 32.00% - - -47.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 7.01% 68.00% 60.99% - - - 9.70 -870.27% - - 89.69% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TAPADERA GALVANIZADA CUADRADA 4" CIEGA
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.17% 72.00% 71.83% - - - 433.81 -43281.42% - - 99.77% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 5.70% 72.00% 66.30% - - - 12.64 -1163.54% - - 92.09% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 688.00 -68699.60% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 688.00 -68699.60% - - 99.85% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 41.07% 0.00% -41.07% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 56.89% 0.00% -56.89% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 56.89% 0.00% -56.89% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 56.89% 0.00% -56.89% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 56.89% 0.00% -56.89% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 2.14% 0.00% -2.14% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 6.17% 0.00% -6.17% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 2.07% 0.00% -2.07% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 1
- - - - - - 1.30% 1.25% 96.78% 63.05% -33.73% - - - 0.65 34.86% - - -53.50% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 115.73% 100.00% -15.73% - - - 0.86 13.59% - - -15.73% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 146.52% 100.00% -46.52% - - - 0.68 31.75% - - -46.52% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 196.86% 100.00% -96.86% - - - 0.51 49.20% - - -96.86% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 196.86% 100.00% -96.86% - - - 0.51 49.20% - - -96.86% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 64.75% 100.00% 35.25% - - - 1.54 -54.43% - - 35.25% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 485.93% 100.00% -385.93% - - - 0.21 79.42% - - -385.93% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SILICONE SISTA 280ML BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 350.51% 100.00% -250.51% - - - 0.29 71.47% - - -250.51% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 279.20% 100.00% -179.20% - - - 0.36 64.18% - - -179.20% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 3555.90% 100.00% -3455.90% - - - 0.03 97.19% - - -3455.90% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 124.74% 100.00% -24.74% - - - 0.80 19.84% - - -24.74% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 2.63% 100.00% 97.37% - - - 38.01 -3700.86% - - 97.37% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 21.41% 100.00% 78.59% - - - 4.67 -367.09% - - 78.59% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 14.41 -1341.00% - - 93.06% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - -0.00% -0.00% 0.00% 100.00% 100.00% - - - -0.02 102.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 498.41 -49741.00% - - 99.80% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 498.41 -49741.00% - - 99.80% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 135.21% 100.00% -35.21% - - - 0.74 26.04% - - -35.21% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 161.04% 100.00% -61.04% - - - 0.62 37.90% - - -61.04% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 310.99% 100.00% -210.99% - - - 0.32 67.84% - - -210.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 287.82% 100.00% -187.82% - - - 0.35 65.26% - - -187.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 95.11% 100.00% 4.89% - - - 1.05 -5.14% - - 4.89% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 12154.62% 100.00% -12054.62% - - - 0.01 99.18% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 88.69% 100.00% 11.31% - - - 1.13 -12.75% - - 11.31% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 13.21% 100.00% 86.79% - - - 7.57 -657.28% - - 86.79% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 47.63% 100.00% 52.37% - - - 2.10 -109.96% - - 52.37% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2594.18 -259318.00% - - 99.96% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1887.30 -188630.00% - - 99.95% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 115.84% 100.00% -15.84% - - - 0.86 13.67% - - -15.84% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RECARGO POR SUSPENSIÓN DE OBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 107.06% 100.00% -7.06% - - - 0.93 6.59% - - -7.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 107.06% 100.00% -7.06% - - - 0.93 6.59% - - -7.06% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 132.76% 100.00% -32.76% - - - 0.75 24.67% - - -32.76% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 186.78% 100.00% -86.78% - - - 0.54 46.46% - - -86.78% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 12020.82% 100.00% -11920.82% - - - 0.01 99.17% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 316.53% 100.00% -216.53% - - - 0.32 68.41% - - -216.53% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 265.53% 100.00% -165.53% - - - 0.38 62.34% - - -165.53% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 70.91% 100.00% 29.09% - - - 1.41 -41.02% - - 29.09% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 87.33% 100.00% 12.67% - - - 1.15 -14.51% - - 12.67% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 16.11% 100.00% 83.89% - - - 6.21 -520.85% - - 83.89% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1825.21 -182421.00% - - 99.95% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.94 -10094.00% - - 99.02% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AROMATIZANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 74.09% 100.00% 25.91% - - - 1.35 -34.97% - - 25.91% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 74.09% 100.00% 25.91% - - - 1.35 -34.97% - - 25.91% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CUCHILLA PRECORTADA 18MM CON ESTUCHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 72.38% 100.00% 27.62% - - - 1.38 -38.17% - - 27.62% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 97.47% 100.00% 2.53% - - - 1.03 -2.59% - - 2.53% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 451330.91% 100.00% -451230.91% - - - 0.00 99.98% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2712.97% 100.00% -2612.97% - - - 0.04 96.31% - - -2612.97% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 668.38% 100.00% -568.38% - - - 0.15 85.04% - - -568.38% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 343.29% 100.00% -243.29% - - - 0.29 70.87% - - -243.29% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4'X8'X1/4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 36.67% 100.00% 63.33% - - - 2.73 -172.72% - - 63.33% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6508.78 -650778.00% - - 99.98% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 12.12% 100.00% 87.88% - - - 8.25 -724.79% - - 87.88% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 825.52 -82452.00% - - 99.88% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 419.78% 100.00% -319.78% - - - 0.24 76.18% - - -319.78% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 89.56% 100.00% 10.44% - - - 1.12 -11.66% - - 10.44% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 129.32% 100.00% -29.32% - - - 0.77 22.67% - - -29.32% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 166.98% 100.00% -66.98% - - - 0.60 40.11% - - -66.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 45.75% 100.00% 54.25% - - - 2.19 -118.59% - - 54.25% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 45.75% 100.00% 54.25% - - - 2.19 -118.59% - - 54.25% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 93.81% 86.12% -7.69% - - - 0.92 8.20% - - -8.93% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 101.44% 88.00% -13.44% - - - 0.87 13.25% - - -15.27% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 104.47% 88.00% -16.47% - - - 0.84 15.76% - - -18.71% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.55% 88.00% 87.45% - - - 159.47 -15847.11% - - 99.37% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 85.21% 84.00% -1.21% - - - 0.99 1.42% - - -1.44% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 87.57% 84.00% -3.57% - - - 0.96 4.08% - - -4.25% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 85.81% 84.00% -1.81% - - - 0.98 2.11% - - -2.15% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 85.81% 84.00% -1.81% - - - 0.98 2.11% - - -2.15% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 84.00% 77.42% - - - 12.77 -1177.11% - - 92.17% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 72.08% 0.00% -72.08% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 94.95% 0.00% -94.95% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 402.45% 0.00% -402.45% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 402.45% 0.00% -402.45% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 402.45% 0.00% -402.45% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 54.17% 0.00% -54.17% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 82.95% 0.00% -82.95% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 82.95% 0.00% -82.95% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 59.31% 0.00% -59.31% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 0.00% -32.30% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 42.30% 0.00% -42.30% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 121.89% 0.00% -121.89% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 117.78% 0.00% -117.78% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 99.89% 0.00% -99.89% - - - 0.00 100.00% - - 0.00% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 80.72% 0.00% -80.72% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 148.15% 0.00% -148.15% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 0.00% -96.70% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 42.88% 0.00% -42.88% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 81.77% 0.00% -81.77% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.69% 0.00% -46.69% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 2
- - - - - - 1.30% 1.25% 94.88% 63.05% -31.83% - - - 0.66 33.55% - - -50.49% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 95.38% 86.12% -9.26% - - - 0.90 9.71% - - -10.75% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 104.00% 88.00% -16.00% - - - 0.85 15.39% - - -18.19% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 107.12% 88.00% -19.12% - - - 0.82 17.85% - - -21.73% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 85.66% 84.00% -1.66% - - - 0.98 1.94% - - -1.98% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 88.03% 84.00% -4.03% - - - 0.95 4.58% - - -4.80% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 85.81% 84.00% -1.81% - - - 0.98 2.11% - - -2.15% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 85.81% 84.00% -1.81% - - - 0.98 2.11% - - -2.15% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 84.00% 77.42% - - - 12.77 -1177.11% - - 92.17% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 99.31% 100.00% 0.69% - - - 1.01 -0.69% - - 0.69% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 127.15% 100.00% -27.15% - - - 0.79 21.35% - - -27.15% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 175.78% 100.00% -75.78% - - - 0.57 43.11% - - -75.78% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 175.78% 100.00% -75.78% - - - 0.57 43.11% - - -75.78% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 48.03% 100.00% 51.97% - - - 2.08 -108.21% - - 51.97% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 220.55% 100.00% -120.55% - - - 0.45 54.66% - - -120.55% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 68.97% 100.00% 31.03% - - - 1.45 -45.00% - - 31.03% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 6424.26% 100.00% -6324.26% - - - 0.02 98.44% - - -6324.26% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 104.15% 100.00% -4.15% - - - 0.96 3.99% - - -4.15% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 53.51% 100.00% 46.49% - - - 1.87 -86.87% - - 46.49% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1963.35% 100.00% -1863.35% - - - 0.05 94.91% - - -1863.35% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 581.27% 100.00% -481.27% - - - 0.17 82.80% - - -481.27% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 686.26% 100.00% -586.26% - - - 0.15 85.43% - - -586.26% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 498.41 -49741.00% - - 99.80% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 498.41 -49741.00% - - 99.80% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 869.44 -86844.00% - - 99.88% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 122.79% 100.00% -22.79% - - - 0.81 18.56% - - -22.79% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 152.63% 100.00% -52.63% - - - 0.66 34.48% - - -52.63% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 336.90% 100.00% -236.90% - - - 0.30 70.32% - - -236.90% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 842.97 -84197.00% - - 99.88% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 4807.82 -480682.00% - - 99.98% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 326.34 -32534.00% - - 99.69% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2594.18 -259318.00% - - 99.96% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1887.30 -188630.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 101.03% 100.00% -1.03% - - - 0.99 1.02% - - -1.03% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 101.03% 100.00% -1.03% - - - 0.99 1.02% - - -1.03% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 107.23% 100.00% -7.23% - - - 0.93 6.74% - - -7.23% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 124.07% 100.00% -24.07% - - - 0.81 19.40% - - -24.07% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 7085.49% 100.00% -6985.49% - - - 0.01 98.59% - - -6985.49% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 379.09% 100.00% -279.09% - - - 0.26 73.62% - - -279.09% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 171.15% 100.00% -71.15% - - - 0.58 41.57% - - -71.15% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 53.03% 100.00% 46.97% - - - 1.89 -88.58% - - 46.97% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 87.33% 100.00% 12.67% - - - 1.15 -14.51% - - 12.67% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 16.11% 100.00% 83.89% - - - 6.21 -520.85% - - 83.89% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 11.42% 100.00% 88.58% - - - 8.75 -775.40% - - 88.58% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.94 -10094.00% - - 99.02% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 91.92% 100.00% 8.08% - - - 1.09 -8.79% - - 8.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 91.92% 100.00% 8.08% - - - 1.09 -8.79% - - 8.08% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 64.25% 100.00% 35.75% - - - 1.56 -55.64% - - 35.75% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 82.21% 100.00% 17.79% - - - 1.22 -21.65% - - 17.79% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 271180.00% 100.00% -271080.00% - - - 0.00 99.96% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 1276.19% 100.00% -1176.19% - - - 0.08 92.16% - - -1176.19% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 114.02% 100.00% -14.02% - - - 0.88 12.30% - - -14.02% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 40.66% 100.00% 59.34% - - - 2.46 -145.96% - - 59.34% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6508.78 -650778.00% - - 99.98% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 10.54% 100.00% 89.46% - - - 9.49 -848.51% - - 89.46% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 825.52 -82452.00% - - 99.88% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.36 -14736.00% - - 99.33% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 163.42 -16242.00% - - 99.39% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 117.66% 100.00% -17.66% - - - 0.85 15.01% - - -17.66% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 124.59 -12359.00% - - 99.20% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 45.75% 100.00% 54.25% - - - 2.19 -118.59% - - 54.25% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 45.75% 100.00% 54.25% - - - 2.19 -118.59% - - 54.25% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 88.49% 0.00% -88.49% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 161.81% 0.00% -161.81% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 159.97% 0.00% -159.97% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 159.97% 0.00% -159.97% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 159.97% 0.00% -159.97% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 210.83% 0.00% -210.83% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 185.82% 0.00% -185.82% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 185.82% 0.00% -185.82% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 69.66% 0.00% -69.66% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 106.66% 0.00% -106.66% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 106.66% 0.00% -106.66% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 59.31% 0.00% -59.31% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 0.00% -32.30% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 58.29% 0.00% -58.29% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 167.95% 0.00% -167.95% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 163.84% 0.00% -163.84% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 99.89% 0.00% -99.89% - - - 0.00 100.00% - - 0.00% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 80.72% 0.00% -80.72% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 148.15% 0.00% -148.15% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 0.00% -96.70% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 42.88% 0.00% -42.88% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/2 A LA PARED
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 0.00% -79.66% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 49.75% 0.00% -49.75% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 21
- - - - - - 1.30% 1.25% 62.76% 42.53% -20.23% - - - 0.68 32.23% - - -47.55% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 92.96% 63.07% -29.89% - - - 0.68 32.16% - - -47.40% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 140.89% 100.00% -40.89% - - - 0.71 29.02% - - -40.89% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 192.22% 100.00% -92.22% - - - 0.52 47.98% - - -92.22% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 323.95% 100.00% -223.95% - - - 0.31 69.13% - - -223.95% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 144.69% 100.00% -44.69% - - - 0.69 30.89% - - -44.69% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN POLVO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 81.67% 100.00% 18.33% - - - 1.22 -22.44% - - 18.33% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 68.03% 100.00% 31.97% - - - 1.47 -47.00% - - 31.97% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 37.34% 100.00% 62.66% - - - 2.68 -167.83% - - 62.66% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1887.30 -188630.00% - - 99.95% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 95.90% 100.00% 4.10% - - - 1.04 -4.28% - - 4.10% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 95.90% 100.00% 4.10% - - - 1.04 -4.28% - - 4.10% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 92.85% 67.00% -25.85% - - - 0.72 27.84% - - -38.58% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 134.82% 67.00% -67.82% - - - 0.50 50.30% - - -101.22% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 493132.73% 67.00% -493065.73% - - - 0.00 99.99% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.37 63.15% - - -171.37% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 7250.16% 67.00% -7183.16% - - - 0.01 99.08% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 7.59 -659.11% - - 86.83% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.57 43.05% - - -75.59% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 2390.01% 67.00% -2323.01% - - - 0.03 97.20% - - -3467.18% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 18.51 -1751.21% - - 94.60% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 210.86% 67.00% -143.86% - - - 0.32 68.23% - - -214.71% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 787.47% 67.00% -720.47% - - - 0.09 91.49% - - -1075.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 67.94 -6694.47% - - 98.53% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 263.60 -26260.48% - - 99.62% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 207.22% 67.00% -140.22% - - - 0.32 67.67% - - -209.28% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 240.93 -23992.53% - - 99.58% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.04 95.98% - - -2387.56% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 151.11% 67.00% -84.11% - - - 0.44 55.66% - - -125.53% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 107.40% 67.00% -40.40% - - - 0.62 37.62% - - -60.30% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 32.64 -3164.24% - - 96.94% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 31.32% 67.00% 35.68% - - - 2.14 -113.93% - - 53.26% - 0.00%
ACERO DE 1/2 X 12 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 446.51 -44550.81% - - 99.78% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 251.92% 67.00% -184.92% - - - 0.27 73.40% - - -276.00% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 67.00% -142.89% - - - 0.32 68.08% - - -213.27% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 233.97% 67.00% -166.97% - - - 0.29 71.36% - - -249.21% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 233.63% 67.00% -166.63% - - - 0.29 71.32% - - -248.71% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1005.54% 67.00% -938.54% - - - 0.07 93.34% - - -1400.80% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 109.15% 67.00% -42.15% - - - 0.61 38.62% - - -62.91% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 67.00% 67.00% - - - 7644.61 -764360.62% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 67.00% 67.00% - - - 5710.62 -570961.77% - - 99.98% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO DE 2" (80 PSI) PVC DRENAJE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE GALVANIZADO CALIBRE 10
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 67.00% 67.00% - - - 1289.80 -128880.36% - - 99.92% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 760.07 -75906.81% - - 99.87% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 529.74 -52873.55% - - 99.81% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 47.08% 67.00% 19.92% - - - 1.42 -42.31% - - 29.73% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 47.08% 67.00% 19.92% - - - 1.42 -42.31% - - 29.73% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 67.00% 67.00% - - - 2135.65 -213465.18% - - 99.95% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 67.00% 67.00% - - - 17336.39 -1733539.07% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 106.32% 100.00% -6.32% - - - 0.94 5.94% - - -6.32% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 151.49% 100.00% -51.49% - - - 0.66 33.99% - - -51.49% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 17575.98% 100.00% -17475.98% - - - 0.01 99.43% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 335.90% 100.00% -235.90% - - - 0.30 70.23% - - -235.90% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 171.15% 100.00% -71.15% - - - 0.58 41.57% - - -71.15% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 127.90% 100.00% -27.90% - - - 0.78 21.81% - - -27.90% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 120.47% 100.00% -20.47% - - - 0.83 16.99% - - -20.47% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 16.11% 100.00% 83.89% - - - 6.21 -520.85% - - 83.89% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 321.52% 100.00% -221.52% - - - 0.31 68.90% - - -221.52% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 174.74% 100.00% -74.74% - - - 0.57 42.77% - - -74.74% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 174.93% 100.00% -74.93% - - - 0.57 42.83% - - -74.93% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 57.34% 100.00% 42.66% - - - 1.74 -74.40% - - 42.66% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 57.34% 100.00% 42.66% - - - 1.74 -74.40% - - 42.66% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 56.37% 0.00% -56.37% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 15.41% 0.00% -15.41% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 13.15% 0.00% -13.15% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 107.03% 0.00% -107.03% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 83.28% 0.00% -83.28% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 66.74% 0.00% -66.74% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 828.94% 0.00% -828.94% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 4.44% 0.00% -4.44% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 9"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 81.49% 0.00% -81.49% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 81.49% 0.00% -81.49% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 52.94% 69.88% 16.94% - - - 1.32 -31.99% - - 24.24% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 99.79% 68.00% -31.79% - - - 0.68 31.86% - - -46.76% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 102.79% 68.00% -34.79% - - - 0.66 33.84% - - -51.16% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 68.00% -32.00% - - - 0.68 32.00% - - -47.06% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 68.00% -32.00% - - - 0.68 32.00% - - -47.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.17% 72.00% 71.83% - - - 433.81 -43281.42% - - 99.77% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 5.70% 72.00% 66.30% - - - 12.64 -1163.54% - - 92.09% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 688.00 -68699.60% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 688.00 -68699.60% - - 99.85% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 25.96% 0.00% -25.96% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 2.14% 0.00% -2.14% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 6.17% 0.00% -6.17% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 2.07% 0.00% -2.07% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 3.67% 0.00% -3.67% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 36
- - - - - - 1.30% 1.25% 92.11% 63.05% -29.06% - - - 0.68 31.55% - - -46.09% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 105.92% 100.00% -5.92% - - - 0.94 5.59% - - -5.92% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 132.23% 100.00% -32.23% - - - 0.76 24.38% - - -32.23% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 201.24% 100.00% -101.24% - - - 0.50 50.31% - - -101.24% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 314.04% 100.00% -214.04% - - - 0.32 68.16% - - -214.04% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 129.25% 100.00% -29.25% - - - 0.77 22.63% - - -29.25% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 70.77% 100.00% 29.23% - - - 1.41 -41.30% - - 29.23% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 106.89% 100.00% -6.89% - - - 0.94 6.44% - - -6.89% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.96% 100.00% -27.96% - - - 0.78 21.85% - - -27.96% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 95.60% 100.00% 4.40% - - - 1.05 -4.61% - - 4.40% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 5982.33% 100.00% -5882.33% - - - 0.02 98.33% - - -5882.33% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.07% 100.00% 62.93% - - - 2.70 -169.75% - - 62.93% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 65.63% 100.00% 34.37% - - - 1.52 -52.37% - - 34.37% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 65.63% 100.00% 34.37% - - - 1.52 -52.37% - - 34.37% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 129.48% 100.00% -29.48% - - - 0.77 22.77% - - -29.48% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 174.77% 100.00% -74.77% - - - 0.57 42.78% - - -74.77% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 1204757.78% 100.00% -1204657.78% - - - 0.00 99.99% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 4004.00% 100.00% -3904.00% - - - 0.02 97.50% - - -3904.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 296.67% 100.00% -196.67% - - - 0.34 66.29% - - -196.67% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 180.63% 100.00% -80.63% - - - 0.55 44.64% - - -80.63% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 139.23% 100.00% -39.23% - - - 0.72 28.18% - - -39.23% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 119.77% 100.00% -19.77% - - - 0.83 16.51% - - -19.77% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 64.43% 100.00% 35.57% - - - 1.55 -55.20% - - 35.57% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 292.11% 100.00% -192.11% - - - 0.34 65.77% - - -192.11% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 220.72% 100.00% -120.72% - - - 0.45 54.69% - - -120.72% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 337.18% 100.00% -237.18% - - - 0.30 70.34% - - -237.18% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 81.37% 100.00% 18.63% - - - 1.23 -22.89% - - 18.63% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 81.37% 100.00% 18.63% - - - 1.23 -22.89% - - 18.63% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 106.18% 100.00% -6.18% - - - 0.94 5.82% - - -6.18% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 161.50% 100.00% -61.50% - - - 0.62 38.08% - - -61.50% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 161.50% 100.00% -61.50% - - - 0.62 38.08% - - -61.50% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 15.85% 100.00% 84.15% - - - 6.31 -530.76% - - 84.15% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 309.38% 100.00% -209.38% - - - 0.32 67.68% - - -209.38% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 309.38% 100.00% -209.38% - - - 0.32 67.68% - - -209.38% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 34.64% 100.00% 65.36% - - - 2.89 -188.72% - - 65.36% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 31.26% 100.00% 68.74% - - - 3.20 -219.86% - - 68.74% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 207.23% 100.00% -107.23% - - - 0.48 51.75% - - -107.23% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 11.21% 100.00% 88.79% - - - 8.92 -791.73% - - 88.79% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 9.51% 100.00% 90.49% - - - 10.52 -951.88% - - 90.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 53.52% 100.00% 46.48% - - - 1.87 -86.86% - - 46.48% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 411.87% 100.00% -311.87% - - - 0.24 75.72% - - -311.87% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 77.51% 100.00% 22.49% - - - 1.29 -29.02% - - 22.49% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 112.92% 100.00% -12.92% - - - 0.89 11.44% - - -12.92% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 231465.45% 100.00% -231365.45% - - - 0.00 99.96% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 135.27% 100.00% -35.27% - - - 0.74 26.08% - - -35.27% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 106.96% 100.00% -6.96% - - - 0.93 6.51% - - -6.96% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.01% 100.00% 27.99% - - - 1.39 -38.87% - - 27.99% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 287.01% 100.00% -187.01% - - - 0.35 65.16% - - -187.01% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 266.61% 100.00% -166.61% - - - 0.38 62.49% - - -166.61% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 168.20% 100.00% -68.20% - - - 0.59 40.55% - - -68.20% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 887.93% 100.00% -787.93% - - - 0.11 88.74% - - -787.93% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 122.34% 100.00% -22.34% - - - 0.82 18.26% - - -22.34% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 12.18 -1118.00% - - 91.79% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 100.00% 61.13% - - - 2.57 -157.29% - - 61.13% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 100.00% 61.13% - - - 2.57 -157.29% - - 61.13% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 56.46% 86.12% 29.66% - - - 1.53 -52.54% - - 34.44% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 105.47% 88.00% -17.47% - - - 0.83 16.56% - - -19.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 108.64% 88.00% -20.64% - - - 0.81 19.00% - - -23.45% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 1.24% 84.00% 82.76% - - - 67.48 -6648.30% - - 98.52% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 42.74% 84.00% 41.26% - - - 1.97 -96.55% - - 49.12% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 91.31% 0.00% -91.31% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 174.22% 0.00% -174.22% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 170.33% 0.00% -170.33% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 75.79% 0.00% -75.79% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 73.87% 0.00% -73.87% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO SERVICIOS MATERIALES Y MANO DE OBRA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 129.26% 0.00% -129.26% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 129.26% 0.00% -129.26% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 129.26% 0.00% -129.26% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 34.83% 0.00% -34.83% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 2-1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 16.40% 0.00% -16.40% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO SERVICIOS MATERIALES Y MANO DE OBRA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 143.62% 0.00% -143.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 133.18% 0.00% -133.18% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 133.18% 0.00% -133.18% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 0.00% -32.30% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 163.29% 0.00% -163.29% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 163.29% 0.00% -163.29% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 163.29% 0.00% -163.29% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 19.53% 0.00% -19.53% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 56.26% 0.00% -56.26% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 52.15% 0.00% -52.15% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 80.72% 0.00% -80.72% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 148.15% 0.00% -148.15% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 17
- - - - - - 1.30% 1.25% 58.57% 42.53% -16.04% - - - 0.73 27.39% - - -37.72% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 50.74% 63.07% 12.33% - - - 1.24 -24.31% - - 19.56% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 107.95% 100.00% -7.95% - - - 0.93 7.36% - - -7.95% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 157.39% 100.00% -57.39% - - - 0.64 36.46% - - -57.39% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 323.95% 100.00% -223.95% - - - 0.31 69.13% - - -223.95% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 19.29% 100.00% 80.71% - - - 5.18 -418.48% - - 80.71% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 68.03% 100.00% 31.97% - - - 1.47 -47.00% - - 31.97% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2594.18 -259318.00% - - 99.96% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1887.30 -188630.00% - - 99.95% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 842.97 -84197.00% - - 99.88% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 61.64% 100.00% 38.36% - - - 1.62 -62.22% - - 38.36% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 61.64% 100.00% 38.36% - - - 1.62 -62.22% - - 38.36% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 46.98% 67.00% 20.02% - - - 1.43 -42.63% - - 29.89% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 55.54% 67.00% 11.46% - - - 1.21 -20.64% - - 17.11% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 54205.45% 67.00% -54138.45% - - - 0.00 99.88% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.37 63.15% - - -171.37% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 2070.94% 67.00% -2003.94% - - - 0.03 96.76% - - -2990.95% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 18.51 -1751.21% - - 94.60% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2044.33% 67.00% -1977.33% - - - 0.03 96.72% - - -2951.25% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 7.59 -659.11% - - 86.83% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.57 43.05% - - -75.59% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 147.65% 67.00% -80.65% - - - 0.45 54.62% - - -120.37% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 98.57% 67.00% -31.57% - - - 0.68 32.03% - - -47.12% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 32.64 -3164.24% - - 96.94% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 564.33 -56332.76% - - 99.82% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 446.51 -44550.81% - - 99.78% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 434.35% 67.00% -367.35% - - - 0.15 84.57% - - -548.29% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 67.00% -142.89% - - - 0.32 68.08% - - -213.27% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 233.97% 67.00% -166.97% - - - 0.29 71.36% - - -249.21% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 232.47% 67.00% -165.47% - - - 0.29 71.18% - - -246.97% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 710.93% 67.00% -643.93% - - - 0.09 90.58% - - -961.09% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 132.14% 67.00% -65.14% - - - 0.51 49.30% - - -97.23% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 240.93 -23992.53% - - 99.58% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.04 95.98% - - -2387.56% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 452.79 -45179.27% - - 99.78% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 121.24 -12024.32% - - 99.18% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 67.94 -6694.47% - - 98.53% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 263.60 -26260.48% - - 99.62% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 67.00% 67.00% - - - 1289.80 -128880.36% - - 99.92% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 760.07 -75906.81% - - 99.87% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 529.74 -52873.55% - - 99.81% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 0.00% 67.00% 67.00% - - - 13355.22 -1335422.39% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 67.00% 67.00% - - - 7644.61 -764360.62% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 67.00% 67.00% - - - 5710.62 -570961.77% - - 99.98% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 67.00% 28.13% - - - 1.72 -72.39% - - 41.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 67.00% 28.13% - - - 1.72 -72.39% - - 41.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 67.00% 67.00% - - - 2135.65 -213465.18% - - 99.95% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 67.00% 67.00% - - - 17336.39 -1733539.07% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 40.65% 100.00% 59.35% - - - 2.46 -146.00% - - 59.35% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 56.10% 100.00% 43.90% - - - 1.78 -78.27% - - 43.90% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 56.10% 100.00% 43.90% - - - 1.78 -78.27% - - 43.90% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 29.13% 100.00% 70.87% - - - 3.43 -243.30% - - 70.87% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2766.17% 100.00% -2666.17% - - - 0.04 96.38% - - -2666.17% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 179.60% 100.00% -79.60% - - - 0.56 44.32% - - -79.60% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 78.41% 100.00% 21.59% - - - 1.28 -27.53% - - 21.59% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 98.57% 100.00% 1.43% - - - 1.01 -1.45% - - 1.43% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 32.21% 100.00% 67.79% - - - 3.10 -210.42% - - 67.79% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 106.55% 100.00% -6.55% - - - 0.94 6.15% - - -6.55% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.94 -10094.00% - - 99.02% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 0.00% 100.00% 100.00% - - - 16308.96 -1630796.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 40.70% 0.00% -40.70% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 3.52% 0.00% -3.52% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 0.15% 0.00% -0.15% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 15.02% 0.00% -15.02% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 621.70% 0.00% -621.70% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 37.13% 0.00% -37.13% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 37.13% 0.00% -37.13% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 63.46% 0.00% -63.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 63.46% 0.00% -63.46% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 52.96% 69.88% 16.92% - - - 1.32 -31.96% - - 24.22% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 99.79% 68.00% -31.79% - - - 0.68 31.86% - - -46.76% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 102.79% 68.00% -34.79% - - - 0.66 33.84% - - -51.16% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 68.00% -32.00% - - - 0.68 32.00% - - -47.06% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 68.00% -32.00% - - - 0.68 32.00% - - -47.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.19% 72.00% 71.81% - - - 375.83 -37483.43% - - 99.73% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 72.00% 65.42% - - - 10.95 -994.66% - - 90.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 688.00 -68699.60% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 688.00 -68699.60% - - 99.85% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 72.31% 0.00% -72.31% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 189.24% 0.00% -189.24% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 188.26% 0.00% -188.26% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 2.14% 0.00% -2.14% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 6.17% 0.00% -6.17% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 2.07% 0.00% -2.07% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 16
- - - - - - 1.30% 1.25% 57.79% 42.53% -15.26% - - - 0.74 26.41% - - -35.89% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 49.26% 63.07% 13.81% - - - 1.28 -28.03% - - 21.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 58.91% 67.00% 8.09% - - - 1.14 -13.74% - - 12.08% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 77.95% 67.00% -10.95% - - - 0.86 14.05% - - -16.35% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 54205.45% 67.00% -54138.45% - - - 0.00 99.88% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.37 63.15% - - -171.37% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2044.33% 67.00% -1977.33% - - - 0.03 96.72% - - -2951.25% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 7.59 -659.11% - - 86.83% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.57 43.05% - - -75.59% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 237.50% 67.00% -170.50% - - - 0.28 71.79% - - -254.47% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 240.93 -23992.53% - - 99.58% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.04 95.98% - - -2387.56% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 220.23% 67.00% -153.23% - - - 0.30 69.58% - - -228.70% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 125.45% 67.00% -58.45% - - - 0.53 46.59% - - -87.24% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 32.64 -3164.24% - - 96.94% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 564.33 -56332.76% - - 99.82% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 446.51 -44550.81% - - 99.78% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 330.35% 67.00% -263.35% - - - 0.20 79.72% - - -393.07% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 67.00% -142.89% - - - 0.32 68.08% - - -213.27% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 421.14% 67.00% -354.14% - - - 0.16 84.09% - - -528.57% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 531.20% 67.00% -464.20% - - - 0.13 87.39% - - -692.83% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1375.57% 67.00% -1308.57% - - - 0.05 95.13% - - -1953.09% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 18.51 -1751.21% - - 94.60% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 18.51 -1751.21% - - 94.60% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 452.79 -45179.27% - - 99.78% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 121.24 -12024.32% - - 99.18% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 67.94 -6694.47% - - 98.53% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 263.60 -26260.48% - - 99.62% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 67.00% 67.00% - - - 1289.80 -128880.36% - - 99.92% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 760.07 -75906.81% - - 99.87% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 529.74 -52873.55% - - 99.81% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 0.00% 67.00% 67.00% - - - 13355.22 -1335422.39% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 67.00% 67.00% - - - 7644.61 -764360.62% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 67.00% 67.00% - - - 5710.62 -570961.77% - - 99.98% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 67.00% 28.13% - - - 1.72 -72.39% - - 41.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 67.00% 28.13% - - - 1.72 -72.39% - - 41.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 67.00% 67.00% - - - 2135.65 -213465.18% - - 99.95% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 67.00% 67.00% - - - 17336.39 -1733539.07% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 67.00% 67.00% - - - 849.50 -84849.97% - - 99.88% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 46.93% 100.00% 53.07% - - - 2.13 -113.06% - - 53.07% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 56.10% 100.00% 43.90% - - - 1.78 -78.27% - - 43.90% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 56.10% 100.00% 43.90% - - - 1.78 -78.27% - - 43.90% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 40.94% 100.00% 59.06% - - - 2.44 -144.26% - - 59.06% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 82755.56% 100.00% -82655.56% - - - 0.00 99.88% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 117.20% 100.00% -17.20% - - - 0.85 14.68% - - -17.20% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 142.38% 100.00% -42.38% - - - 0.70 29.76% - - -42.38% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 689.14 -68814.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 12 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 186.93% 100.00% -86.93% - - - 0.53 46.50% - - -86.93% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 68.19% 100.00% 31.81% - - - 1.47 -46.65% - - 31.81% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 242.95% 100.00% -142.95% - - - 0.41 58.84% - - -142.95% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 33.13% 100.00% 66.87% - - - 3.02 -201.81% - - 66.87% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 0.00% 100.00% 100.00% - - - 16308.96 -1630796.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 38.41% 100.00% 61.59% - - - 2.60 -160.34% - - 61.59% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 61.64% 100.00% 38.36% - - - 1.62 -62.22% - - 38.36% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 61.64% 100.00% 38.36% - - - 1.62 -62.22% - - 38.36% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 22.08% 100.00% 77.92% - - - 4.53 -352.98% - - 77.92% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 764.78% 100.00% -664.78% - - - 0.13 86.92% - - -664.78% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 47858.63% 100.00% -47758.63% - - - 0.00 99.79% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 124.56% 100.00% -24.56% - - - 0.80 19.72% - - -24.56% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 5.36% 100.00% 94.64% - - - 18.67 -1766.97% - - 94.64% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 78.91% 100.00% 21.09% - - - 1.27 -26.72% - - 21.09% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2594.18 -259318.00% - - 99.96% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1887.30 -188630.00% - - 99.95% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 43.79% 0.00% -43.79% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 0.98% 0.00% -0.98% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 8.77% 0.00% -8.77% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.35% 0.00% -71.35% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 69.97% 0.00% -69.97% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 69.97% 0.00% -69.97% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 52.96% 69.88% 16.92% - - - 1.32 -31.96% - - 24.22% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 99.79% 68.00% -31.79% - - - 0.68 31.86% - - -46.76% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 102.79% 68.00% -34.79% - - - 0.66 33.84% - - -51.16% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 68.00% -32.00% - - - 0.68 32.00% - - -47.06% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 68.00% -32.00% - - - 0.68 32.00% - - -47.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 68.00% 68.00% - - - 731.97 -73097.24% - - 99.86% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.19% 72.00% 71.81% - - - 375.83 -37483.43% - - 99.73% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 72.00% 65.42% - - - 10.95 -994.66% - - 90.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 688.00 -68699.60% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 688.00 -68699.60% - - 99.85% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 72.00% 72.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 72.00% 72.00% - - - 22933.19 -2293218.80% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 72.10% 0.00% -72.10% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 188.26% 0.00% -188.26% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 188.26% 0.00% -188.26% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 93.72% 0.00% -93.72% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 0.00% -121.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 2.14% 0.00% -2.14% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 6.17% 0.00% -6.17% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 2.07% 0.00% -2.07% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 68.46% 0.00% -68.46% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 46.59% 0.00% -46.59% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 35
- - - - - - 1.30% 1.25% 83.66% 63.05% -20.61% - - - 0.75 24.64% - - -32.69% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 103.59% 100.00% -3.59% - - - 0.97 3.46% - - -3.59% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 126.21% 100.00% -26.21% - - - 0.79 20.77% - - -26.21% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 168.24% 100.00% -68.24% - - - 0.59 40.56% - - -68.24% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 168.24% 100.00% -68.24% - - - 0.59 40.56% - - -68.24% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 57.99% 100.00% 42.01% - - - 1.72 -72.46% - - 42.01% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 214.13% 100.00% -114.13% - - - 0.47 53.30% - - -114.13% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 96.27% 100.00% 3.73% - - - 1.04 -3.87% - - 3.73% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 5087.30% 100.00% -4987.30% - - - 0.02 98.03% - - -4987.30% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 154.69% 100.00% -54.69% - - - 0.65 35.36% - - -54.69% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 154.69% 100.00% -54.69% - - - 0.65 35.36% - - -54.69% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 52.93% 100.00% 47.07% - - - 1.89 -88.93% - - 47.07% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 14.32% 100.00% 85.68% - - - 6.98 -598.31% - - 85.68% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 12.01% 100.00% 87.99% - - - 8.33 -732.68% - - 87.99% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 67.78% 100.00% 32.22% - - - 1.48 -47.53% - - 32.22% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPERMEABILIZANTE FASTYL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 122.21% 100.00% -22.21% - - - 0.82 18.18% - - -22.21% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 152.23% 100.00% -52.23% - - - 0.66 34.31% - - -52.23% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 139946.67% 100.00% -139846.67% - - - 0.00 99.93% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 317.41% 100.00% -217.41% - - - 0.32 68.49% - - -217.41% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 171.15% 100.00% -71.15% - - - 0.58 41.57% - - -71.15% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 139.34% 100.00% -39.34% - - - 0.72 28.23% - - -39.34% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 119.77% 100.00% -19.77% - - - 0.83 16.51% - - -19.77% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 64.43% 100.00% 35.57% - - - 1.55 -55.20% - - 35.57% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 292.11% 100.00% -192.11% - - - 0.34 65.77% - - -192.11% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 220.72% 100.00% -120.72% - - - 0.45 54.69% - - -120.72% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 337.18% 100.00% -237.18% - - - 0.30 70.34% - - -237.18% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 91.92% 100.00% 8.08% - - - 1.09 -8.79% - - 8.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 91.92% 100.00% 8.08% - - - 1.09 -8.79% - - 8.08% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 83.39% 100.00% 16.61% - - - 1.20 -19.92% - - 16.61% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 109.60% 100.00% -9.60% - - - 0.91 8.76% - - -9.60% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 204.78% 100.00% -104.78% - - - 0.49 51.17% - - -104.78% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 108.85% 100.00% -8.85% - - - 0.92 8.13% - - -8.85% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 175.59% 100.00% -75.59% - - - 0.57 43.05% - - -75.59% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 219.35% 100.00% -119.35% - - - 0.46 54.41% - - -119.35% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 43.87% 100.00% 56.13% - - - 2.28 -127.95% - - 56.13% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.07% 100.00% 62.93% - - - 2.70 -169.75% - - 62.93% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 61.64% 100.00% 38.36% - - - 1.62 -62.22% - - 38.36% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 61.64% 100.00% 38.36% - - - 1.62 -62.22% - - 38.36% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 78.46% 100.00% 21.54% - - - 1.27 -27.45% - - 21.54% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 114.71% 100.00% -14.71% - - - 0.87 12.82% - - -14.71% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 342969.09% 100.00% -342869.09% - - - 0.00 99.97% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 135.31% 100.00% -35.31% - - - 0.74 26.10% - - -35.31% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 107.03% 100.00% -7.03% - - - 0.93 6.57% - - -7.03% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.01% 100.00% 27.99% - - - 1.39 -38.87% - - 27.99% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 287.01% 100.00% -187.01% - - - 0.35 65.16% - - -187.01% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 266.61% 100.00% -166.61% - - - 0.38 62.49% - - -166.61% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 168.20% 100.00% -68.20% - - - 0.59 40.55% - - -68.20% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 887.93% 100.00% -787.93% - - - 0.11 88.74% - - -787.93% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 122.34% 100.00% -22.34% - - - 0.82 18.26% - - -22.34% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 12.18 -1118.00% - - 91.79% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 100.00% 61.13% - - - 2.57 -157.29% - - 61.13% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 100.00% 61.13% - - - 2.57 -157.29% - - 61.13% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 65.27% 86.12% 20.85% - - - 1.32 -31.95% - - 24.22% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 104.28% 88.00% -16.28% - - - 0.84 15.61% - - -18.50% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 107.02% 88.00% -19.02% - - - 0.82 17.77% - - -21.61% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 12.91% 88.00% 75.09% - - - 6.82 -581.53% - - 85.33% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA DE AISLAR SCOTCH
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 21.32% 84.00% 62.68% - - - 3.94 -294.06% - - 74.62% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 731.87% 84.00% -647.87% - - - 0.11 88.52% - - -771.27% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 65.52% 0.00% -65.52% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 98.42% 0.00% -98.42% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 94.54% 0.00% -94.54% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 157.19% 0.00% -157.19% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 157.19% 0.00% -157.19% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 157.19% 0.00% -157.19% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 247.29% 0.00% -247.29% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 193.86% 0.00% -193.86% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 193.86% 0.00% -193.86% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 88.59% 0.00% -88.59% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 105.08% 0.00% -105.08% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 105.08% 0.00% -105.08% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGATEC PLUS ADHESIVO PARA CERAMICA GRIS DE 20KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGATEC SISATEC SISA NEGRO DE 10 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO GR 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA GRIS 20X66
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 57.57% 0.00% -57.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 57.57% 0.00% -57.57% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 57.57% 0.00% -57.57% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.92% 0.00% -1.92% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 5.54% 0.00% -5.54% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 1.43% 0.00% -1.43% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 10
- - - - - - 1.30% 1.25% 130.03% 98.52% -31.51% - - - 0.76 24.23% - - -31.98% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 155.66% 98.98% -56.68% - - - 0.64 36.41% - - -57.26% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 382.81% 100.00% -282.81% - - - 0.26 73.88% - - -282.81% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 231.39% 100.00% -131.39% - - - 0.43 56.78% - - -131.39% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 231.39% 100.00% -131.39% - - - 0.43 56.78% - - -131.39% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 195.39% 100.00% -95.39% - - - 0.51 48.82% - - -95.39% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FELPA SIN RODILLO DE FIBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MINI FELPAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPERMEABILIZANTE FASTYL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA MOUNTAIN FULL WEATHER CUBETA MATE COLOR BLANCO DE LINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA PROCOAT CUBETA MATE COLOR BLANCO DE LINEA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE EXTRA WHITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE DEEP
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 293.44% 100.00% -193.44% - - - 0.34 65.92% - - -193.44% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 288.18% 100.00% -188.18% - - - 0.35 65.30% - - -188.18% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 193.64% 100.00% -93.64% - - - 0.52 48.36% - - -93.64% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 193.64% 100.00% -93.64% - - - 0.52 48.36% - - -93.64% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #220 H-98 O A-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #150 H-98 O C-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 100 P/AGUA BASE DE LONA 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 263.66% 100.00% -163.66% - - - 0.38 62.07% - - -163.66% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 238.18% 100.00% -138.18% - - - 0.42 58.01% - - -138.18% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 112.49% 100.00% -12.49% - - - 0.89 11.10% - - -12.49% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 184.50% 100.00% -84.50% - - - 0.54 45.80% - - -84.50% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 164.24% 100.00% -64.24% - - - 0.61 39.11% - - -64.24% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 164.24% 100.00% -64.24% - - - 0.61 39.11% - - -64.24% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 74.23% 100.00% 25.77% - - - 1.35 -34.71% - - 25.77% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 74.23% 100.00% 25.77% - - - 1.35 -34.71% - - 25.77% - 0.00%
PEGATEC PLUS ADHESIVO PARA CERAMICA GRIS DE 20KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 475.62 -47462.00% - - 99.79% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 446.44 -44544.00% - - 99.78% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1950.66 -194966.00% - - 99.95% - 0.00%
PISO CERAMICO ANDORRA ACERO 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO GR 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA PLOMO 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA GRIS 20X66
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 47.67% 100.00% 52.33% - - - 2.10 -109.76% - - 52.33% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 2''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 35.36% 100.00% 64.64% - - - 2.83 -182.80% - - 64.64% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 101.89% 100.00% -1.89% - - - 0.98 1.85% - - -1.89% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 97.78% 100.00% 2.22% - - - 1.02 -2.27% - - 2.22% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 193.01% 100.00% -93.01% - - - 0.52 48.19% - - -93.01% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 254.95% 100.00% -154.95% - - - 0.39 60.78% - - -154.95% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 406.92% 100.00% -306.92% - - - 0.25 75.43% - - -306.92% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 41.26% 100.00% 58.74% - - - 2.42 -142.37% - - 58.74% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 100.00% 100.00% - - - 1539.00 -153800.00% - - 99.94% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 549.22% 0.00% -549.22% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPONJA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 532.90% 0.00% -532.90% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 532.90% 0.00% -532.90% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 138.18% 100.00% -38.18% - - - 0.72 27.63% - - -38.18% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 159.85% 100.00% -59.85% - - - 0.63 37.44% - - -59.85% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 216.53% 100.00% -116.53% - - - 0.46 53.82% - - -116.53% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 424.58% 100.00% -324.58% - - - 0.24 76.45% - - -324.58% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 297.37% 100.00% -197.37% - - - 0.34 66.37% - - -197.37% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 99.17% 100.00% 0.83% - - - 1.01 -0.84% - - 0.83% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 120.06% 100.00% -20.06% - - - 0.83 16.71% - - -20.06% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 26.53% 100.00% 73.47% - - - 3.77 -276.87% - - 73.47% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 143.03% 100.00% -43.03% - - - 0.70 30.09% - - -43.03% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 187.77% 100.00% -87.77% - - - 0.53 46.74% - - -87.77% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL DE 2 1/2"X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA FINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO TABLAYESO DE 7 X 7/16" ROSCA FINA PUNTA CORRIENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 99.54% 100.00% 0.46% - - - 1.00 -0.46% - - 0.46% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 99.54% 100.00% 0.46% - - - 1.00 -0.46% - - 0.46% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 158.91% 100.00% -58.91% - - - 0.63 37.07% - - -58.91% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 240.74% 100.00% -140.74% - - - 0.42 58.46% - - -140.74% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 422.42% 100.00% -322.42% - - - 0.24 76.33% - - -322.42% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 107.00% 100.00% -7.00% - - - 0.93 6.54% - - -7.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 60.93% 100.00% 39.07% - - - 1.64 -64.13% - - 39.07% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 100.17% 100.00% -0.17% - - - 1.00 0.17% - - -0.17% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 81.65% 100.00% 18.35% - - - 1.22 -22.48% - - 18.35% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.54% 100.00% 62.46% - - - 2.66 -166.39% - - 62.46% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 80.15% 100.00% 19.85% - - - 1.25 -24.76% - - 19.85% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 80.15% 100.00% 19.85% - - - 1.25 -24.76% - - 19.85% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 108.09% 100.00% -8.09% - - - 0.93 7.48% - - -8.09% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 145.31% 100.00% -45.31% - - - 0.69 31.18% - - -45.31% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 169.51% 100.00% -69.51% - - - 0.59 41.00% - - -69.51% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 169.51% 100.00% -69.51% - - - 0.59 41.00% - - -69.51% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 106.65% 100.00% -6.65% - - - 0.94 6.24% - - -6.65% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 1086.96% 100.00% -986.96% - - - 0.09 90.80% - - -986.96% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
POLIURETANO MARCA DYMONIC 100
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 1020.97% 100.00% -920.97% - - - 0.10 90.21% - - -920.97% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 1020.97% 100.00% -920.97% - - - 0.10 90.21% - - -920.97% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 269.46% 100.00% -169.46% - - - 0.37 62.89% - - -169.46% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 177.19% 100.00% -77.19% - - - 0.56 43.56% - - -77.19% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 4202.73% 100.00% -4102.73% - - - 0.02 97.62% - - -4102.73% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 156.91% 100.00% -56.91% - - - 0.64 36.27% - - -56.91% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
PLYWOOD FENOLICO DE 4'X8'X1/4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 101.50% 100.00% -1.50% - - - 0.99 1.48% - - -1.50% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 26.78% 100.00% 73.22% - - - 3.73 -273.46% - - 73.22% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 4269.91% 100.00% -4169.91% - - - 0.02 97.66% - - -4169.91% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 2221.04% 100.00% -2121.04% - - - 0.05 95.50% - - -2121.04% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 13.36% 100.00% 86.64% - - - 7.48 -648.42% - - 86.64% - 0.00%
LIJA P/AGUA #220 H-98 O A-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #150 H-98 O C-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MINI FELPAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 108.14% 100.00% -8.14% - - - 0.92 7.52% - - -8.14% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 162.69% 100.00% -62.69% - - - 0.61 38.53% - - -62.69% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6432.68% 100.00% -6332.68% - - - 0.02 98.45% - - -6332.68% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 233.98% 100.00% -133.98% - - - 0.43 57.26% - - -133.98% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 195.61% 100.00% -95.61% - - - 0.51 48.88% - - -95.61% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 134.10% 100.00% -34.10% - - - 0.75 25.43% - - -34.10% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 89.03% 100.00% 10.97% - - - 1.12 -12.33% - - 10.97% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 84.88% 100.00% 15.12% - - - 1.18 -17.81% - - 15.12% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 301.27% 100.00% -201.27% - - - 0.33 66.81% - - -201.27% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 211.59% 100.00% -111.59% - - - 0.47 52.74% - - -111.59% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 354.24% 100.00% -254.24% - - - 0.28 71.77% - - -254.24% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 195.69% 100.00% -95.69% - - - 0.51 48.90% - - -95.69% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 911.34% 100.00% -811.34% - - - 0.11 89.03% - - -811.34% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 48.11% 100.00% 51.89% - - - 2.08 -107.87% - - 51.89% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 48.11% 100.00% 51.89% - - - 2.08 -107.87% - - 51.89% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 45.88% 100.00% 54.12% - - - 2.18 -117.95% - - 54.12% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 58.26% 93.64% 35.38% - - - 1.61 -60.74% - - 37.79% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.13% 88.00% -12.13% - - - 0.88 12.12% - - -13.79% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 88.00% -15.14% - - - 0.85 14.68% - - -17.20% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 11.08% 100.00% 88.92% - - - 9.02 -802.33% - - 88.92% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 11.22% 100.00% 88.78% - - - 8.91 -791.46% - - 88.78% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 100.00% 93.42% - - - 15.20 -1420.37% - - 93.42% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 37
- - - - - - 1.30% 1.25% 82.78% 63.05% -19.73% - - - 0.76 23.83% - - -31.29% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 100.56% 100.00% -0.56% - - - 0.99 0.56% - - -0.56% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 124.37% 100.00% -24.37% - - - 0.80 19.59% - - -24.37% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 154.11% 100.00% -54.11% - - - 0.65 35.11% - - -54.11% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 289315.56% 100.00% -289215.56% - - - 0.00 99.97% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 500.50% 100.00% -400.50% - - - 0.20 80.02% - - -400.50% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 360.65% 100.00% -260.65% - - - 0.28 72.27% - - -260.65% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 171.15% 100.00% -71.15% - - - 0.58 41.57% - - -71.15% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 139.23% 100.00% -39.23% - - - 0.72 28.18% - - -39.23% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 119.77% 100.00% -19.77% - - - 0.83 16.51% - - -19.77% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 64.43% 100.00% 35.57% - - - 1.55 -55.20% - - 35.57% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 292.11% 100.00% -192.11% - - - 0.34 65.77% - - -192.11% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 220.72% 100.00% -120.72% - - - 0.45 54.69% - - -120.72% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 337.18% 100.00% -237.18% - - - 0.30 70.34% - - -237.18% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 94.49% 100.00% 5.51% - - - 1.06 -5.83% - - 5.51% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 94.49% 100.00% 5.51% - - - 1.06 -5.83% - - 5.51% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 109.16% 100.00% -9.16% - - - 0.92 8.39% - - -9.16% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 154.62% 100.00% -54.62% - - - 0.65 35.32% - - -54.62% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 213.89% 100.00% -113.89% - - - 0.47 53.25% - - -113.89% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 129.40% 100.00% -29.40% - - - 0.77 22.72% - - -29.40% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 70.77% 100.00% 29.23% - - - 1.41 -41.30% - - 29.23% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 106.89% 100.00% -6.89% - - - 0.94 6.44% - - -6.89% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 128.35% 100.00% -28.35% - - - 0.78 22.09% - - -28.35% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.07% 100.00% 62.93% - - - 2.70 -169.75% - - 62.93% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 67.65% 100.00% 32.35% - - - 1.48 -47.82% - - 32.35% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 67.65% 100.00% 32.35% - - - 1.48 -47.82% - - 32.35% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 101.37% 100.00% -1.37% - - - 0.99 1.35% - - -1.37% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 126.76% 100.00% -26.76% - - - 0.79 21.11% - - -26.76% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 126.76% 100.00% -26.76% - - - 0.79 21.11% - - -26.76% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 60.37% 100.00% 39.63% - - - 1.66 -65.64% - - 39.63% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 866.27% 100.00% -766.27% - - - 0.12 88.46% - - -766.27% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 866.27% 100.00% -766.27% - - - 0.12 88.46% - - -766.27% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 162.91% 100.00% -62.91% - - - 0.61 38.62% - - -62.91% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 5.56% 100.00% 94.44% - - - 17.98 -1697.97% - - 94.44% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 4780.08% 100.00% -4680.08% - - - 0.02 97.91% - - -4680.08% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 21.53% 100.00% 78.47% - - - 4.65 -364.52% - - 78.47% - 0.00%
DISCOS P/CORTE D/METAL DE 9"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 14.32% 100.00% 85.68% - - - 6.98 -598.31% - - 85.68% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 10.04% 100.00% 89.96% - - - 9.96 -895.72% - - 89.96% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 49.97% 100.00% 50.03% - - - 2.00 -100.14% - - 50.03% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN SPRAY
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 77.56% 100.00% 22.44% - - - 1.29 -28.94% - - 22.44% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 113.01% 100.00% -13.01% - - - 0.88 11.51% - - -13.01% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 33585.45% 100.00% -33485.45% - - - 0.00 99.70% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 218.82% 100.00% -118.82% - - - 0.46 54.30% - - -118.82% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 171.68% 100.00% -71.68% - - - 0.58 41.75% - - -71.68% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 294.90% 100.00% -194.90% - - - 0.34 66.09% - - -194.90% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 131.93% 100.00% -31.93% - - - 0.76 24.20% - - -31.93% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 106.96% 100.00% -6.96% - - - 0.93 6.51% - - -6.96% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.01% 100.00% 27.99% - - - 1.39 -38.86% - - 27.99% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 303.60% 100.00% -203.60% - - - 0.33 67.06% - - -203.60% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 268.68% 100.00% -168.68% - - - 0.37 62.78% - - -168.68% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 143.97% 100.00% -43.97% - - - 0.69 30.54% - - -43.97% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 898.58% 100.00% -798.58% - - - 0.11 88.87% - - -798.58% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 12.18 -1118.00% - - 91.79% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 100.00% 61.13% - - - 2.57 -157.29% - - 61.13% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 100.00% 61.13% - - - 2.57 -157.29% - - 61.13% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 54.79% 86.12% 31.33% - - - 1.57 -57.19% - - 36.38% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 103.27% 88.00% -15.27% - - - 0.85 14.79% - - -17.36% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 105.40% 88.00% -17.40% - - - 0.83 16.51% - - -19.78% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 32.22% 88.00% 55.78% - - - 2.73 -173.16% - - 63.39% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COPLA PVC GRIS DE 2" ELECTRICIDAD
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VUELTA PVC GRIS DE 2"
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA DE AISLAR SCOTCH
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.17% 84.00% 83.83% - - - 506.12 -50511.66% - - 99.80% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 5.70% 84.00% 78.30% - - - 14.74 -1374.13% - - 93.22% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 72.55% 0.00% -72.55% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 94.54% 0.00% -94.54% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 94.54% 0.00% -94.54% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 219.27% 0.00% -219.27% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 150.89% 0.00% -150.89% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 150.89% 0.00% -150.89% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 131.16% 0.00% -131.16% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 85.74% 0.00% -85.74% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 85.74% 0.00% -85.74% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 0.00% -32.30% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 216.63% 0.00% -216.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 216.63% 0.00% -216.63% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 216.63% 0.00% -216.63% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 19.53% 0.00% -19.53% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 56.26% 0.00% -56.26% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 52.15% 0.00% -52.15% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 80.72% 0.00% -80.72% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 148.15% 0.00% -148.15% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 34
- - - - - - 1.30% 1.25% 81.93% 63.05% -18.88% - - - 0.77 23.04% - - -29.94% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 99.34% 100.00% 0.66% - - - 1.01 -0.67% - - 0.66% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 147.52% 100.00% -47.52% - - - 0.68 32.21% - - -47.52% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 200.67% 100.00% -100.67% - - - 0.50 50.17% - - -100.67% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 200.67% 100.00% -100.67% - - - 0.50 50.17% - - -100.67% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 61.12% 100.00% 38.88% - - - 1.64 -63.61% - - 38.88% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2262.92% 100.00% -2162.92% - - - 0.04 95.58% - - -2162.92% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 247.51% 100.00% -147.51% - - - 0.40 59.60% - - -147.51% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 247.51% 100.00% -147.51% - - - 0.40 59.60% - - -147.51% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 216.91% 100.00% -116.91% - - - 0.46 53.90% - - -116.91% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 111.38% 100.00% -11.38% - - - 0.90 10.22% - - -11.38% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 1554.26% 100.00% -1454.26% - - - 0.06 93.57% - - -1454.26% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 169.47% 100.00% -69.47% - - - 0.59 40.99% - - -69.47% - 0.00%
NYLON BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 2.45% 100.00% 97.55% - - - 40.89 -3989.44% - - 97.55% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 248.91 -24791.00% - - 99.60% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPERMEABILIZANTE FASTYL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 122.32% 100.00% -22.32% - - - 0.82 18.24% - - -22.32% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 182.04% 100.00% -82.04% - - - 0.55 45.07% - - -82.04% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 285.07% 100.00% -185.07% - - - 0.35 64.92% - - -185.07% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 124.55% 100.00% -24.55% - - - 0.80 19.71% - - -24.55% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 70.76% 100.00% 29.24% - - - 1.41 -41.33% - - 29.24% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 98.54% 100.00% 1.46% - - - 1.01 -1.48% - - 1.46% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.46% 100.00% -27.46% - - - 0.78 21.54% - - -27.46% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 842.97 -84197.00% - - 99.88% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 65.51% 100.00% 34.49% - - - 1.53 -52.65% - - 34.49% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 65.51% 100.00% 34.49% - - - 1.53 -52.65% - - 34.49% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 76.80% 100.00% 23.20% - - - 1.30 -30.21% - - 23.20% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 111.58% 100.00% -11.58% - - - 0.90 10.38% - - -11.58% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 3284.07% 100.00% -3184.07% - - - 0.03 96.96% - - -3184.07% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 141.75% 100.00% -41.75% - - - 0.71 29.45% - - -41.75% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 138.24% 100.00% -38.24% - - - 0.72 27.66% - - -38.24% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 106.96% 100.00% -6.96% - - - 0.93 6.51% - - -6.96% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 73.82% 100.00% 26.18% - - - 1.35 -35.47% - - 26.18% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 287.01% 100.00% -187.01% - - - 0.35 65.16% - - -187.01% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 267.12% 100.00% -167.12% - - - 0.37 62.56% - - -167.12% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 183.54% 100.00% -83.54% - - - 0.54 45.52% - - -83.54% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 890.14% 100.00% -790.14% - - - 0.11 88.77% - - -790.14% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 100.00% 61.13% - - - 2.57 -157.29% - - 61.13% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 38.87% 100.00% 61.13% - - - 2.57 -157.29% - - 61.13% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 73.74% 100.00% 26.26% - - - 1.36 -35.61% - - 26.26% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 91.92% 100.00% 8.08% - - - 1.09 -8.79% - - 8.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 91.92% 100.00% 8.08% - - - 1.09 -8.79% - - 8.08% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 56.88% 100.00% 43.12% - - - 1.76 -75.81% - - 43.12% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 504480.00% 100.00% -504380.00% - - - 0.00 99.98% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 208.66% 100.00% -108.66% - - - 0.48 52.07% - - -108.66% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 139.23% 100.00% -39.23% - - - 0.72 28.18% - - -39.23% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 119.77% 100.00% -19.77% - - - 0.83 16.51% - - -19.77% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 64.43% 100.00% 35.57% - - - 1.55 -55.20% - - 35.57% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 292.11% 100.00% -192.11% - - - 0.34 65.77% - - -192.11% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 220.72% 100.00% -120.72% - - - 0.45 54.69% - - -120.72% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 337.18% 100.00% -237.18% - - - 0.30 70.34% - - -237.18% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 0.00% 100.00% 100.00% - - - 16308.96 -1630796.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RECARGO POR SUSPENSIÓN DE OBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 64.45% 86.12% 21.67% - - - 1.34 -33.63% - - 25.17% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 102.76% 88.00% -14.76% - - - 0.86 14.36% - - -16.77% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 105.40% 88.00% -17.40% - - - 0.83 16.51% - - -19.78% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 14.51% 88.00% 73.49% - - - 6.07 -506.52% - - 83.51% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA DE AISLAR SCOTCH
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 21.29% 84.00% 62.71% - - - 3.95 -294.56% - - 74.66% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 730.94% 84.00% -646.94% - - - 0.11 88.51% - - -770.16% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 66.80% 0.00% -66.80% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 98.53% 0.00% -98.53% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 94.54% 0.00% -94.54% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 157.19% 0.00% -157.19% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 157.19% 0.00% -157.19% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 157.19% 0.00% -157.19% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 190.10% 0.00% -190.10% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 190.10% 0.00% -190.10% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 190.10% 0.00% -190.10% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 102.54% 0.00% -102.54% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 119.57% 0.00% -119.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 119.57% 0.00% -119.57% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGATEC PLUS ADHESIVO PARA CERAMICA GRIS DE 20KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGATEC SISATEC SISA NEGRO DE 10 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO GR 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA GRIS 20X66
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 70.48% 0.00% -70.48% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 70.48% 0.00% -70.48% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 70.48% 0.00% -70.48% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.92% 0.00% -1.92% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 5.54% 0.00% -5.54% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 1.43% 0.00% -1.43% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 68.89% 0.00% -68.89% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 68.89% 0.00% -68.89% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 68.89% 0.00% -68.89% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 68.89% 0.00% -68.89% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 33
- - - - - - 1.30% 1.25% 84.13% 68.25% -15.88% - - - 0.81 18.87% - - -23.26% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 62.55% 15.07% -47.48% - - - 0.24 75.91% - - -315.06% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 72.82% 100.00% 27.18% - - - 1.37 -37.33% - - 27.18% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 72.82% 100.00% 27.18% - - - 1.37 -37.33% - - 27.18% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 72.82% 100.00% 27.18% - - - 1.37 -37.33% - - 27.18% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 36.00% 100.00% 64.00% - - - 2.78 -177.80% - - 64.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 36.00% 100.00% 64.00% - - - 2.78 -177.80% - - 64.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 36.00% 100.00% 64.00% - - - 2.78 -177.80% - - 64.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9423.16 -942216.00% - - 99.99% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 493.16 -49216.00% - - 99.80% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 493.16 -49216.00% - - 99.80% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 493.16 -49216.00% - - 99.80% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 493.16 -49216.00% - - 99.80% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 104.16% 0.00% -104.16% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 94.54% 0.00% -94.54% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 77.76% 0.00% -77.76% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 81.63% 0.00% -81.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 81.63% 0.00% -81.63% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGATEC PLUS ADHESIVO PARA CERAMICA GRIS DE 20KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGATEC SISATEC SISA NEGRO DE 10 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO GR 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA GRIS 20X66
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 70.48% 0.00% -70.48% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 70.48% 0.00% -70.48% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 70.48% 0.00% -70.48% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.92% 0.00% -1.92% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 5.54% 0.00% -5.54% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 1.43% 0.00% -1.43% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 68.57% 0.00% -68.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 68.57% 0.00% -68.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 68.57% 0.00% -68.57% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 68.57% 0.00% -68.57% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 85.63% 0.00% -85.63% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7025.06 -702406.00% - - 99.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7025.06 -702406.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7025.06 -702406.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7025.06 -702406.00% - - 99.99% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 106.83% 100.00% -6.83% - - - 0.94 6.39% - - -6.83% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 126.71% 100.00% -26.71% - - - 0.79 21.08% - - -26.71% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 153.50% 100.00% -53.50% - - - 0.65 34.86% - - -53.50% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 1771.37% 100.00% -1671.37% - - - 0.06 94.35% - - -1671.37% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 262.29% 100.00% -162.29% - - - 0.38 61.87% - - -162.29% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 450.53% 100.00% -350.53% - - - 0.22 77.80% - - -350.53% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 208.66% 100.00% -108.66% - - - 0.48 52.07% - - -108.66% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 171.15% 100.00% -71.15% - - - 0.58 41.57% - - -71.15% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 139.23% 100.00% -39.23% - - - 0.72 28.18% - - -39.23% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 119.77% 100.00% -19.77% - - - 0.83 16.51% - - -19.77% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 64.43% 100.00% 35.57% - - - 1.55 -55.20% - - 35.57% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 292.11% 100.00% -192.11% - - - 0.34 65.77% - - -192.11% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 220.72% 100.00% -120.72% - - - 0.45 54.69% - - -120.72% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 337.18% 100.00% -237.18% - - - 0.30 70.34% - - -237.18% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 100.43% 100.00% -0.43% - - - 1.00 0.43% - - -0.43% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 100.43% 100.00% -0.43% - - - 1.00 0.43% - - -0.43% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 120.83% 100.00% -20.83% - - - 0.83 17.24% - - -20.83% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 182.45% 100.00% -82.45% - - - 0.55 45.19% - - -82.45% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 285.07% 100.00% -185.07% - - - 0.35 64.92% - - -185.07% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 125.51% 100.00% -25.51% - - - 0.80 20.32% - - -25.51% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 70.76% 100.00% 29.24% - - - 1.41 -41.33% - - 29.24% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 100.34% 100.00% -0.34% - - - 1.00 0.34% - - -0.34% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.44% 100.00% -27.44% - - - 0.78 21.53% - - -27.44% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 842.97 -84197.00% - - 99.88% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 61.64% 100.00% 38.36% - - - 1.62 -62.22% - - 38.36% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 61.64% 100.00% 38.36% - - - 1.62 -62.22% - - 38.36% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 114.49% 100.00% -14.49% - - - 0.87 12.65% - - -14.49% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 147.61% 100.00% -47.61% - - - 0.68 32.25% - - -47.61% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 147.61% 100.00% -47.61% - - - 0.68 32.25% - - -47.61% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 60.85% 100.00% 39.15% - - - 1.64 -64.34% - - 39.15% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 525.95% 100.00% -425.95% - - - 0.19 80.99% - - -425.95% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 525.95% 100.00% -425.95% - - - 0.19 80.99% - - -425.95% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 219.23% 100.00% -119.23% - - - 0.46 54.39% - - -119.23% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 98.19% 100.00% 1.81% - - - 1.02 -1.84% - - 1.81% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 5223.04% 100.00% -5123.04% - - - 0.02 98.09% - - -5123.04% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 183.27% 100.00% -83.27% - - - 0.55 45.44% - - -83.27% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 12.29% 100.00% 87.71% - - - 8.14 -713.91% - - 87.71% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.36% 100.00% 28.64% - - - 1.40 -40.13% - - 28.64% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 433.72% 100.00% -333.72% - - - 0.23 76.94% - - -333.72% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 80.14% 100.00% 19.86% - - - 1.25 -24.79% - - 19.86% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 112.06% 100.00% -12.06% - - - 0.89 10.76% - - -12.06% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 204381.82% 100.00% -204281.82% - - - 0.00 99.95% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 133.90% 100.00% -33.90% - - - 0.75 25.32% - - -33.90% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 106.96% 100.00% -6.96% - - - 0.93 6.51% - - -6.96% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.18% 100.00% 28.82% - - - 1.40 -40.49% - - 28.82% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 338.69% 100.00% -238.69% - - - 0.30 70.47% - - -238.69% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 267.12% 100.00% -167.12% - - - 0.37 62.56% - - -167.12% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 144.61% 100.00% -44.61% - - - 0.69 30.85% - - -44.61% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 890.14% 100.00% -790.14% - - - 0.11 88.77% - - -790.14% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 125.28% 100.00% -25.28% - - - 0.80 20.18% - - -25.28% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 12.18 -1118.00% - - 91.79% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 45.75% 100.00% 54.25% - - - 2.19 -118.59% - - 54.25% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 45.75% 100.00% 54.25% - - - 2.19 -118.59% - - 54.25% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 64.94% 86.12% 21.18% - - - 1.33 -32.62% - - 24.60% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 102.66% 88.00% -14.66% - - - 0.86 14.28% - - -16.66% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 105.40% 88.00% -17.40% - - - 0.83 16.51% - - -19.78% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 11.27% 88.00% 76.73% - - - 7.81 -680.73% - - 87.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA DE AISLAR SCOTCH
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 22.44% 84.00% 61.56% - - - 3.74 -274.40% - - 73.29% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 730.94% 84.00% -646.94% - - - 0.11 88.51% - - -770.16% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 1.18% 84.00% 82.82% - - - 71.12 -7012.01% - - 98.59% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
CASA # 8
- - - - - - 1.30% 1.25% 116.49% 98.87% -17.62% - - - 0.85 15.13% - - -17.82% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 161.69% 100.00% -61.69% - - - 0.62 38.15% - - -61.69% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 726.76% 100.00% -626.76% - - - 0.14 86.24% - - -626.76% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 689.42% 100.00% -589.42% - - - 0.15 85.50% - - -589.42% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 689.42% 100.00% -589.42% - - - 0.15 85.50% - - -589.42% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA DE MICROFIBRA 20U SURTIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
THINNER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPONJA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 340.74% 100.00% -240.74% - - - 0.29 70.65% - - -240.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 231.39% 100.00% -131.39% - - - 0.43 56.78% - - -131.39% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 231.39% 100.00% -131.39% - - - 0.43 56.78% - - -131.39% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 195.39% 100.00% -95.39% - - - 0.51 48.82% - - -95.39% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICONE SISTA 280ML BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MINI FELPAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA MOUNTAIN FULL WEATHER CUBETA MATE COLOR BLANCO DE LINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA PROCOAT CUBETA MATE COLOR BLANCO DE LINEA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE EXTRA WHITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE DEEP
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 306.58% 100.00% -206.58% - - - 0.33 67.38% - - -206.58% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 254.34% 100.00% -154.34% - - - 0.39 60.68% - - -154.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA BLANCO EXTRA FINO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #220 H-98 O A-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #150 H-98 O C-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 100 P/AGUA BASE DE LONA 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 2-1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 290.55% 100.00% -190.55% - - - 0.34 65.58% - - -190.55% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 289.41% 100.00% -189.41% - - - 0.35 65.45% - - -189.41% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 194.88% 100.00% -94.88% - - - 0.51 48.69% - - -94.88% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 194.88% 100.00% -94.88% - - - 0.51 48.69% - - -94.88% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICONE SISTA 280ML BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 149.29% 100.00% -49.29% - - - 0.67 33.01% - - -49.29% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 194.99% 100.00% -94.99% - - - 0.51 48.71% - - -94.99% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 174.72% 100.00% -74.72% - - - 0.57 42.77% - - -74.72% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 174.72% 100.00% -74.72% - - - 0.57 42.77% - - -74.72% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 125.01% 100.00% -25.01% - - - 0.80 20.00% - - -25.01% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 124.41% 100.00% -24.41% - - - 0.80 19.62% - - -24.41% - 0.00%
ESTUQUE ARENA SIN ARENA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGATEC PLUS ADHESIVO PARA CERAMICA GRIS DE 20KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 475.62 -47462.00% - - 99.79% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 446.44 -44544.00% - - 99.78% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1950.66 -194966.00% - - 99.95% - 0.00%
PISO CERAMICO ANDORRA ACERO 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO GR 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA PLOMO 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA GRIS 20X66
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA AVELLANA MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 80.57% 100.00% 19.43% - - - 1.24 -24.12% - - 19.43% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICONE SISTA 280ML BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICONE SISTA 280ML NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 43.74% 100.00% 56.26% - - - 2.29 -128.63% - - 56.26% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 117.00% 100.00% -17.00% - - - 0.85 14.53% - - -17.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 83.19% 100.00% 16.81% - - - 1.20 -20.21% - - 16.81% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 193.01% 100.00% -93.01% - - - 0.52 48.19% - - -93.01% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 254.95% 100.00% -154.95% - - - 0.39 60.78% - - -154.95% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 406.92% 100.00% -306.92% - - - 0.25 75.43% - - -306.92% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2326.71 -232571.00% - - 99.96% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 100.00% 100.00% - - - 1539.00 -153800.00% - - 99.94% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE ARENA SIN ARENA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA AVELLANA MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 4.80% 100.00% 95.20% - - - 20.84 -1984.16% - - 95.20% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 4.80% 100.00% 95.20% - - - 20.84 -1984.16% - - 95.20% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 106.81% 100.00% -6.81% - - - 0.94 6.37% - - -6.81% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 130.52% 100.00% -30.52% - - - 0.77 23.38% - - -30.52% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 163.69% 100.00% -63.69% - - - 0.61 38.91% - - -63.69% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 163.69% 100.00% -63.69% - - - 0.61 38.91% - - -63.69% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 76.93% 100.00% 23.07% - - - 1.30 -29.99% - - 23.07% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 8297.36% 100.00% -8197.36% - - - 0.01 98.79% - - -8197.36% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 680.64% 100.00% -580.64% - - - 0.15 85.31% - - -580.64% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 680.64% 100.00% -580.64% - - - 0.15 85.31% - - -580.64% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 261.45% 100.00% -161.45% - - - 0.38 61.75% - - -161.45% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 211.46% 100.00% -111.46% - - - 0.47 52.71% - - -111.46% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 2090.53% 100.00% -1990.53% - - - 0.05 95.22% - - -1990.53% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 79.35% 100.00% 20.65% - - - 1.26 -26.03% - - 20.65% - 0.00%
LIJA P/AGUA #220 H-98 O A-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #150 H-98 O C-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 100 P/AGUA BASE DE LONA 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 4.08% 100.00% 95.92% - - - 24.51 -2350.99% - - 95.92% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 248.91 -24791.00% - - 99.60% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 341.79% 100.00% -241.79% - - - 0.29 70.74% - - -241.79% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 119.10% 100.00% -19.10% - - - 0.84 16.04% - - -19.10% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 176.67% 100.00% -76.67% - - - 0.57 43.40% - - -76.67% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 284.21% 100.00% -184.21% - - - 0.35 64.82% - - -184.21% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 106.23% 100.00% -6.23% - - - 0.94 5.87% - - -6.23% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 63.88% 100.00% 36.12% - - - 1.57 -56.56% - - 36.12% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 98.38% 100.00% 1.62% - - - 1.02 -1.64% - - 1.62% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 81.65% 100.00% 18.35% - - - 1.22 -22.48% - - 18.35% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.54% 100.00% 62.46% - - - 2.66 -166.39% - - 62.46% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 64.48% 100.00% 35.52% - - - 1.55 -55.09% - - 35.52% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 64.48% 100.00% 35.52% - - - 1.55 -55.09% - - 35.52% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 117.32% 100.00% -17.32% - - - 0.85 14.76% - - -17.32% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 143.21% 100.00% -43.21% - - - 0.70 30.17% - - -43.21% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 422.75% 100.00% -322.75% - - - 0.24 76.35% - - -322.75% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 148.69% 100.00% -48.69% - - - 0.67 32.74% - - -48.69% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 111.45% 100.00% -11.45% - - - 0.90 10.28% - - -11.45% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 141.88% 100.00% -41.88% - - - 0.70 29.52% - - -41.88% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 26.53% 100.00% 73.47% - - - 3.77 -276.87% - - 73.47% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 143.03% 100.00% -43.03% - - - 0.70 30.09% - - -43.03% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 187.77% 100.00% -87.77% - - - 0.53 46.74% - - -87.77% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL DE 2 1/2"X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA FINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO TABLAYESO DE 7 X 7/16" ROSCA FINA PUNTA CORRIENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 91.70% 100.00% 8.30% - - - 1.09 -9.05% - - 8.30% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 91.70% 100.00% 8.30% - - - 1.09 -9.05% - - 8.30% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 76.48% 100.00% 23.52% - - - 1.31 -30.75% - - 23.52% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 102.47% 100.00% -2.47% - - - 0.98 2.41% - - -2.47% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6157.64% 100.00% -6057.64% - - - 0.02 98.38% - - -6057.64% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 233.98% 100.00% -133.98% - - - 0.43 57.26% - - -133.98% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 126.01% 100.00% -26.01% - - - 0.79 20.64% - - -26.01% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 89.15% 100.00% 10.85% - - - 1.12 -12.17% - - 10.85% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.44% 100.00% 27.56% - - - 1.38 -38.05% - - 27.56% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 236.29% 100.00% -136.29% - - - 0.42 57.68% - - -136.29% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 211.59% 100.00% -111.59% - - - 0.47 52.74% - - -111.59% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 354.24% 100.00% -254.24% - - - 0.28 71.77% - - -254.24% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 183.82% 100.00% -83.82% - - - 0.54 45.60% - - -83.82% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 895.69% 100.00% -795.69% - - - 0.11 88.84% - - -795.69% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 96.26% 100.00% 3.74% - - - 1.04 -3.89% - - 3.74% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 76.13% 100.00% 23.87% - - - 1.31 -31.35% - - 23.87% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 48.97% 100.00% 51.03% - - - 2.04 -104.19% - - 51.03% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 48.97% 100.00% 51.03% - - - 2.04 -104.19% - - 51.03% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 45.18% 100.00% 54.82% - - - 2.21 -121.36% - - 54.82% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 54.69% 93.64% 38.95% - - - 1.71 -71.23% - - 41.60% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.13% 88.00% -12.13% - - - 0.88 12.12% - - -13.79% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 88.00% -15.14% - - - 0.85 14.68% - - -17.20% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 3.49% 100.00% 96.51% - - - 28.64 -2764.38% - - 96.51% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 100.00% 93.42% - - - 15.20 -1420.37% - - 93.42% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 3.40% 100.00% 96.60% - - - 29.42 -2842.42% - - 96.60% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
CASA # 6
- - - - - - 1.30% 1.25% 111.98% 98.52% -13.46% - - - 0.88 12.02% - - -13.66% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 126.71% 100.00% -26.71% - - - 0.79 21.08% - - -26.71% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 156.97% 100.00% -56.97% - - - 0.64 36.29% - - -56.97% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 201.76% 100.00% -101.76% - - - 0.50 50.44% - - -101.76% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 5365.37% 100.00% -5265.37% - - - 0.02 98.14% - - -5265.37% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 293.70% 100.00% -193.70% - - - 0.34 65.95% - - -193.70% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 237.88% 100.00% -137.88% - - - 0.42 57.96% - - -137.88% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 61.55% 100.00% 38.45% - - - 1.62 -62.47% - - 38.45% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 54.61% 100.00% 45.39% - - - 1.83 -83.13% - - 45.39% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 16.11% 100.00% 83.89% - - - 6.21 -520.79% - - 83.89% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 143.03% 100.00% -43.03% - - - 0.70 30.09% - - -43.03% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 187.77% 100.00% -87.77% - - - 0.53 46.74% - - -87.77% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL DE 2 1/2"X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA FINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO TABLAYESO DE 7 X 7/16" ROSCA FINA PUNTA CORRIENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 105.61% 100.00% -5.61% - - - 0.95 5.31% - - -5.61% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 105.61% 100.00% -5.61% - - - 0.95 5.31% - - -5.61% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 65.57% 100.00% 34.43% - - - 1.53 -52.51% - - 34.43% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RECARGO POR SUSPENSIÓN DE OBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 151.43% 100.00% -51.43% - - - 0.66 33.96% - - -51.43% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 231.64% 100.00% -131.64% - - - 0.43 56.83% - - -131.64% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 404.64% 100.00% -304.64% - - - 0.25 75.29% - - -304.64% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 161.95% 100.00% -61.95% - - - 0.62 38.25% - - -61.95% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 107.20% 100.00% -7.20% - - - 0.93 6.71% - - -7.20% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 56.78% 100.00% 43.22% - - - 1.76 -76.12% - - 43.22% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 100.12% 100.00% -0.12% - - - 1.00 0.12% - - -0.12% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 82.94% 100.00% 17.06% - - - 1.21 -20.57% - - 17.06% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.54% 100.00% 62.46% - - - 2.66 -166.39% - - 62.46% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 73.78% 100.00% 26.22% - - - 1.36 -35.53% - - 26.22% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 73.78% 100.00% 26.22% - - - 1.36 -35.53% - - 26.22% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 108.09% 100.00% -8.09% - - - 0.93 7.48% - - -8.09% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 150.65% 100.00% -50.65% - - - 0.66 33.62% - - -50.65% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 201.08% 100.00% -101.08% - - - 0.50 50.27% - - -101.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 201.08% 100.00% -101.08% - - - 0.50 50.27% - - -101.08% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 68.78% 100.00% 31.22% - - - 1.45 -45.38% - - 31.22% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 281.60% 100.00% -181.60% - - - 0.36 64.49% - - -181.60% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 112.24% 100.00% -12.24% - - - 0.89 10.90% - - -12.24% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 6163.04% 100.00% -6063.04% - - - 0.02 98.38% - - -6063.04% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 67.19% 100.00% 32.81% - - - 1.49 -48.84% - - 32.81% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 9"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 61.88% 100.00% 38.12% - - - 1.62 -61.61% - - 38.12% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 61.88% 100.00% 38.12% - - - 1.62 -61.61% - - 38.12% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 46.97% 100.00% 53.03% - - - 2.13 -112.90% - - 53.03% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 8.92% 100.00% 91.08% - - - 11.21 -1020.71% - - 91.08% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1523.76% 100.00% -1423.76% - - - 0.07 93.44% - - -1423.76% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 1417.87% 100.00% -1317.87% - - - 0.07 92.95% - - -1317.87% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 546.63% 100.00% -446.63% - - - 0.18 81.71% - - -446.63% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 34.91% 100.00% 65.09% - - - 2.86 -186.42% - - 65.09% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 75.84% 100.00% 24.16% - - - 1.32 -31.86% - - 24.16% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 106.23% 100.00% -6.23% - - - 0.94 5.86% - - -6.23% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6157.64% 100.00% -6057.64% - - - 0.02 98.38% - - -6057.64% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 306.28% 100.00% -206.28% - - - 0.33 67.35% - - -206.28% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 124.37% 100.00% -24.37% - - - 0.80 19.59% - - -24.37% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 89.15% 100.00% 10.85% - - - 1.12 -12.17% - - 10.85% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 69.51% 100.00% 30.49% - - - 1.44 -43.87% - - 30.49% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 236.23% 100.00% -136.23% - - - 0.42 57.67% - - -136.23% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 211.59% 100.00% -111.59% - - - 0.47 52.74% - - -111.59% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 353.84% 100.00% -253.84% - - - 0.28 71.74% - - -253.84% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 183.78% 100.00% -83.78% - - - 0.54 45.59% - - -83.78% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 839.13% 100.00% -739.13% - - - 0.12 88.08% - - -739.13% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 102.41% 100.00% -2.41% - - - 0.98 2.36% - - -2.41% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 43.08% 100.00% 56.92% - - - 2.32 -132.15% - - 56.92% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 43.08% 100.00% 56.92% - - - 2.32 -132.15% - - 56.92% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 119.37% 98.98% -20.39% - - - 0.83 17.08% - - -20.60% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 201.47% 100.00% -101.47% - - - 0.50 50.36% - - -101.47% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 200.54% 100.00% -100.54% - - - 0.50 50.13% - - -100.54% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 106.00% 100.00% -6.00% - - - 0.94 5.66% - - -6.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 106.00% 100.00% -6.00% - - - 0.94 5.66% - - -6.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN SPRAY
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 174.38% 100.00% -74.38% - - - 0.57 42.65% - - -74.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 196.47% 100.00% -96.47% - - - 0.51 49.10% - - -96.47% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 176.20% 100.00% -76.20% - - - 0.57 43.25% - - -76.20% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 176.20% 100.00% -76.20% - - - 0.57 43.25% - - -76.20% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 162.64% 100.00% -62.64% - - - 0.61 38.51% - - -62.64% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 162.64% 100.00% -62.64% - - - 0.61 38.51% - - -62.64% - 0.00%
PEGATEC PLUS ADHESIVO PARA CERAMICA GRIS DE 20KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 475.62 -47462.00% - - 99.79% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 446.44 -44544.00% - - 99.78% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 100.00% 67.70% - - - 3.10 -209.63% - - 67.70% - 0.00%
PISO CERAMICO ANDORRA ACERO 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO GR 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA PLOMO 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA GRIS 20X66
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 124.98% 100.00% -24.98% - - - 0.80 19.99% - - -24.98% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 85.75% 100.00% 14.25% - - - 1.17 -16.62% - - 14.25% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 85.75% 100.00% 14.25% - - - 1.17 -16.62% - - 14.25% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 49.75% 100.00% 50.25% - - - 2.01 -100.99% - - 50.25% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE EXTRA WHITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE DEEP
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 121.57% 100.00% -21.57% - - - 0.82 17.74% - - -21.57% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 100.00% -21.57% - - - 0.82 17.74% - - -21.57% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 113.06% 100.00% -13.06% - - - 0.88 11.55% - - -13.06% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 113.06% 100.00% -13.06% - - - 0.88 11.55% - - -13.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 113.06% 100.00% -13.06% - - - 0.88 11.55% - - -13.06% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 111.60% 100.00% -11.60% - - - 0.90 10.39% - - -11.60% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 23.17% 100.00% 76.83% - - - 4.32 -331.57% - - 76.83% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 66.77% 100.00% 33.23% - - - 1.50 -49.78% - - 33.23% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 62.66% 100.00% 37.34% - - - 1.60 -59.59% - - 37.34% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 354.38 -35338.00% - - 99.72% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 500.50 -49950.00% - - 99.80% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 506.24 -50524.00% - - 99.80% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 100.00% 3.30% - - - 1.03 -3.41% - - 3.30% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 100.00% 100.00% - - - 1539.00 -153800.00% - - 99.94% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 183.57% 0.00% -183.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 183.57% 0.00% -183.57% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 183.57% 0.00% -183.57% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 57.91% 93.64% 35.73% - - - 1.62 -61.71% - - 38.16% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.66% 88.00% -12.66% - - - 0.87 12.57% - - -14.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.68% 88.00% -15.68% - - - 0.85 15.12% - - -17.81% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 9.75% 100.00% 90.25% - - - 10.26 -925.59% - - 90.25% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 9.85% 100.00% 90.15% - - - 10.16 -915.68% - - 90.15% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 100.00% 93.42% - - - 15.20 -1420.37% - - 93.42% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 7
- - - - - - 1.30% 1.25% 105.31% 98.87% -6.44% - - - 0.94 6.11% - - -6.51% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 136.88% 100.00% -36.88% - - - 0.73 26.94% - - -36.88% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 368.98% 100.00% -268.98% - - - 0.27 72.90% - - -268.98% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 355.18% 100.00% -255.18% - - - 0.28 71.85% - - -255.18% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 355.18% 100.00% -255.18% - - - 0.28 71.85% - - -255.18% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 276.59% 100.00% -176.59% - - - 0.36 63.84% - - -176.59% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 275.34% 100.00% -175.34% - - - 0.36 63.68% - - -175.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 180.81% 100.00% -80.81% - - - 0.55 44.69% - - -80.81% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 180.81% 100.00% -80.81% - - - 0.55 44.69% - - -80.81% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #220 H-98 O A-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 100 P/AGUA BASE DE LONA 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 201.03% 100.00% -101.03% - - - 0.50 50.26% - - -101.03% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 159.52% 100.00% -59.52% - - - 0.63 37.31% - - -59.52% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 159.52% 100.00% -59.52% - - - 0.63 37.31% - - -59.52% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 123.52% 100.00% -23.52% - - - 0.81 19.04% - - -23.52% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FELPA SIN RODILLO DE FIBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MINI FELPAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE EXTRA WHITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE DEEP
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 149.05% 100.00% -49.05% - - - 0.67 32.91% - - -49.05% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 146.10% 100.00% -46.10% - - - 0.68 31.55% - - -46.10% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #220 H-98 O A-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 127.69% 100.00% -27.69% - - - 0.78 21.68% - - -27.69% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 199.29% 100.00% -99.29% - - - 0.50 49.82% - - -99.29% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 176.20% 100.00% -76.20% - - - 0.57 43.25% - - -76.20% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 176.20% 100.00% -76.20% - - - 0.57 43.25% - - -76.20% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 89.65% 100.00% 10.35% - - - 1.12 -11.55% - - 10.35% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 89.65% 100.00% 10.35% - - - 1.12 -11.55% - - 10.35% - 0.00%
PEGATEC PLUS ADHESIVO PARA CERAMICA GRIS DE 20KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 475.62 -47462.00% - - 99.79% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 446.44 -44544.00% - - 99.78% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1950.66 -194966.00% - - 99.95% - 0.00%
PISO CERAMICO ANDORRA ACERO 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO GR 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA PLOMO 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA GRIS 20X66
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 105.57% 100.00% -5.57% - - - 0.95 5.28% - - -5.57% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 82.01% 100.00% 17.99% - - - 1.22 -21.94% - - 17.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISTOLA PARA CALAFATEO SENCILLA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICONE SISTA 280ML BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICONE SISTA 280ML NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 48.56% 100.00% 51.44% - - - 2.06 -105.91% - - 51.44% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 30.30% 100.00% 69.70% - - - 3.30 -230.08% - - 69.70% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 87.29% 100.00% 12.71% - - - 1.15 -14.56% - - 12.71% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 83.19% 100.00% 16.81% - - - 1.20 -20.21% - - 16.81% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 193.01% 100.00% -93.01% - - - 0.52 48.19% - - -93.01% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 254.95% 100.00% -154.95% - - - 0.39 60.78% - - -154.95% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 406.92% 100.00% -306.92% - - - 0.25 75.43% - - -306.92% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2326.71 -232571.00% - - 99.96% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 100.00% 100.00% - - - 1539.00 -153800.00% - - 99.94% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 101.38% 100.00% -1.38% - - - 0.99 1.36% - - -1.38% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 116.87% 100.00% -16.87% - - - 0.86 14.43% - - -16.87% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 130.89% 100.00% -30.89% - - - 0.76 23.60% - - -30.89% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 422.75% 100.00% -322.75% - - - 0.24 76.35% - - -322.75% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 148.83% 100.00% -48.83% - - - 0.67 32.81% - - -48.83% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 99.17% 100.00% 0.83% - - - 1.01 -0.84% - - 0.83% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 120.06% 100.00% -20.06% - - - 0.83 16.71% - - -20.06% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 26.53% 100.00% 73.47% - - - 3.77 -276.87% - - 73.47% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 143.03% 100.00% -43.03% - - - 0.70 30.09% - - -43.03% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 187.77% 100.00% -87.77% - - - 0.53 46.74% - - -87.77% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL DE 2 1/2"X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA FINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO TABLAYESO DE 7 X 7/16" ROSCA FINA PUNTA CORRIENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 105.33% 100.00% -5.33% - - - 0.95 5.06% - - -5.33% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 105.33% 100.00% -5.33% - - - 0.95 5.06% - - -5.33% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 67.29% 100.00% 32.71% - - - 1.49 -48.60% - - 32.71% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 111.40% 100.00% -11.40% - - - 0.90 10.23% - - -11.40% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 161.69% 100.00% -61.69% - - - 0.62 38.15% - - -61.69% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 146080.90% 100.00% -145980.90% - - - 0.00 99.93% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 152173.91% 100.00% -152073.91% - - - 0.00 99.93% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 956.64% 100.00% -856.64% - - - 0.10 89.55% - - -856.64% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 59865.06% 100.00% -59765.06% - - - 0.00 99.83% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 195.31% 100.00% -95.31% - - - 0.51 48.80% - - -95.31% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 107.74% 100.00% -7.74% - - - 0.93 7.19% - - -7.74% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 63.88% 100.00% 36.12% - - - 1.57 -56.56% - - 36.12% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 100.17% 100.00% -0.17% - - - 1.00 0.17% - - -0.17% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 83.03% 100.00% 16.97% - - - 1.20 -20.44% - - 16.97% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.54% 100.00% 62.46% - - - 2.66 -166.39% - - 62.46% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 64.48% 100.00% 35.52% - - - 1.55 -55.09% - - 35.52% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 64.48% 100.00% 35.52% - - - 1.55 -55.09% - - 35.52% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 106.13% 100.00% -6.13% - - - 0.94 5.77% - - -6.13% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 108.59% 100.00% -8.59% - - - 0.92 7.91% - - -8.59% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 4525.83% 100.00% -4425.83% - - - 0.02 97.79% - - -4425.83% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 711.58% 100.00% -611.58% - - - 0.14 85.95% - - -611.58% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 711.58% 100.00% -611.58% - - - 0.14 85.95% - - -611.58% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 346.28% 100.00% -246.28% - - - 0.29 71.12% - - -246.28% - 0.00%
MONOCAPA BLANCO EXTRA FINO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 241.98% 100.00% -141.98% - - - 0.41 58.67% - - -141.98% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 3655.84% 100.00% -3555.84% - - - 0.03 97.26% - - -3555.84% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 192.02% 100.00% -92.02% - - - 0.52 47.92% - - -92.02% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 53.55% 100.00% 46.45% - - - 1.87 -86.74% - - 46.45% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 35.68% 100.00% 64.32% - - - 2.80 -180.24% - - 64.32% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1980.90% 100.00% -1880.90% - - - 0.05 94.95% - - -1880.90% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 512.68% 100.00% -412.68% - - - 0.20 80.49% - - -412.68% - 0.00%
CLAVO DE LAMINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 546.63% 100.00% -446.63% - - - 0.18 81.71% - - -446.63% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.38% 100.00% 62.62% - - - 2.68 -167.52% - - 62.62% - 0.00%
LIJA P/AGUA #220 H-98 O A-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #150 H-98 O C-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 105.19% 100.00% -5.19% - - - 0.95 4.93% - - -5.19% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 105.19% 100.00% -5.19% - - - 0.95 4.93% - - -5.19% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 81.79% 100.00% 18.21% - - - 1.22 -22.26% - - 18.21% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 106.26% 100.00% -6.26% - - - 0.94 5.89% - - -6.26% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6157.64% 100.00% -6057.64% - - - 0.02 98.38% - - -6057.64% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 306.28% 100.00% -206.28% - - - 0.33 67.35% - - -206.28% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 126.09% 100.00% -26.09% - - - 0.79 20.69% - - -26.09% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 89.15% 100.00% 10.85% - - - 1.12 -12.17% - - 10.85% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.37% 100.00% 27.63% - - - 1.38 -38.18% - - 27.63% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 236.29% 100.00% -136.29% - - - 0.42 57.68% - - -136.29% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 211.59% 100.00% -111.59% - - - 0.47 52.74% - - -111.59% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 354.24% 100.00% -254.24% - - - 0.28 71.77% - - -254.24% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 183.84% 100.00% -83.84% - - - 0.54 45.60% - - -83.84% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 903.31% 100.00% -803.31% - - - 0.11 88.93% - - -803.31% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 101.47% 100.00% -1.47% - - - 0.99 1.45% - - -1.47% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 56.32% 100.00% 43.68% - - - 1.78 -77.55% - - 43.68% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 56.32% 100.00% 43.68% - - - 1.78 -77.55% - - 43.68% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 45.88% 100.00% 54.12% - - - 2.18 -117.95% - - 54.12% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 54.51% 93.64% 39.13% - - - 1.72 -71.79% - - 41.79% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.19% 88.00% -12.19% - - - 0.88 12.17% - - -13.86% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 88.00% -15.14% - - - 0.85 14.68% - - -17.20% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 2.06% 88.00% 85.94% - - - 42.65 -4165.01% - - 97.66% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 3.04% 100.00% 96.96% - - - 32.89 -3189.37% - - 96.96% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 100.00% 93.42% - - - 15.20 -1420.37% - - 93.42% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 2.93% 100.00% 97.07% - - - 34.08 -3308.34% - - 97.07% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
CASA # 15
- - - - - - 1.30% 1.27% 104.80% 98.89% -5.91% - - - 0.94 5.64% - - -5.98% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.45% 133.36% 100.00% -33.36% - - - 0.75 25.02% - - -33.36% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 486.35% 100.00% -386.35% - - - 0.21 79.44% - - -386.35% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 454.50% 100.00% -354.50% - - - 0.22 78.00% - - -354.50% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 454.50% 100.00% -354.50% - - - 0.22 78.00% - - -354.50% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA DE MICROFIBRA 20U SURTIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 274.34% 100.00% -174.34% - - - 0.36 63.55% - - -174.34% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 273.16% 100.00% -173.16% - - - 0.37 63.39% - - -173.16% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 178.63% 100.00% -78.63% - - - 0.56 44.02% - - -78.63% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 178.63% 100.00% -78.63% - - - 0.56 44.02% - - -78.63% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 245.35% 100.00% -145.35% - - - 0.41 59.24% - - -145.35% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 146.27% 100.00% -46.27% - - - 0.68 31.64% - - -46.27% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 146.27% 100.00% -46.27% - - - 0.68 31.64% - - -46.27% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 110.28% 100.00% -10.28% - - - 0.91 9.32% - - -10.28% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MINI FELPAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA LATEX BLANCO TRADICIONAL INTERIOR E EXTERIOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLOR BLANCO LATEX PLUS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE EXTRA WHITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE DEEP
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 219.56% 100.00% -119.56% - - - 0.46 54.45% - - -119.56% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 207.28% 100.00% -107.28% - - - 0.48 51.76% - - -107.28% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 100 P/AGUA BASE DE LONA 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 240 P/AGUA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 400 P/AGUA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SELLADOR ACRILICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO 4'X8'X 1/2" INT GYPCEN
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 122.45% 100.00% -22.45% - - - 0.82 18.33% - - -22.45% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 102.33% 100.00% -2.33% - - - 0.98 2.27% - - -2.33% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 102.33% 100.00% -2.33% - - - 0.98 2.27% - - -2.33% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 102.33% 100.00% -2.33% - - - 0.98 2.27% - - -2.33% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CARPINTERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASADOR CORREDIZO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 81.09% 100.00% 18.91% - - - 1.23 -23.31% - - 18.91% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.04% 65.31% 100.00% 34.69% - - - 1.53 -53.12% - - 34.69% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.03% 89.94% 100.00% 10.06% - - - 1.11 -11.19% - - 10.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.03% 89.94% 100.00% 10.06% - - - 1.11 -11.19% - - 10.06% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.03% 89.94% 100.00% 10.06% - - - 1.11 -11.19% - - 10.06% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.01% 10.52% 100.00% 89.48% - - - 9.50 -850.12% - - 89.48% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.01% 10.52% 100.00% 89.48% - - - 9.50 -850.12% - - 89.48% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.01% 17.14% 100.00% 82.86% - - - 5.83 -483.50% - - 82.86% - 0.00%
WIPE
- - - - - - 0.00% 0.01% 3.91% 100.00% 96.09% - - - 25.56 -2456.25% - - 96.09% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 51.38% 100.00% 48.62% - - - 1.95 -94.64% - - 48.62% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 116.32% 100.00% -16.32% - - - 0.86 14.03% - - -16.32% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 77.65% 100.00% 22.35% - - - 1.29 -28.79% - - 22.35% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 77.65% 100.00% 22.35% - - - 1.29 -28.79% - - 22.35% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 16.88% 100.00% 83.12% - - - 5.93 -492.58% - - 83.12% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 16.88% 100.00% 83.12% - - - 5.93 -492.58% - - 83.12% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.37% 100.00% -3.37% - - - 0.97 3.26% - - -3.37% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1950.66 -194966.00% - - 99.95% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 45.65% 100.00% 54.35% - - - 2.19 -119.05% - - 54.35% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 131.54% 100.00% -31.54% - - - 0.76 23.98% - - -31.54% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 127.43% 100.00% -27.43% - - - 0.78 21.53% - - -27.43% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 193.01% 100.00% -93.01% - - - 0.52 48.19% - - -93.01% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 110.09% 100.00% -10.09% - - - 0.91 9.17% - - -10.09% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 286.43% 100.00% -186.43% - - - 0.35 65.09% - - -186.43% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 136.03% 100.00% -36.03% - - - 0.74 26.49% - - -36.03% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 70.18% 100.00% 29.82% - - - 1.42 -42.50% - - 29.82% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 101.45% 100.00% -1.45% - - - 0.99 1.43% - - -1.45% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 117.64% 100.00% -17.64% - - - 0.85 14.99% - - -17.64% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 143.74% 100.00% -43.74% - - - 0.70 30.43% - - -43.74% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 331071.11% 100.00% -330971.11% - - - 0.00 99.97% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 7507.51% 100.00% -7407.51% - - - 0.01 98.67% - - -7407.51% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 325.04% 100.00% -225.04% - - - 0.31 69.23% - - -225.04% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEDAZO METALICO 1/16"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 142.08% 100.00% -42.08% - - - 0.70 29.62% - - -42.08% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 130.99% 100.00% -30.99% - - - 0.76 23.66% - - -30.99% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 54.89% 100.00% 45.11% - - - 1.82 -82.17% - - 45.11% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 254.51% 100.00% -154.51% - - - 0.39 60.71% - - -154.51% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 218.91% 100.00% -118.91% - - - 0.46 54.32% - - -118.91% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 327.47% 100.00% -227.47% - - - 0.31 69.46% - - -227.47% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 134.53% 100.00% -34.53% - - - 0.74 25.66% - - -34.53% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL DE 2 1/2"X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA FINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO TABLAYESO DE 7 X 7/16" ROSCA FINA PUNTA CORRIENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE GALVANIZADO CALIBRE 10
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 91.79% 100.00% 8.21% - - - 1.09 -8.94% - - 8.21% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 91.79% 100.00% 8.21% - - - 1.09 -8.94% - - 8.21% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 109.67% 100.00% -9.67% - - - 0.91 8.82% - - -9.67% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 171.73% 100.00% -71.73% - - - 0.58 41.77% - - -71.73% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 787303.64% 100.00% -787203.64% - - - 0.00 99.99% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 13364.35% 100.00% -13264.35% - - - 0.01 99.25% - - 0.00% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 11107.72% 100.00% -11007.72% - - - 0.01 99.10% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 484.17% 100.00% -384.17% - - - 0.21 79.35% - - -384.17% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
VARILLA ROSCADA DE 1/4 X 3.MTS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 159.86% 100.00% -59.86% - - - 0.63 37.45% - - -59.86% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 100.97% 100.00% -0.97% - - - 0.99 0.96% - - -0.97% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 85.27% 100.00% 14.73% - - - 1.17 -17.28% - - 14.73% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 140.59% 100.00% -40.59% - - - 0.71 28.87% - - -40.59% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 93.15% 100.00% 6.85% - - - 1.07 -7.35% - - 6.85% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.53% 100.00% 27.47% - - - 1.38 -37.87% - - 27.47% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 234.86% 100.00% -134.86% - - - 0.43 57.42% - - -134.86% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 211.59% 100.00% -111.59% - - - 0.47 52.74% - - -111.59% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 707.97% 100.00% -607.97% - - - 0.14 85.88% - - -607.97% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 214.98% 100.00% -114.98% - - - 0.47 53.48% - - -114.98% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1026.64% 100.00% -926.64% - - - 0.10 90.26% - - -926.64% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 40.81% 100.00% 59.19% - - - 2.45 -145.02% - - 59.19% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 40.81% 100.00% 59.19% - - - 2.45 -145.02% - - 59.19% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 90.14% 100.00% 9.86% - - - 1.11 -10.94% - - 9.86% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 116.30% 100.00% -16.30% - - - 0.86 14.01% - - -16.30% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 116.30% 100.00% -16.30% - - - 0.86 14.01% - - -16.30% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 47.77% 100.00% 52.23% - - - 2.09 -109.32% - - 52.23% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2365.39% 100.00% -2265.39% - - - 0.04 95.77% - - -2265.39% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 214.09% 100.00% -114.09% - - - 0.47 53.29% - - -114.09% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 169.79% 100.00% -69.79% - - - 0.59 41.10% - - -69.79% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 2201.29% 100.00% -2101.29% - - - 0.05 95.46% - - -2101.29% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 153.15% 100.00% -53.15% - - - 0.65 34.70% - - -53.15% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 153.15% 100.00% -53.15% - - - 0.65 34.70% - - -53.15% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 54.64% 100.00% 45.36% - - - 1.83 -83.01% - - 45.36% - 0.00%
LIJA P/AGUA #150 H-98 O C-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 5.30% 100.00% 94.70% - - - 18.86 -1785.94% - - 94.70% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 19.24% 100.00% 80.76% - - - 5.20 -419.65% - - 80.76% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 145.53% 100.00% -45.53% - - - 0.69 31.29% - - -45.53% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 62.96% 100.00% 37.04% - - - 1.59 -58.83% - - 37.04% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 82.43% 100.00% 17.57% - - - 1.21 -21.31% - - 17.57% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 82.43% 100.00% 17.57% - - - 1.21 -21.31% - - 17.57% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 52.09% 100.00% 47.91% - - - 1.92 -91.97% - - 47.91% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 116.06% 100.00% -16.06% - - - 0.86 13.84% - - -16.06% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 48.63% 100.00% 51.37% - - - 2.06 -105.63% - - 51.37% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 86.32% 100.00% 13.68% - - - 1.16 -15.85% - - 13.68% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 125.80% 100.00% -25.80% - - - 0.79 20.51% - - -25.80% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.59% 100.00% 62.41% - - - 2.66 -166.06% - - 62.41% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 55.79% 93.64% 37.85% - - - 1.68 -67.84% - - 40.42% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.19% 88.00% -12.19% - - - 0.88 12.17% - - -13.86% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 88.00% -15.14% - - - 0.85 14.68% - - -17.20% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 2.06% 88.00% 85.94% - - - 42.63 -4163.09% - - 97.65% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 5.77% 100.00% 94.23% - - - 17.32 -1632.01% - - 94.23% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 100.00% 93.42% - - - 15.20 -1420.37% - - 93.42% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 5.75% 100.00% 94.25% - - - 17.39 -1639.27% - - 94.25% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
CASA # 14
- - - - - - 1.30% 1.25% 103.59% 98.87% -4.72% - - - 0.95 4.56% - - -4.78% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 130.04% 100.00% -30.04% - - - 0.77 23.10% - - -30.04% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 602.54% 100.00% -502.54% - - - 0.17 83.40% - - -502.54% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 536.96% 100.00% -436.96% - - - 0.19 81.38% - - -436.96% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 536.96% 100.00% -436.96% - - - 0.19 81.38% - - -436.96% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 252.04% 100.00% -152.04% - - - 0.40 60.32% - - -152.04% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 159.52% 100.00% -59.52% - - - 0.63 37.31% - - -59.52% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 159.52% 100.00% -59.52% - - - 0.63 37.31% - - -59.52% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 123.52% 100.00% -23.52% - - - 0.81 19.04% - - -23.52% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA LATEX BLANCO TRADICIONAL INTERIOR E EXTERIOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLOR BLANCO LATEX PLUS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE EXTRA WHITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE DEEP
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 205.63% 100.00% -105.63% - - - 0.49 51.37% - - -105.63% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 202.96% 100.00% -102.96% - - - 0.49 50.73% - - -102.96% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 108.42% 100.00% -8.42% - - - 0.92 7.77% - - -8.42% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 108.42% 100.00% -8.42% - - - 0.92 7.77% - - -8.42% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 3/8 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 129.91% 100.00% -29.91% - - - 0.77 23.02% - - -29.91% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 128.07% 100.00% -28.07% - - - 0.78 21.92% - - -28.07% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 100.43% 100.00% -0.43% - - - 1.00 0.43% - - -0.43% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 100.43% 100.00% -0.43% - - - 1.00 0.43% - - -0.43% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 124.15% 100.00% -24.15% - - - 0.81 19.45% - - -24.15% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 100.00% -21.57% - - - 0.82 17.74% - - -21.57% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 115.87% 100.00% -15.87% - - - 0.86 13.70% - - -15.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 81.14% 100.00% 18.86% - - - 1.23 -23.25% - - 18.86% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 81.14% 100.00% 18.86% - - - 1.23 -23.25% - - 18.86% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 81.14% 100.00% 18.86% - - - 1.23 -23.25% - - 18.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 2''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 88.63% 100.00% 11.37% - - - 1.13 -12.83% - - 11.37% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 117.87% 100.00% -17.87% - - - 0.85 15.16% - - -17.87% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 87.44% 100.00% 12.56% - - - 1.14 -14.36% - - 12.56% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 87.44% 100.00% 12.56% - - - 1.14 -14.36% - - 12.56% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO CONTRAMARCO ENCHAPADO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 73.10% 100.00% 26.90% - - - 1.37 -36.80% - - 26.90% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 73.10% 100.00% 26.90% - - - 1.37 -36.80% - - 26.90% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 118.14% 100.00% -18.14% - - - 0.85 15.35% - - -18.14% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.15% 100.00% -3.15% - - - 0.97 3.06% - - -3.15% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 74.94% 100.00% 25.06% - - - 1.33 -33.43% - - 25.06% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 100.00% 67.70% - - - 3.10 -209.63% - - 67.70% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 80.35% 100.00% 19.65% - - - 1.24 -24.45% - - 19.65% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 45.65% 100.00% 54.35% - - - 2.19 -119.05% - - 54.35% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 131.54% 100.00% -31.54% - - - 0.76 23.98% - - -31.54% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 127.43% 100.00% -27.43% - - - 0.78 21.53% - - -27.43% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 99.89% 100.00% 0.11% - - - 1.00 -0.11% - - 0.11% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 80.72% 100.00% 19.28% - - - 1.24 -23.89% - - 19.28% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 148.15% 100.00% -48.15% - - - 0.67 32.50% - - -48.15% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 100.00% 3.30% - - - 1.03 -3.41% - - 3.30% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 42.88% 100.00% 57.12% - - - 2.33 -133.18% - - 57.12% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 101.26% 100.00% -1.26% - - - 0.99 1.25% - - -1.26% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 126.44% 100.00% -26.44% - - - 0.79 20.91% - - -26.44% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 163.43% 100.00% -63.43% - - - 0.61 38.81% - - -63.43% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 397484.44% 100.00% -397384.44% - - - 0.00 99.97% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 7005.79% 100.00% -6905.79% - - - 0.01 98.57% - - -6905.79% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 335.34% 100.00% -235.34% - - - 0.30 70.18% - - -235.34% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 319.78% 100.00% -219.78% - - - 0.31 68.73% - - -219.78% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 159.86% 100.00% -59.86% - - - 0.63 37.44% - - -59.86% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 138.35% 100.00% -38.35% - - - 0.72 27.72% - - -38.35% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 120.14% 100.00% -20.14% - - - 0.83 16.76% - - -20.14% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 58.13% 100.00% 41.87% - - - 1.72 -72.03% - - 41.87% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 254.51% 100.00% -154.51% - - - 0.39 60.71% - - -154.51% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 218.91% 100.00% -118.91% - - - 0.46 54.32% - - -118.91% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 327.47% 100.00% -227.47% - - - 0.31 69.46% - - -227.47% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL DE 2 1/2"X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA FINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO TABLAYESO DE 7 X 7/16" ROSCA FINA PUNTA CORRIENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 88.06% 100.00% 11.94% - - - 1.14 -13.56% - - 11.94% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 88.06% 100.00% 11.94% - - - 1.14 -13.56% - - 11.94% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 69.02% 100.00% 30.98% - - - 1.45 -44.89% - - 30.98% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 122.84% 100.00% -22.84% - - - 0.81 18.59% - - -22.84% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 145.45% 100.00% -45.45% - - - 0.69 31.25% - - -45.45% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 202.43% 100.00% -102.43% - - - 0.49 50.60% - - -102.43% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 202.43% 100.00% -102.43% - - - 0.49 50.60% - - -102.43% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 118.12% 100.00% -18.12% - - - 0.85 15.34% - - -18.12% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 60.93% 100.00% 39.07% - - - 1.64 -64.13% - - 39.07% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 87.59% 100.00% 12.41% - - - 1.14 -14.17% - - 12.41% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.26% 100.00% -27.26% - - - 0.79 21.42% - - -27.26% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.59% 100.00% 62.41% - - - 2.66 -166.06% - - 62.41% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 109.54% 100.00% -9.54% - - - 0.91 8.71% - - -9.54% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 109.54% 100.00% -9.54% - - - 0.91 8.71% - - -9.54% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 324.26% 100.00% -224.26% - - - 0.31 69.16% - - -224.26% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 91.23% 100.00% 8.77% - - - 1.10 -9.61% - - 8.77% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 119.46% 100.00% -19.46% - - - 0.84 16.29% - - -19.46% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 119.46% 100.00% -19.46% - - - 0.84 16.29% - - -19.46% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 45.47% 100.00% 54.53% - - - 2.20 -119.95% - - 54.53% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 9826.77% 100.00% -9726.77% - - - 0.01 98.98% - - -9726.77% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 6817.39% 100.00% -6717.39% - - - 0.01 98.53% - - -6717.39% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIURETANO MARCA DYMONIC 100
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 293.92% 100.00% -193.92% - - - 0.34 65.98% - - -193.92% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 293.92% 100.00% -193.92% - - - 0.34 65.98% - - -193.92% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 106.40% 100.00% -6.40% - - - 0.94 6.01% - - -6.40% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 85.67% 100.00% 14.33% - - - 1.17 -16.73% - - 14.33% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 1043.54% 100.00% -943.54% - - - 0.10 90.42% - - -943.54% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 84.83% 100.00% 15.17% - - - 1.18 -17.88% - - 15.17% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 100 P/AGUA BASE DE LONA 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 8.92% 100.00% 91.08% - - - 11.21 -1020.79% - - 91.08% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 35.70% 100.00% 64.30% - - - 2.80 -180.08% - - 64.30% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 80.75% 100.00% 19.25% - - - 1.24 -23.84% - - 19.25% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 113.12% 100.00% -13.12% - - - 0.88 11.60% - - -13.12% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 203363.64% 100.00% -203263.64% - - - 0.00 99.95% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 8201.97% 100.00% -8101.97% - - - 0.01 98.78% - - -8101.97% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 367.79% 100.00% -267.79% - - - 0.27 72.81% - - -267.79% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 130.56% 100.00% -30.56% - - - 0.77 23.41% - - -30.56% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 88.84% 100.00% 11.16% - - - 1.13 -12.56% - - 11.16% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.27% 100.00% 28.73% - - - 1.40 -40.32% - - 28.73% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 236.23% 100.00% -136.23% - - - 0.42 57.67% - - -136.23% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 211.59% 100.00% -111.59% - - - 0.47 52.74% - - -111.59% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 398.55% 100.00% -298.55% - - - 0.25 74.91% - - -298.55% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 183.62% 100.00% -83.62% - - - 0.54 45.54% - - -83.62% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1065.62% 100.00% -965.62% - - - 0.09 90.62% - - -965.62% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 97.82% 100.00% 2.18% - - - 1.02 -2.23% - - 2.18% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 56.87% 100.00% 43.13% - - - 1.76 -75.83% - - 43.13% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 45.84% 100.00% 54.16% - - - 2.18 -118.13% - - 54.16% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 45.84% 100.00% 54.16% - - - 2.18 -118.13% - - 54.16% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 45.88% 100.00% 54.12% - - - 2.18 -117.95% - - 54.12% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 58.46% 93.64% 35.18% - - - 1.60 -60.18% - - 37.57% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.92% 88.00% -12.92% - - - 0.87 12.80% - - -14.68% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.94% 88.00% -15.94% - - - 0.85 15.34% - - -18.12% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 10.63% 100.00% 89.37% - - - 9.41 -840.61% - - 89.37% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 10.75% 100.00% 89.25% - - - 9.30 -829.97% - - 89.25% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 100.00% 93.42% - - - 15.20 -1420.37% - - 93.42% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 13
- - - - - - 1.30% 1.25% 102.82% 98.87% -3.95% - - - 0.96 3.84% - - -4.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 127.47% 100.00% -27.47% - - - 0.78 21.55% - - -27.47% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 461.78% 100.00% -361.78% - - - 0.22 78.34% - - -361.78% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 461.78% 100.00% -361.78% - - - 0.22 78.34% - - -361.78% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 461.78% 100.00% -361.78% - - - 0.22 78.34% - - -361.78% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 206.59% 100.00% -106.59% - - - 0.48 51.59% - - -106.59% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 201.75% 100.00% -101.75% - - - 0.50 50.43% - - -101.75% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 107.21% 100.00% -7.21% - - - 0.93 6.73% - - -7.21% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 107.21% 100.00% -7.21% - - - 0.93 6.73% - - -7.21% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 193.19% 100.00% -93.19% - - - 0.52 48.24% - - -93.19% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 85.75% 100.00% 14.25% - - - 1.17 -16.62% - - 14.25% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 85.75% 100.00% 14.25% - - - 1.17 -16.62% - - 14.25% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 49.75% 100.00% 50.25% - - - 2.01 -100.99% - - 50.25% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA LATEX BLANCO TRADICIONAL INTERIOR E EXTERIOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLOR BLANCO LATEX PLUS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE EXTRA WHITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE DEEP
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 148.90% 100.00% -48.90% - - - 0.67 32.84% - - -48.90% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 189.89% 100.00% -89.89% - - - 0.53 47.34% - - -89.89% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 156.79% 100.00% -56.79% - - - 0.64 36.22% - - -56.79% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 156.79% 100.00% -56.79% - - - 0.64 36.22% - - -56.79% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO CONTRAMARCO ENCHAPADO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 127.12% 100.00% -27.12% - - - 0.79 21.34% - - -27.12% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 127.12% 100.00% -27.12% - - - 0.79 21.34% - - -27.12% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 118.14% 100.00% -18.14% - - - 0.85 15.35% - - -18.14% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.15% 100.00% -3.15% - - - 0.97 3.06% - - -3.15% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 159.52% 100.00% -59.52% - - - 0.63 37.31% - - -59.52% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 64.59% 100.00% 35.41% - - - 1.55 -54.81% - - 35.41% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 121.57% 100.00% -21.57% - - - 0.82 17.74% - - -21.57% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 100.00% -21.57% - - - 0.82 17.74% - - -21.57% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 100.43% 100.00% -0.43% - - - 1.00 0.43% - - -0.43% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 100.43% 100.00% -0.43% - - - 1.00 0.43% - - -0.43% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 100.43% 100.00% -0.43% - - - 1.00 0.43% - - -0.43% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 100.43% 100.00% -0.43% - - - 1.00 0.43% - - -0.43% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 81.14% 100.00% 18.86% - - - 1.23 -23.25% - - 18.86% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 81.14% 100.00% 18.86% - - - 1.23 -23.25% - - 18.86% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 81.14% 100.00% 18.86% - - - 1.23 -23.25% - - 18.86% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 81.14% 100.00% 18.86% - - - 1.23 -23.25% - - 18.86% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 45.65% 100.00% 54.35% - - - 2.19 -119.05% - - 54.35% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 131.54% 100.00% -31.54% - - - 0.76 23.98% - - -31.54% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 127.43% 100.00% -27.43% - - - 0.78 21.53% - - -27.43% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 99.89% 100.00% 0.11% - - - 1.00 -0.11% - - 0.11% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 80.72% 100.00% 19.28% - - - 1.24 -23.89% - - 19.28% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 148.15% 100.00% -48.15% - - - 0.67 32.50% - - -48.15% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 100.00% 3.30% - - - 1.03 -3.41% - - 3.30% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 42.88% 100.00% 57.12% - - - 2.33 -133.18% - - 57.12% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 103.21% 100.00% -3.21% - - - 0.97 3.11% - - -3.21% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 144.52% 100.00% -44.52% - - - 0.69 30.80% - - -44.52% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 192.67% 100.00% -92.67% - - - 0.52 48.10% - - -92.67% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 148325.84% 100.00% -148225.84% - - - 0.00 99.93% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 243478.26% 100.00% -243378.26% - - - 0.00 99.96% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 956.64% 100.00% -856.64% - - - 0.10 89.55% - - -856.64% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 59865.06% 100.00% -59765.06% - - - 0.00 99.83% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 253.99% 100.00% -153.99% - - - 0.39 60.63% - - -153.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 236.45% 100.00% -136.45% - - - 0.42 57.71% - - -136.45% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 117.66% 100.00% -17.66% - - - 0.85 15.01% - - -17.66% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 54.16% 100.00% 45.84% - - - 1.85 -84.64% - - 45.84% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 87.59% 100.00% 12.41% - - - 1.14 -14.17% - - 12.41% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.26% 100.00% -27.26% - - - 0.79 21.42% - - -27.26% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.59% 100.00% 62.41% - - - 2.66 -166.06% - - 62.41% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 103.64% 100.00% -3.64% - - - 0.96 3.51% - - -3.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 103.64% 100.00% -3.64% - - - 0.96 3.51% - - -3.64% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 108.09% 100.00% -8.09% - - - 0.93 7.48% - - -8.09% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 123.91% 100.00% -23.91% - - - 0.81 19.30% - - -23.91% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 148.41% 100.00% -48.41% - - - 0.67 32.62% - - -48.41% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 422.75% 100.00% -322.75% - - - 0.24 76.35% - - -322.75% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 335.34% 100.00% -235.34% - - - 0.30 70.18% - - -235.34% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 160.27% 100.00% -60.27% - - - 0.62 37.61% - - -60.27% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 132.02% 100.00% -32.02% - - - 0.76 24.25% - - -32.02% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 120.14% 100.00% -20.14% - - - 0.83 16.76% - - -20.14% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 54.89% 100.00% 45.11% - - - 1.82 -82.17% - - 45.11% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 254.51% 100.00% -154.51% - - - 0.39 60.71% - - -154.51% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 200.34% 100.00% -100.34% - - - 0.50 50.09% - - -100.34% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 327.47% 100.00% -227.47% - - - 0.31 69.46% - - -227.47% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL DE 2 1/2"X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA FINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO TABLAYESO DE 7 X 7/16" ROSCA FINA PUNTA CORRIENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 100.24% 100.00% -0.24% - - - 1.00 0.24% - - -0.24% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 100.24% 100.00% -0.24% - - - 1.00 0.24% - - -0.24% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 72.47% 100.00% 27.53% - - - 1.38 -37.99% - - 27.53% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 116.89% 100.00% -16.89% - - - 0.86 14.45% - - -16.89% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 158.17% 100.00% -58.17% - - - 0.63 36.78% - - -58.17% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 158.17% 100.00% -58.17% - - - 0.63 36.78% - - -58.17% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 49.81% 100.00% 50.19% - - - 2.01 -100.78% - - 50.19% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 9426.09% 100.00% -9326.09% - - - 0.01 98.94% - - -9326.09% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 6817.39% 100.00% -6717.39% - - - 0.01 98.53% - - -6717.39% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 139.70% 100.00% -39.70% - - - 0.72 28.42% - - -39.70% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 142.95% 100.00% -42.95% - - - 0.70 30.05% - - -42.95% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 71.88 -7088.00% - - 98.61% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 70.53% 100.00% 29.47% - - - 1.42 -41.78% - - 29.47% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA MADERA DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO RECTANGULAR DE ALUMINIO DE 1 3/4" X 3" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 58.79% 100.00% 41.21% - - - 1.70 -70.11% - - 41.21% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 58.79% 100.00% 41.21% - - - 1.70 -70.11% - - 41.21% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 20.93% 100.00% 79.07% - - - 4.78 -377.84% - - 79.07% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 14.28% 100.00% 85.72% - - - 7.00 -600.17% - - 85.72% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1949.42% 100.00% -1849.42% - - - 0.05 94.87% - - -1849.42% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPERMEABILIZANTE FASTYL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 62.09% 100.00% 37.91% - - - 1.61 -61.05% - - 37.91% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 78.13% 100.00% 21.87% - - - 1.28 -27.99% - - 21.87% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 639081.82% 100.00% -638981.82% - - - 0.00 99.98% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 8201.97% 100.00% -8101.97% - - - 0.01 98.78% - - -8101.97% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 4788.06% 100.00% -4688.06% - - - 0.02 97.91% - - -4688.06% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 232.38% 100.00% -132.38% - - - 0.43 56.97% - - -132.38% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 155.97% 100.00% -55.97% - - - 0.64 35.89% - - -55.97% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 88.84% 100.00% 11.16% - - - 1.13 -12.56% - - 11.16% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 76.26% 100.00% 23.74% - - - 1.31 -31.12% - - 23.74% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 577.11% 100.00% -477.11% - - - 0.17 82.67% - - -477.11% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 211.59% 100.00% -111.59% - - - 0.47 52.74% - - -111.59% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 487.17% 100.00% -387.17% - - - 0.21 79.47% - - -387.17% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 183.62% 100.00% -83.62% - - - 0.54 45.54% - - -83.62% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1051.57% 100.00% -951.57% - - - 0.10 90.49% - - -951.57% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 7.22% 100.00% 92.78% - - - 13.84 -1284.25% - - 92.78% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO DE 2" (80 PSI) PVC DRENAJE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 45.77% 100.00% 54.23% - - - 2.18 -118.50% - - 54.23% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 45.77% 100.00% 54.23% - - - 2.18 -118.50% - - 54.23% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 45.18% 100.00% 54.82% - - - 2.21 -121.36% - - 54.82% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 53.89% 93.64% 39.75% - - - 1.74 -73.77% - - 42.45% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.80% 88.00% -12.80% - - - 0.87 12.70% - - -14.55% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.83% 88.00% -15.83% - - - 0.85 15.24% - - -17.99% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 1.04% 100.00% 98.96% - - - 96.48 -9547.76% - - 98.96% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 100.00% 93.42% - - - 15.20 -1420.37% - - 93.42% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.87% 100.00% 99.13% - - - 114.90 -11390.49% - - 99.13% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
CASA # 12
- - - - - - 1.30% 1.25% 100.94% 98.87% -2.07% - - - 0.98 2.05% - - -2.09% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 122.92% 100.00% -22.92% - - - 0.81 18.65% - - -22.92% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 508.24% 100.00% -408.24% - - - 0.20 80.32% - - -408.24% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 467.84% 100.00% -367.84% - - - 0.21 78.62% - - -367.84% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 467.84% 100.00% -367.84% - - - 0.21 78.62% - - -367.84% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 208.51% 100.00% -108.51% - - - 0.48 52.04% - - -108.51% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 202.96% 100.00% -102.96% - - - 0.49 50.73% - - -102.96% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 108.42% 100.00% -8.42% - - - 0.92 7.77% - - -8.42% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 108.42% 100.00% -8.42% - - - 0.92 7.77% - - -8.42% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 176.57% 100.00% -76.57% - - - 0.57 43.37% - - -76.57% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 85.75% 100.00% 14.25% - - - 1.17 -16.62% - - 14.25% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 85.75% 100.00% 14.25% - - - 1.17 -16.62% - - 14.25% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 49.75% 100.00% 50.25% - - - 2.01 -100.99% - - 50.25% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA LATEX BLANCO TRADICIONAL INTERIOR E EXTERIOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLOR BLANCO LATEX PLUS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE EXTRA WHITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE DEEP
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 121.57% 100.00% -21.57% - - - 0.82 17.74% - - -21.57% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 100.00% -21.57% - - - 0.82 17.74% - - -21.57% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 119.09% 100.00% -19.09% - - - 0.84 16.03% - - -19.09% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 205.65% 100.00% -105.65% - - - 0.49 51.37% - - -105.65% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 164.24% 100.00% -64.24% - - - 0.61 39.11% - - -64.24% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 164.24% 100.00% -64.24% - - - 0.61 39.11% - - -64.24% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO CONTRAMARCO ENCHAPADO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 73.10% 100.00% 26.90% - - - 1.37 -36.80% - - 26.90% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 73.10% 100.00% 26.90% - - - 1.37 -36.80% - - 26.90% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 118.14% 100.00% -18.14% - - - 0.85 15.35% - - -18.14% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.15% 100.00% -3.15% - - - 0.97 3.06% - - -3.15% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 74.94% 100.00% 25.06% - - - 1.33 -33.43% - - 25.06% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 100.00% 67.70% - - - 3.10 -209.63% - - 67.70% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 100.43% 100.00% -0.43% - - - 1.00 0.43% - - -0.43% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 100.43% 100.00% -0.43% - - - 1.00 0.43% - - -0.43% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 100.43% 100.00% -0.43% - - - 1.00 0.43% - - -0.43% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 100.43% 100.00% -0.43% - - - 1.00 0.43% - - -0.43% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 83.13% 100.00% 16.87% - - - 1.20 -20.30% - - 16.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 81.14% 100.00% 18.86% - - - 1.23 -23.25% - - 18.86% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 81.14% 100.00% 18.86% - - - 1.23 -23.25% - - 18.86% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 81.14% 100.00% 18.86% - - - 1.23 -23.25% - - 18.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 45.65% 100.00% 54.35% - - - 2.19 -119.05% - - 54.35% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 131.54% 100.00% -31.54% - - - 0.76 23.98% - - -31.54% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 127.43% 100.00% -27.43% - - - 0.78 21.53% - - -27.43% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 99.89% 100.00% 0.11% - - - 1.00 -0.11% - - 0.11% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 80.72% 100.00% 19.28% - - - 1.24 -23.89% - - 19.28% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 148.15% 100.00% -48.15% - - - 0.67 32.50% - - -48.15% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 100.00% 3.30% - - - 1.03 -3.41% - - 3.30% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 42.88% 100.00% 57.12% - - - 2.33 -133.18% - - 57.12% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 100.16% 100.00% -0.16% - - - 1.00 0.16% - - -0.16% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 134.37% 100.00% -34.37% - - - 0.74 25.58% - - -34.37% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 177.17% 100.00% -77.17% - - - 0.56 43.56% - - -77.17% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 111483.15% 100.00% -111383.15% - - - 0.00 99.91% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 182608.70% 100.00% -182508.70% - - - 0.00 99.95% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 958.54% 100.00% -858.54% - - - 0.10 89.57% - - -858.54% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 59983.94% 100.00% -59883.94% - - - 0.00 99.83% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 219.98% 100.00% -119.98% - - - 0.45 54.54% - - -119.98% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 117.66% 100.00% -17.66% - - - 0.85 15.01% - - -17.66% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 54.16% 100.00% 45.84% - - - 1.85 -84.64% - - 45.84% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 87.59% 100.00% 12.41% - - - 1.14 -14.17% - - 12.41% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.26% 100.00% -27.26% - - - 0.79 21.42% - - -27.26% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 842.97 -84197.00% - - 99.88% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 98.66% 100.00% 1.34% - - - 1.01 -1.36% - - 1.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 98.66% 100.00% 1.34% - - - 1.01 -1.36% - - 1.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 108.09% 100.00% -8.09% - - - 0.93 7.48% - - -8.09% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 123.20% 100.00% -23.20% - - - 0.81 18.83% - - -23.20% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 149.16% 100.00% -49.16% - - - 0.67 32.96% - - -49.16% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2437.44% 100.00% -2337.44% - - - 0.04 95.90% - - -2337.44% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 422.75% 100.00% -322.75% - - - 0.24 76.35% - - -322.75% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 160.27% 100.00% -60.27% - - - 0.62 37.61% - - -60.27% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 132.02% 100.00% -32.02% - - - 0.76 24.25% - - -32.02% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 120.14% 100.00% -20.14% - - - 0.83 16.76% - - -20.14% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 54.89% 100.00% 45.11% - - - 1.82 -82.17% - - 45.11% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 254.51% 100.00% -154.51% - - - 0.39 60.71% - - -154.51% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 200.34% 100.00% -100.34% - - - 0.50 50.09% - - -100.34% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 327.47% 100.00% -227.47% - - - 0.31 69.46% - - -227.47% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL DE 2 1/2"X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA FINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO TABLAYESO DE 7 X 7/16" ROSCA FINA PUNTA CORRIENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 97.76% 100.00% 2.24% - - - 1.02 -2.29% - - 2.24% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 97.76% 100.00% 2.24% - - - 1.02 -2.29% - - 2.24% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 72.47% 100.00% 27.53% - - - 1.38 -37.99% - - 27.53% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 83.83% 100.00% 16.17% - - - 1.19 -19.29% - - 16.17% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 118.91% 100.00% -18.91% - - - 0.84 15.90% - - -18.91% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 123667.27% 100.00% -123567.27% - - - 0.00 99.92% - - 0.00% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 14359.61% 100.00% -14259.61% - - - 0.01 99.30% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 687.84% 100.00% -587.84% - - - 0.15 85.46% - - -587.84% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 233.98% 100.00% -133.98% - - - 0.43 57.26% - - -133.98% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 137.07% 100.00% -37.07% - - - 0.73 27.04% - - -37.07% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 88.84% 100.00% 11.16% - - - 1.13 -12.56% - - 11.16% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 74.40% 100.00% 25.60% - - - 1.34 -34.41% - - 25.60% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 292.14% 100.00% -192.14% - - - 0.34 65.77% - - -192.14% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 211.59% 100.00% -111.59% - - - 0.47 52.74% - - -111.59% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 398.55% 100.00% -298.55% - - - 0.25 74.91% - - -298.55% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 201.20% 100.00% -101.20% - - - 0.50 50.30% - - -101.20% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1184.61% 100.00% -1084.61% - - - 0.08 91.56% - - -1084.61% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 101.47% 100.00% -1.47% - - - 0.99 1.45% - - -1.47% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 45.84% 100.00% 54.16% - - - 2.18 -118.13% - - 54.16% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 45.84% 100.00% 54.16% - - - 2.18 -118.13% - - 54.16% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 45.88% 100.00% 54.12% - - - 2.18 -117.95% - - 54.12% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 81.07% 100.00% 18.93% - - - 1.23 -23.36% - - 18.93% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 93.68% 100.00% 6.32% - - - 1.07 -6.74% - - 6.32% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 15048.42% 100.00% -14948.42% - - - 0.01 99.34% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 6817.39% 100.00% -6717.39% - - - 0.01 98.53% - - -6717.39% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIURETANO MARCA DYMONIC 100
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 708.49% 100.00% -608.49% - - - 0.14 85.89% - - -608.49% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 708.49% 100.00% -608.49% - - - 0.14 85.89% - - -608.49% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 257.39% 100.00% -157.39% - - - 0.39 61.15% - - -157.39% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 188.19% 100.00% -88.19% - - - 0.53 46.86% - - -88.19% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 2616.83% 100.00% -2516.83% - - - 0.04 96.18% - - -2516.83% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 52.22% 100.00% 47.78% - - - 1.91 -91.49% - - 47.78% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
PLYWOOD FENOLICO DE 4'X8'X1/4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 36.77% 100.00% 63.23% - - - 2.72 -171.96% - - 63.23% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 14.28% 100.00% 85.72% - - - 7.00 -600.37% - - 85.72% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 512.68% 100.00% -412.68% - - - 0.20 80.49% - - -412.68% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 5.81% 100.00% 94.19% - - - 17.20 -1620.30% - - 94.19% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 73.84% 100.00% 26.16% - - - 1.35 -35.42% - - 26.16% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 73.84% 100.00% 26.16% - - - 1.35 -35.42% - - 26.16% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 60.30% 93.64% 33.34% - - - 1.55 -55.28% - - 35.60% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 102.14% 88.00% -14.14% - - - 0.86 13.85% - - -16.07% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 105.21% 88.00% -17.21% - - - 0.84 16.36% - - -19.56% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 13.17% 100.00% 86.83% - - - 7.59 -659.22% - - 86.83% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 13.46% 100.00% 86.54% - - - 7.43 -642.75% - - 86.54% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO DE 2" (80 PSI) PVC DRENAJE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 13.16% 100.00% 86.84% - - - 7.60 -659.73% - - 86.84% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
URBANIZACION
- - - - - - 18.50% 20.95% 94.36% 92.95% -1.41% - - - 0.99 1.49% - - -1.51% - 0.00%
URBANIZACION
- - - - - - 18.50% 20.95% 94.36% 92.95% -1.41% - - - 0.99 1.49% - - -1.51% - 0.00%
OBRA GRIS
- - - - - - 0.29% 0.28% 266.76% 100.00% -166.76% - - - 0.37 62.51% - - -166.76% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 300.24% 100.00% -200.24% - - - 0.33 66.69% - - -200.24% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.12% 0.11% 300.24% 100.00% -200.24% - - - 0.33 66.69% - - -200.24% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.11% 0.11% 198.72% 100.00% -98.72% - - - 0.50 49.68% - - -98.72% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2644.25 -264325.00% - - 99.96% - 0.00%
('MATERIALES',)
- - - - - - 0.17% 0.16% 248.21% 100.00% -148.21% - - - 0.40 59.71% - - -148.21% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 738.16% 100.00% -638.16% - - - 0.14 86.45% - - -638.16% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1205.00 -120400.00% - - 99.92% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 695.53% 100.00% -595.53% - - - 0.14 85.62% - - -595.53% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 423.16% 100.00% -323.16% - - - 0.24 76.37% - - -323.16% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 125.38% 100.00% -25.38% - - - 0.80 20.24% - - -25.38% - 0.00%
PARALES DE 4" X 4" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 141.53 -14053.00% - - 99.29% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 335.90% 100.00% -235.90% - - - 0.30 70.23% - - -235.90% - 0.00%
TABLA 1" X 12" X 8´
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.01% 0.01% 268.07% 100.00% -168.07% - - - 0.37 62.70% - - -168.07% - 0.00%
PARALES DE 3" X 3" X 7'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.02% 0.02% 367.09% 100.00% -267.09% - - - 0.27 72.76% - - -267.09% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.00% 0.00% 166.45% 100.00% -66.45% - - - 0.60 39.92% - - -66.45% - 0.00%
CAL
- - - - - - 0.00% 0.00% 60.14% 100.00% 39.86% - - - 1.66 -66.28% - - 39.86% - 0.00%
CEMENTO UGC
- - - - - - 0.01% 0.01% 452.66% 100.00% -352.66% - - - 0.22 77.91% - - -352.66% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 216.53% 100.00% -116.53% - - - 0.46 53.82% - - -116.53% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 170.38 -16938.00% - - 99.41% - 0.00%
ANTISOL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GEOTEXTIL NO TEJIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.06% 0.05% 123.76% 100.00% -23.76% - - - 0.81 19.20% - - -23.76% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 115.58% 100.00% -15.58% - - - 0.87 13.48% - - -15.58% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 166.84% 100.00% -66.84% - - - 0.60 40.06% - - -66.84% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.02% 0.02% 129.43% 100.00% -29.43% - - - 0.77 22.74% - - -29.43% - 0.00%
ELECTROMALLA 6X6 3/3
- - - - - - 0.00% 0.00% 68.10% 100.00% 31.90% - - - 1.47 -46.85% - - 31.90% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 17.19% 100.00% 82.81% - - - 5.82 -481.82% - - 82.81% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 51.67% 100.00% 48.33% - - - 1.94 -93.55% - - 48.33% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.01% 0.01% 92.55% 100.00% 7.45% - - - 1.08 -8.05% - - 7.45% - 0.00%
BLOCK DE 14X19X19.5 - 100KGS/CM2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 14X19X39 - 100 KGS/CM2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3001.35 -300035.00% - - 99.97% - 0.00%
BLOCK DE 9X19X39 - 66KG/CM2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK "U" DE 14X19X39 - 100KG/CM2
- - - - - - 0.00% 0.00% 80.55% 100.00% 19.45% - - - 1.24 -24.14% - - 19.45% - 0.00%
('CONCRETO',)
- - - - - - 0.06% 0.05% 27.91% 100.00% 72.09% - - - 3.58 -258.35% - - 72.09% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 10151.80 -1015080.00% - - 99.99% - 0.00%
CONCRETO FLUIDO 4001 M3
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2069.98 -206898.00% - - 99.95% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.01% 0.01% 103.35% 100.00% -3.35% - - - 0.97 3.24% - - -3.35% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 79.54 -7854.00% - - 98.74% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 79.54 -7854.00% - - 98.74% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA MADERA DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 9"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCA DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO DE CONCRETO PERFORADO DE 42"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 2-1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2316.83 -231583.00% - - 99.96% - 0.00%
IMPREVISTOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2316.83 -231583.00% - - 99.96% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 41.66% 100.00% 58.34% - - - 2.40 -140.06% - - 58.34% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 41.66% 100.00% 58.34% - - - 2.40 -140.06% - - 58.34% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 720.19 -71919.00% - - 99.86% - 0.00%
FLETES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 339.40 -33840.00% - - 99.71% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 339.40 -33840.00% - - 99.71% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 339.40 -33840.00% - - 99.71% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SEGUETA PARA SIERRA BANDA PORTÁTIL M-18 MILWAUKEE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PAVIMENTOS
- - - - - - 2.31% 2.23% 203.01% 100.00% -103.01% - - - 0.49 50.74% - - -103.01% - 0.00%
('SUBCONTRATOS',)
- - - - - - 1.16% 1.12% 204.67% 100.00% -104.67% - - - 0.49 51.14% - - -104.67% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 1.16% 1.12% 204.67% 100.00% -104.67% - - - 0.49 51.14% - - -104.67% - 0.00%
SUBCONTRATOS
- - - - - - 1.01% 0.97% 208.36% 100.00% -108.36% - - - 0.48 52.01% - - -108.36% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.14% 0.14% 180.68% 100.00% -80.68% - - - 0.55 44.65% - - -80.68% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.00% 157.81% 100.00% -57.81% - - - 0.63 36.63% - - -57.81% - 0.00%
('MATERIALES',)
- - - - - - 1.15% 1.11% 155.18% 100.00% -55.18% - - - 0.64 35.56% - - -55.18% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 120.18% 100.00% -20.18% - - - 0.83 16.79% - - -20.18% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 111.63% 100.00% -11.63% - - - 0.90 10.42% - - -11.63% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.64 -7964.00% - - 98.76% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 105.51% 100.00% -5.51% - - - 0.95 5.22% - - -5.51% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2199.34 -219834.00% - - 99.95% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.04% 0.04% 64.60% 100.00% 35.40% - - - 1.55 -54.79% - - 35.40% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 209.23 -20823.00% - - 99.52% - 0.00%
ANTISOL BLANCO
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11266.22 -1126522.00% - - 99.99% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 1.04% 1.00% 28.84% 100.00% 71.16% - - - 3.47 -246.75% - - 71.16% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 1.04% 1.00% 0.00% 100.00% 100.00% - - - 313866.40 -31386540.00% - - 100.00% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE ALISADO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE CORTE DE CISAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONMR600 MODULO DE ROTURA 600 TNM 1 1/2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COPLA PVC GRIS DE 2" ELECTRICIDAD
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN POLVO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COSTANERA LEGITIMA DE 5"X6MTS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCA DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 3/8 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CORTE DE SISA EN CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PREFABRICADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADOQUIN
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2175.00 -217400.00% - - 99.95% - 0.00%
SELECTO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2175.00 -217400.00% - - 99.95% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 0.00% 100.00% 100.00% - - - 19089.74 -1908874.00% - - 99.99% - 0.00%
IMPREVISTOS
- - - - - - 0.06% 0.06% 0.00% 100.00% 100.00% - - - 19089.74 -1908874.00% - - 99.99% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TIRALINEAS DE PLASTICO 30M TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('GASTOS DE ADMINISTRACION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SERVICIOS BASICOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AGUA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VIAJES DE SELECTO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PROVISION PRESTACIONES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BANQUETA PERIMETRAL Y DE SENDEROS
- - - - - - 0.90% 0.87% 135.91% 70.00% -65.91% - - - 0.52 48.49% - - -94.15% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.34% 0.33% 151.85% 70.00% -81.85% - - - 0.46 53.90% - - -116.93% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.34% 0.33% 151.85% 70.00% -81.85% - - - 0.46 53.90% - - -116.93% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 2706.98% 70.00% -2636.98% - - - 0.03 97.41% - - -3767.11% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.33% 0.32% 55.61% 70.00% 14.39% - - - 1.26 -25.87% - - 20.55% - 0.00%
('MATERIALES',)
- - - - - - 0.54% 0.52% 127.02% 70.00% -57.02% - - - 0.55 44.89% - - -81.46% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2293.94% 70.00% -2223.94% - - - 0.03 96.95% - - -3177.06% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 83.54 -8254.50% - - 98.80% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.21% 0.20% 129.23% 70.00% -59.23% - - - 0.54 45.83% - - -84.62% - 0.00%
CONMR600 MODULO DE ROTURA 600 TNM 1 1/2
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.21% 0.20% 122.90% 70.00% -52.90% - - - 0.57 43.04% - - -75.57% - 0.00%
('AGREGADOS',)
- - - - - - 0.14% 0.14% 129.19% 70.00% -59.19% - - - 0.54 45.81% - - -84.55% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.06% 0.06% 28.46% 70.00% 41.54% - - - 2.46 -145.92% - - 59.34% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SELECTO
- - - - - - 0.06% 0.06% 0.00% 70.00% 70.00% - - - 12425.00 -1242400.00% - - 99.99% - 0.00%
ARENA DE RIO
- - - - - - 0.03% 0.03% 323.35% 70.00% -253.35% - - - 0.22 78.35% - - -361.93% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 75.11% 70.00% -5.11% - - - 0.93 6.80% - - -7.30% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.01% 31.08% 70.00% 38.92% - - - 2.25 -125.23% - - 55.60% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.01% 0.01% 0.00% 70.00% 70.00% - - - 1454.27 -145327.10% - - 99.93% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.03% 0.02% 61.55% 70.00% 8.45% - - - 1.14 -13.72% - - 12.07% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 8.84% 70.00% 61.16% - - - 7.92 -691.92% - - 87.37% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.03% 0.03% 54.38% 70.00% 15.62% - - - 1.29 -28.73% - - 22.32% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.03% 0.03% 0.00% 70.00% 70.00% - - - 5979.83 -597883.40% - - 99.98% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 816.50 -81550.10% - - 99.88% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 816.50 -81550.10% - - 99.88% - 0.00%
('CONCRETO',)
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
THINNER
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 0.00% 70.00% 70.00% - - - 3553.10 -355210.20% - - 99.97% - 0.00%
IMPREVISTOS
- - - - - - 0.02% 0.02% 0.00% 70.00% 70.00% - - - 3553.10 -355210.20% - - 99.97% - 0.00%
('PREFABRICADOS',)
- - - - - - 0.10% 0.10% 0.00% 70.00% 70.00% - - - 20874.00 -2087300.00% - - 100.00% - 0.00%
BORDILLO PREFABRICADO MITAD TRAPEZOIDAL DE 15X30X50
- - - - - - 0.10% 0.10% 0.00% 70.00% 70.00% - - - 20874.00 -2087300.00% - - 100.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CARRETA DE MANO
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 70.00% 70.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.02% 0.02% 0.00% 70.00% 70.00% - - - 4845.75 -484475.00% - - 99.98% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.02% 0.02% 0.00% 70.00% 70.00% - - - 4845.75 -484475.00% - - 99.98% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.02% 0.02% 0.00% 70.00% 70.00% - - - 4845.75 -484475.00% - - 99.98% - 0.00%
MUROS DE CONTENCION
- - - - - - 1.79% 2.36% 129.69% 90.00% -39.69% - - - 0.69 30.60% - - -44.10% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.53% 0.54% 323.13% 90.00% -233.13% - - - 0.28 72.15% - - -259.03% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.53% 0.54% 323.13% 90.00% -233.13% - - - 0.28 72.15% - - -259.03% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.01% 7069.74% 90.00% -6979.74% - - - 0.01 98.73% - - -7755.27% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.53% 0.52% 195.98% 90.00% -105.98% - - - 0.46 54.08% - - -117.76% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.01% 37.74% 90.00% 52.26% - - - 2.38 -138.50% - - 58.07% - 0.00%
('MATERIALES',)
- - - - - - 1.22% 1.73% 72.98% 90.00% 17.02% - - - 1.23 -23.32% - - 18.91% - 0.00%
('MADERA',)
- - - - - - 0.02% 0.06% 181.12% 90.00% -91.12% - - - 0.50 50.31% - - -101.24% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.01% 249.78% 90.00% -159.78% - - - 0.36 63.97% - - -177.53% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.02% 0.03% 65.55% 90.00% 24.45% - - - 1.37 -37.30% - - 27.17% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.01% 24.38% 90.00% 65.62% - - - 3.69 -269.18% - - 72.91% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.01% 621.79% 90.00% -531.79% - - - 0.14 85.53% - - -590.88% - 0.00%
('CONCRETO',)
- - - - - - 0.30% 0.38% 109.60% 90.00% -19.60% - - - 0.82 17.88% - - -21.77% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.01% 469.99% 90.00% -379.99% - - - 0.19 80.85% - - -422.21% - 0.00%
SERVICIO DE BOMBEO CONVENCIONAL
- - - - - - 0.00% 0.01% 7.31% 90.00% 82.69% - - - 12.32 -1131.90% - - 91.88% - 0.00%
SERVICIO DE COLOCACION CON PLUMA
- - - - - - 0.00% 0.01% 7.31% 90.00% 82.69% - - - 12.32 -1131.90% - - 91.88% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.01% 20.90% 90.00% 69.10% - - - 4.31 -330.71% - - 76.78% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.01% 112.60% 90.00% -22.60% - - - 0.80 20.07% - - -25.12% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.01% 3098.69% 90.00% -3008.69% - - - 0.03 97.10% - - -3342.99% - 0.00%
SERVICIO DE COLOCACION COBRO MINIMO < 4M3
- - - - - - 0.00% 0.01% 112.60% 90.00% -22.60% - - - 0.80 20.07% - - -25.12% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.30% 0.30% 5.98% 90.00% 84.02% - - - 15.05 -1404.69% - - 93.35% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.15% 0.20% 102.50% 90.00% -12.50% - - - 0.88 12.19% - - -13.89% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.04% 0.05% 36.03% 90.00% 53.97% - - - 2.50 -149.77% - - 59.96% - 0.00%
CONMR600 MODULO DE ROTURA 600 TNM 1 1/2
- - - - - - 0.00% 0.01% 135.43% 90.00% -45.43% - - - 0.66 33.54% - - -50.47% - 0.00%
MONOCAPA GRIS
- - - - - - 0.02% 0.03% 0.00% 90.00% 90.00% - - - 9003.62 -900261.67% - - 99.99% - 0.00%
CAL
- - - - - - 0.00% 0.01% 1.17% 90.00% 88.83% - - - 76.91 -7590.78% - - 98.70% - 0.00%
CEMENTO UGC
- - - - - - 0.09% 0.10% 178.80% 90.00% -88.80% - - - 0.50 49.66% - - -98.66% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.31% 0.48% 94.19% 90.00% -4.19% - - - 0.96 4.45% - - -4.66% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.00% 0.01% 71.84% 90.00% 18.16% - - - 1.25 -25.27% - - 20.17% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.01% 1.04% 90.00% 88.96% - - - 86.53 -8552.67% - - 98.84% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.01% 2.93% 90.00% 87.07% - - - 30.77 -2976.50% - - 96.75% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.02% 0.03% 44.00% 90.00% 46.00% - - - 2.05 -104.55% - - 51.11% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.01% 86.16% 90.00% 3.84% - - - 1.04 -4.46% - - 4.27% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.01% 26.25% 90.00% 63.75% - - - 3.43 -242.92% - - 70.84% - 0.00%
ACERO DE 3/8 X 9 MT G60 LEG
- - - - - - 0.00% 0.01% 182.06% 90.00% -92.06% - - - 0.49 50.57% - - -102.29% - 0.00%
ACERO DE 1/2 X 9MT G60 LEG
- - - - - - 0.00% 0.01% 66.86% 90.00% 23.14% - - - 1.35 -34.62% - - 25.71% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.02% 0.03% 22.37% 90.00% 67.63% - - - 4.02 -302.40% - - 75.15% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.01% 786.93% 90.00% -696.93% - - - 0.11 88.56% - - -774.37% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.01% 154.22% 90.00% -64.22% - - - 0.58 41.64% - - -71.35% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.26% 0.26% 91.03% 90.00% -1.03% - - - 0.99 1.13% - - -1.14% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.01% 20.63% 90.00% 69.37% - - - 4.36 -336.35% - - 77.08% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.01% 23.64% 90.00% 66.36% - - - 3.81 -280.78% - - 73.74% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.01% 15.52% 90.00% 74.48% - - - 5.80 -480.02% - - 82.76% - 0.00%
CLAVO DE LAMINA
- - - - - - 0.00% 0.01% 0.86% 90.00% 89.14% - - - 104.09 -10309.22% - - 99.04% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.01% 365.72% 90.00% -275.72% - - - 0.25 75.39% - - -306.36% - 0.00%
('AGREGADOS',)
- - - - - - 0.03% 0.06% 75.07% 90.00% 14.93% - - - 1.20 -19.89% - - 16.59% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.02% 0.03% 7.27% 90.00% 82.73% - - - 12.37 -1137.31% - - 91.92% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.01% 173.54% 90.00% -83.54% - - - 0.52 48.14% - - -92.82% - 0.00%
ARENA DE RIO
- - - - - - 0.01% 0.02% 141.25% 90.00% -51.25% - - - 0.64 36.28% - - -56.94% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.06% 21.29% 90.00% 68.71% - - - 4.23 -322.78% - - 76.35% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.01% 29.02% 90.00% 60.98% - - - 3.10 -210.11% - - 67.75% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.01% 0.17% 90.00% 89.83% - - - 538.39 -53738.81% - - 99.81% - 0.00%
NYLON TRANSPARENTTE
- - - - - - 0.00% 0.01% 34.40% 90.00% 55.60% - - - 2.62 -161.66% - - 61.78% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.01% 2.60% 90.00% 87.40% - - - 34.65 -3364.78% - - 97.11% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.01% 59.44% 90.00% 30.56% - - - 1.51 -51.42% - - 33.96% - 0.00%
BROCAS PARA CONCRETO SDS 3/8 X 6"
- - - - - - 0.00% 0.01% 2.11% 90.00% 87.89% - - - 42.73 -4172.92% - - 97.66% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.01% 12.22% 90.00% 77.78% - - - 7.36 -636.40% - - 86.42% - 0.00%
TUBO DE 2" (80 PSI) PVC DRENAJE
- - - - - - 0.00% 0.01% 12.22% 90.00% 77.78% - - - 7.36 -636.40% - - 86.42% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.16% 0.17% 6.41% 90.00% 83.59% - - - 14.05 -1304.90% - - 92.88% - 0.00%
BLOCK "U" DE 14X19X39 - 100KG/CM2
- - - - - - 0.16% 0.16% 0.00% 90.00% 90.00% - - - 45842.19 -4584119.17% - - 100.00% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.01% 107.42% 90.00% -17.42% - - - 0.84 16.22% - - -19.35% - 0.00%
('ADITIVOS',)
- - - - - - 0.20% 0.24% 4.38% 90.00% 85.62% - - - 20.54 -1954.07% - - 95.13% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.01% 30.83% 90.00% 59.17% - - - 2.92 -191.90% - - 65.74% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.01% 19.50% 90.00% 70.50% - - - 4.61 -361.48% - - 78.33% - 0.00%
EMULSION ASFALTICA
- - - - - - 0.00% 0.01% 51.08% 90.00% 38.92% - - - 1.76 -76.20% - - 43.25% - 0.00%
SIKATOP SEAL 107, KIT 16.3 KG
- - - - - - 0.20% 0.21% 0.00% 90.00% 90.00% - - - 58569.36 -5856836.17% - - 100.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.01% 1.97% 90.00% 88.03% - - - 45.80 -4479.86% - - 97.82% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.01% 1.97% 90.00% 88.03% - - - 45.80 -4479.86% - - 97.82% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.01% 0.00% 90.00% 90.00% - - - 3336.09 -333509.17% - - 99.97% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.01% 0.00% 90.00% 90.00% - - - 3336.09 -333509.17% - - 99.97% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.05% 0.00% 90.00% 90.00% - - - 12938.73 -1293773.17% - - 99.99% - 0.00%
IMPREVISTOS
- - - - - - 0.04% 0.05% 0.00% 90.00% 90.00% - - - 12938.73 -1293773.17% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.03% 0.05% 60.41% 90.00% 29.59% - - - 1.49 -48.98% - - 32.88% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.03% 0.05% 60.41% 90.00% 29.59% - - - 1.49 -48.98% - - 32.88% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.03% 0.04% 0.00% 90.00% 90.00% - - - 11734.25 -1173325.27% - - 99.99% - 0.00%
VIAJES DE SELECTO
- - - - - - 0.00% 0.01% 304.24% 90.00% -214.24% - - - 0.30 70.42% - - -238.05% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.01% 37.15% 90.00% 52.85% - - - 2.42 -142.27% - - 58.72% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.01% 37.15% 90.00% 52.85% - - - 2.42 -142.27% - - 58.72% - 0.00%
ALQUILER DE MAQUINARIA
- - - - - - 0.00% 0.01% 37.15% 90.00% 52.85% - - - 2.42 -142.27% - - 58.72% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.02% 1.07% 90.00% 88.93% - - - 84.08 -8308.43% - - 98.81% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.01% 2.21% 90.00% 87.79% - - - 40.65 -3965.01% - - 97.54% - 0.00%
TIRALINEAS DE PLASTICO 30M TRUPER
- - - - - - 0.00% 0.01% 2.21% 90.00% 87.79% - - - 40.65 -3965.01% - - 97.54% - 0.00%
('EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.01% 0.00% 90.00% 90.00% - - - 3106.41 -310541.17% - - 99.97% - 0.00%
ANDAMIOS
- - - - - - 0.00% 0.01% 0.00% 90.00% 90.00% - - - 3106.41 -310541.17% - - 99.97% - 0.00%
INFRAESTRUCTURA ELECTRICA Y ESPECIALES
- - - - - - 1.25% 1.34% 119.90% 90.00% -29.90% - - - 0.75 24.94% - - -33.22% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 242.88% 90.00% -152.88% - - - 0.37 62.94% - - -169.86% - 0.00%
('MOVIMIENTO DE TIERRA',)
- - - - - - 0.00% 0.00% 242.88% 90.00% -152.88% - - - 0.37 62.94% - - -169.86% - 0.00%
EXTRACCION EXCAVACION
- - - - - - 0.00% 0.00% 242.88% 90.00% -152.88% - - - 0.37 62.94% - - -169.86% - 0.00%
('MATERIALES',)
- - - - - - 0.03% 0.15% 232.68% 90.00% -142.68% - - - 0.39 61.32% - - -158.54% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.03% 887.44% 90.00% -797.44% - - - 0.10 89.86% - - -886.05% - 0.00%
PEGAMENTO PVC GALON
- - - - - - 0.00% 0.00% 87.90% 90.00% 2.10% - - - 1.02 -2.38% - - 2.33% - 0.00%
ESPUMA EXPANSIVA SISTA 500 ML
- - - - - - 0.00% 0.00% 45.95% 90.00% 44.05% - - - 1.96 -95.85% - - 48.94% - 0.00%
TUBO DE 4" (250 PSI) PVC AP
- - - - - - 0.00% 0.00% 2982.67% 90.00% -2892.67% - - - 0.03 96.98% - - -3214.08% - 0.00%
TUBO DE 2" (80 PSI) PVC DRENAJE
- - - - - - 0.00% 0.00% 5.07% 90.00% 84.93% - - - 17.74 -1673.94% - - 94.36% - 0.00%
TUBO DE 4" (80 PSI) PVC DRENAJE
- - - - - - 0.00% 0.00% 193.89% 90.00% -103.89% - - - 0.46 53.58% - - -115.44% - 0.00%
CAJA TIPO H
- - - - - - 0.00% 0.00% 2845.14% 90.00% -2755.14% - - - 0.03 96.84% - - -3061.26% - 0.00%
CAJA TIPO VII PARA ESPECIALES
- - - - - - 0.00% 0.00% 929.87% 90.00% -839.87% - - - 0.10 90.32% - - -933.19% - 0.00%
TAPON HEMBRA DE 4" LISO PVC
- - - - - - 0.00% 0.00% 9.02% 90.00% 80.98% - - - 9.98 -897.65% - - 89.98% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.03% 152.07% 90.00% -62.07% - - - 0.59 40.82% - - -68.96% - 0.00%
TUBO PVC GRIS DE 2" X 3 MTS
- - - - - - 0.00% 0.00% 633.54% 90.00% -543.54% - - - 0.14 85.79% - - -603.94% - 0.00%
COPLA PVC GRIS DE 2" ELECTRICIDAD
- - - - - - 0.00% 0.00% 128.73% 90.00% -38.73% - - - 0.70 30.09% - - -43.03% - 0.00%
TUBO PVC GRIS DE 1" X 3 MTS
- - - - - - 0.00% 0.00% 195.24% 90.00% -105.24% - - - 0.46 53.90% - - -116.94% - 0.00%
VUELTA PVC GRIS DE 2"
- - - - - - 0.00% 0.00% 70.24% 90.00% 19.76% - - - 1.28 -28.14% - - 21.96% - 0.00%
COPLA PVC GRIS DE 1" ELECTRICIDAD
- - - - - - 0.00% 0.00% 23.65% 90.00% 66.35% - - - 3.81 -280.54% - - 73.72% - 0.00%
VUELTA PVC GRIS DE 1"
- - - - - - 0.00% 0.00% 0.40% 90.00% 89.60% - - - 222.33 -22133.42% - - 99.55% - 0.00%
MORDAZA
- - - - - - 0.00% 0.00% 12.66% 90.00% 77.34% - - - 7.11 -610.66% - - 85.93% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 52.89% 90.00% 37.11% - - - 1.70 -70.15% - - 41.23% - 0.00%
ALAMBRE GALVANIZADO CALIBRE 10
- - - - - - 0.00% 0.00% 52.89% 90.00% 37.11% - - - 1.70 -70.15% - - 41.23% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 46.32% 90.00% 43.68% - - - 1.94 -94.30% - - 48.53% - 0.00%
PIEDRIN DE 1 1/2"
- - - - - - 0.00% 0.00% 46.32% 90.00% 43.68% - - - 1.94 -94.30% - - 48.53% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.03% 6.09% 90.00% 83.91% - - - 14.79 -1378.78% - - 93.24% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.68% 90.00% 89.32% - - - 131.45 -13044.76% - - 99.24% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 2.87% 90.00% 87.13% - - - 31.40 -3040.31% - - 96.82% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 4.00% 90.00% 86.00% - - - 22.51 -2150.78% - - 95.56% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 24.33% 90.00% 65.67% - - - 3.70 -269.93% - - 72.97% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 12.18% 90.00% 77.82% - - - 7.39 -638.86% - - 86.47% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.76% 90.00% 89.24% - - - 118.62 -11762.34% - - 99.16% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.82% 90.00% 89.18% - - - 110.33 -10932.65% - - 99.09% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 3.06% 90.00% 86.94% - - - 29.45 -2845.38% - - 96.60% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.01% 2.07% 90.00% 87.93% - - - 43.55 -4255.43% - - 97.70% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 1.67% 90.00% 88.33% - - - 54.04 -5303.96% - - 98.15% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 2.47% 90.00% 87.53% - - - 36.48 -3547.67% - - 97.26% - 0.00%
('MATERIALES',)
- - - - - - 0.03% 0.04% 0.00% 90.00% 90.00% - - - 10201.27 -1020026.55% - - 99.99% - 0.00%
IMPREVISTOS
- - - - - - 0.03% 0.04% 0.00% 90.00% 90.00% - - - 10201.27 -1020026.55% - - 99.99% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 140.19% 90.00% -50.19% - - - 0.64 35.80% - - -55.77% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 140.19% 90.00% -50.19% - - - 0.64 35.80% - - -55.77% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 140.19% 90.00% -50.19% - - - 0.64 35.80% - - -55.77% - 0.00%
('SUBCONTRATOS',)
- - - - - - 1.21% 1.18% 105.35% 90.00% -15.35% - - - 0.85 14.57% - - -17.05% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 1.21% 1.18% 105.35% 90.00% -15.35% - - - 0.85 14.57% - - -17.05% - 0.00%
SUBCONTRATOS
- - - - - - 1.10% 1.07% 84.49% 90.00% 5.51% - - - 1.07 -6.52% - - 6.12% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.11% 0.11% 308.86% 90.00% -218.86% - - - 0.29 70.86% - - -243.18% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 101.39% 90.00% -11.39% - - - 0.89 11.24% - - -12.66% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 101.39% 90.00% -11.39% - - - 0.89 11.24% - - -12.66% - 0.00%
FLETES
- - - - - - 0.00% 0.00% 101.39% 90.00% -11.39% - - - 0.89 11.24% - - -12.66% - 0.00%
ACABADOS E INSTALACIONES
- - - - - - 0.99% 1.00% 69.13% 69.00% -0.13% - - - 1.00 0.19% - - -0.19% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.91% 0.88% 74.80% 69.00% -5.80% - - - 0.92 7.76% - - -8.41% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.91% 0.88% 74.80% 69.00% -5.80% - - - 0.92 7.76% - - -8.41% - 0.00%
SUBCONTRATOS
- - - - - - 0.86% 0.83% 78.22% 69.00% -9.22% - - - 0.88 11.79% - - -13.36% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.05% 0.04% 10.80% 69.00% 58.20% - - - 6.39 -538.88% - - 84.35% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.12% 27.65% 69.00% 41.35% - - - 2.50 -149.56% - - 59.93% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 187.91% 69.00% -118.91% - - - 0.37 63.28% - - -172.33% - 0.00%
PEGATEC PLUS ADHESIVO PARA CERAMICA GRIS DE 20KG
- - - - - - 0.00% 0.00% 83.78% 69.00% -14.78% - - - 0.82 17.64% - - -21.42% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 13.52% 69.00% 55.48% - - - 5.10 -410.44% - - 80.41% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 385.43% 69.00% -316.43% - - - 0.18 82.10% - - -458.59% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.00% 0.00% 176.54% 69.00% -107.54% - - - 0.39 60.91% - - -155.85% - 0.00%
PEGAMIX 20KG
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 258.83 -25783.04% - - 99.61% - 0.00%
NIVELADOR PEGACERAMICO DE 40 KG.
- - - - - - 0.00% 0.00% 663.25% 69.00% -594.25% - - - 0.10 89.60% - - -861.24% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 97.13% 69.00% -28.13% - - - 0.71 28.96% - - -40.77% - 0.00%
FELPA SIN RODILLO
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 139.43 -13842.59% - - 99.28% - 0.00%
IMPERMEABILIZANTE FASTYL
- - - - - - 0.00% 0.00% 411.40% 69.00% -342.40% - - - 0.17 83.23% - - -496.23% - 0.00%
THINNER
- - - - - - 0.00% 0.00% 30.92% 69.00% 38.08% - - - 2.23 -123.17% - - 55.19% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 141.68 -14067.53% - - 99.29% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 46.42% 69.00% 22.58% - - - 1.49 -48.63% - - 32.72% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 88.75% 69.00% -19.75% - - - 0.78 22.25% - - -28.62% - 0.00%
TUBO PVC GRIS DE 2" X 3 MTS
- - - - - - 0.00% 0.00% 169.55% 69.00% -100.55% - - - 0.41 59.30% - - -145.73% - 0.00%
COPLA PVC GRIS DE 2" ELECTRICIDAD
- - - - - - 0.00% 0.00% 7.94% 69.00% 61.06% - - - 8.69 -769.12% - - 88.49% - 0.00%
('PLOMERIA',)
- - - - - - 0.01% 0.01% 77.25% 69.00% -8.25% - - - 0.89 10.67% - - -11.95% - 0.00%
LLAVE DE DUCHA TIPO SAYCO
- - - - - - 0.00% 0.00% 43.22% 69.00% 25.78% - - - 1.60 -59.64% - - 37.36% - 0.00%
PEGAMENTO PVC 1/4
- - - - - - 0.00% 0.00% 94.75% 69.00% -25.75% - - - 0.73 27.18% - - -37.32% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 85.65% 69.00% -16.65% - - - 0.81 19.44% - - -24.14% - 0.00%
REPOSADERA METALICA 2"
- - - - - - 0.00% 0.00% 47.17% 69.00% 21.83% - - - 1.46 -46.28% - - 31.64% - 0.00%
INODORO 1
- - - - - - 0.00% 0.00% 67.42% 69.00% 1.58% - - - 1.02 -2.34% - - 2.29% - 0.00%
TUBO DE 4" (80 PSI) PVC DRENAJE
- - - - - - 0.00% 0.00% 241.13% 69.00% -172.13% - - - 0.29 71.38% - - -249.46% - 0.00%
CHAPETA CROMADA DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 145.26 -14426.33% - - 99.31% - 0.00%
REGADERA GRIFERINA DE DUCHA
- - - - - - 0.00% 0.00% 127.17% 69.00% -58.17% - - - 0.54 45.74% - - -84.30% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.01% 47.32% 69.00% 21.68% - - - 1.46 -45.80% - - 31.41% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 58.18% 69.00% 10.82% - - - 1.19 -18.59% - - 15.68% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 54.86% 69.00% 14.14% - - - 1.26 -25.78% - - 20.50% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 34.81% 69.00% 34.19% - - - 1.98 -98.20% - - 49.55% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 10.77% 69.00% 58.23% - - - 6.41 -540.57% - - 84.39% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 253.66 -25266.23% - - 99.61% - 0.00%
BANDEJA PARA PINTURA
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 139.63 -13863.29% - - 99.28% - 0.00%
MANERAL PARA PINTURA
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 139.96 -13895.72% - - 99.29% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 13.95% 69.00% 55.05% - - - 4.95 -394.68% - - 79.79% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 41.87% 69.00% 27.13% - - - 1.65 -64.78% - - 39.31% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 299.21% 69.00% -230.21% - - - 0.23 76.94% - - -333.64% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 40.89% 69.00% 28.11% - - - 1.69 -68.74% - - 40.74% - 0.00%
ALAMBRE GALVANIZADO CALIBRE 10
- - - - - - 0.00% 0.00% 40.89% 69.00% 28.11% - - - 1.69 -68.74% - - 40.74% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.02% 0.02% 37.02% 69.00% 31.98% - - - 1.86 -86.39% - - 46.35% - 0.00%
MONOCAPA BLANCO EXTRA FINO
- - - - - - 0.00% 0.01% 0.00% 69.00% 69.00% - - - 1146.80 -114579.83% - - 99.91% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 66.72% 69.00% 2.28% - - - 1.03 -3.41% - - 3.30% - 0.00%
CAL
- - - - - - 0.00% 0.00% 8.85% 69.00% 60.15% - - - 7.80 -680.05% - - 87.18% - 0.00%
CEMENTO UGC
- - - - - - 0.01% 0.01% 38.60% 69.00% 30.40% - - - 1.79 -78.76% - - 44.06% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 146.68 -14568.47% - - 99.32% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 146.68 -14568.47% - - 99.32% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.01% 0.41% 69.00% 68.59% - - - 169.06 -16806.42% - - 99.41% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 248.88 -24788.06% - - 99.60% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 349.30 -34830.32% - - 99.71% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 5.32% 69.00% 63.68% - - - 12.97 -1196.75% - - 92.29% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 172.95 -17195.30% - - 99.42% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 214.21 -21320.81% - - 99.53% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 680.21 -67920.65% - - 99.85% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 270.34 -26933.96% - - 99.63% - 0.00%
ANTISOL BLANCO
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 270.34 -26933.96% - - 99.63% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 1004.83 -100383.08% - - 99.90% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 1004.83 -100383.08% - - 99.90% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.01% 0.00% 69.00% 69.00% - - - 1165.12 -116411.99% - - 99.91% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 264.48 -26348.15% - - 99.62% - 0.00%
SELECTO
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 588.78 -58778.15% - - 99.83% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 311.86 -31085.69% - - 99.68% - 0.00%
('CONCRETO',)
- - - - - - 0.01% 0.01% 0.00% 69.00% 69.00% - - - 2600.22 -259921.88% - - 99.96% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.01% 0.01% 0.00% 69.00% 69.00% - - - 2116.92 -211591.76% - - 99.95% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 483.30 -48230.12% - - 99.79% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 69.00% 69.00% - - - 7748.59 -774759.41% - - 99.99% - 0.00%
IMPREVISTOS
- - - - - - 0.04% 0.04% 0.00% 69.00% 69.00% - - - 7748.59 -774759.41% - - 99.99% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 27.47% 69.00% 41.53% - - - 2.51 -151.20% - - 60.19% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 27.47% 69.00% 41.53% - - - 2.51 -151.20% - - 60.19% - 0.00%
SEGUETA PARA SIERRA BANDA PORTÁTIL M-18 MILWAUKEE
- - - - - - 0.00% 0.00% 27.47% 69.00% 41.53% - - - 2.51 -151.20% - - 60.19% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 201.74 -20073.98% - - 99.50% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 201.74 -20073.98% - - 99.50% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 69.00% 69.00% - - - 201.74 -20073.98% - - 99.50% - 0.00%
INFRAESTRUCTURA HIDROSANITARIA
- - - - - - 4.75% 4.92% 70.41% 90.00% 19.59% - - - 1.28 -27.83% - - 21.77% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.01% 485.90% 90.00% -395.90% - - - 0.19 81.48% - - -439.89% - 0.00%
('MOVIMIENTO DE TIERRA',)
- - - - - - 0.00% 0.01% 485.90% 90.00% -395.90% - - - 0.19 81.48% - - -439.89% - 0.00%
EXTRACCION EXCAVACION
- - - - - - 0.00% 0.01% 485.90% 90.00% -395.90% - - - 0.19 81.48% - - -439.89% - 0.00%
('SUBCONTRATOS',)
- - - - - - 4.21% 4.09% 71.02% 90.00% 18.98% - - - 1.27 -26.72% - - 21.09% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 1.86% 1.80% 83.63% 90.00% 6.37% - - - 1.08 -7.61% - - 7.07% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 1.86% 1.80% 83.63% 90.00% 6.37% - - - 1.08 -7.61% - - 7.07% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 2.35% 2.29% 61.09% 90.00% 28.91% - - - 1.47 -47.33% - - 32.13% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.01% 9915.52% 90.00% -9825.52% - - - 0.01 99.09% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 1.75% 1.70% 32.91% 90.00% 57.09% - - - 2.73 -173.50% - - 63.44% - 0.00%
POZO DE ABSORCION
- - - - - - 0.59% 0.58% 38.36% 90.00% 51.64% - - - 2.35 -134.63% - - 57.38% - 0.00%
('MATERIALES',)
- - - - - - 0.54% 0.80% 65.74% 90.00% 24.26% - - - 1.37 -36.90% - - 26.96% - 0.00%
('PREFABRICADOS',)
- - - - - - 0.00% 0.01% 2390.92% 90.00% -2300.92% - - - 0.04 96.24% - - -2556.58% - 0.00%
TAPADERA DE HIERRO FUNDIDA DE 60 CM. MARCA MASELLI
- - - - - - 0.00% 0.01% 2390.92% 90.00% -2300.92% - - - 0.04 96.24% - - -2556.58% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.02% 0.03% 134.10% 90.00% -44.10% - - - 0.67 32.88% - - -49.00% - 0.00%
CAL
- - - - - - 0.00% 0.01% 14.77% 90.00% 75.23% - - - 6.09 -509.46% - - 83.59% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.02% 171.74% 90.00% -81.74% - - - 0.52 47.60% - - -90.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.01% 0.03% 78.74% 90.00% 11.26% - - - 1.14 -14.30% - - 12.51% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.01% 82.97% 90.00% 7.03% - - - 1.08 -8.47% - - 7.81% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.01% 78.17% 90.00% 11.83% - - - 1.15 -15.13% - - 13.14% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.01% 46.05% 90.00% 43.95% - - - 1.95 -95.45% - - 48.84% - 0.00%
PIEDRA BOLA
- - - - - - 0.00% 0.01% 113.12% 90.00% -23.12% - - - 0.80 20.44% - - -25.69% - 0.00%
('PLOMERIA',)
- - - - - - 0.28% 0.34% 74.92% 90.00% 15.08% - - - 1.20 -20.12% - - 16.75% - 0.00%
TUBO DE CONCRETO DE 42"
- - - - - - 0.11% 0.11% 0.00% 90.00% 90.00% - - - 31450.37 -3144937.06% - - 100.00% - 0.00%
PEGAMENTO PVC 1/4
- - - - - - 0.00% 0.01% 19.54% 90.00% 70.46% - - - 4.61 -360.62% - - 78.29% - 0.00%
TUBO DE CONCRETO DE 16"
- - - - - - 0.04% 0.04% 41.74% 90.00% 48.26% - - - 2.16 -115.61% - - 53.62% - 0.00%
TUBO DE 2" (80 PSI) PVC DRENAJE
- - - - - - 0.00% 0.01% 20.30% 90.00% 69.70% - - - 4.43 -343.36% - - 77.44% - 0.00%
TUBO DE 4" (80 PSI) PVC DRENAJE
- - - - - - 0.00% 0.01% 1170.97% 90.00% -1080.97% - - - 0.08 92.31% - - -1201.08% - 0.00%
TUBO DE CONCRETO DE 30"
- - - - - - 0.00% 0.01% 812.40% 90.00% -722.40% - - - 0.11 88.92% - - -802.67% - 0.00%
TUBO DE CONCRETO PERFORADO DE 42"
- - - - - - 0.00% 0.01% 1693.70% 90.00% -1603.70% - - - 0.05 94.69% - - -1781.89% - 0.00%
TUBO DE CONCRETO DE 36"
- - - - - - 0.13% 0.14% 0.00% 90.00% 90.00% - - - 38200.37 -3819937.06% - - 100.00% - 0.00%
UNION DE 4" PVC DRENAJE
- - - - - - 0.00% 0.01% 30.85% 90.00% 59.15% - - - 2.92 -191.73% - - 65.72% - 0.00%
CODO DE 4" X 45 PVC DRENAJE PG
- - - - - - 0.00% 0.01% 23.40% 90.00% 66.60% - - - 3.85 -284.70% - - 74.01% - 0.00%
CODO DE 4" X 90 PVC DRENAJE PG
- - - - - - 0.00% 0.01% 26.99% 90.00% 63.01% - - - 3.33 -233.40% - - 70.01% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.01% 40.13% 90.00% 49.87% - - - 2.24 -124.26% - - 55.41% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.01% 0.00% 90.00% 90.00% - - - 2218.06 -221705.56% - - 99.95% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.01% 90.99% 90.00% -0.99% - - - 0.99 1.09% - - -1.10% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.08% 0.14% 37.64% 90.00% 52.36% - - - 2.39 -139.14% - - 58.18% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.00% 0.01% 59.44% 90.00% 30.56% - - - 1.51 -51.41% - - 33.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.02% 0.33% 90.00% 89.67% - - - 272.02 -27101.91% - - 99.63% - 0.00%
ACERO DE 1/2 X 6 MT COMERCIAL
- - - - - - 0.00% 0.01% 73.63% 90.00% 16.37% - - - 1.22 -22.23% - - 18.19% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.01% 0.01% 0.00% 90.00% 90.00% - - - 3333.00 -333200.26% - - 99.97% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.02% 0.03% 0.00% 90.00% 90.00% - - - 7126.47 -712546.66% - - 99.99% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.03% 0.04% 85.68% 90.00% 4.32% - - - 1.05 -5.04% - - 4.80% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.01% 0.25% 90.00% 89.75% - - - 355.77 -35476.64% - - 99.72% - 0.00%
CLAVO DE 3"
- - - - - - 0.01% 0.01% 1.00% 90.00% 89.00% - - - 89.78 -8878.18% - - 98.89% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.01% 2.99% 90.00% 87.01% - - - 30.08 -2907.51% - - 96.67% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.01% 155.27% 90.00% -65.27% - - - 0.58 42.04% - - -72.52% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.00% 0.01% 12.73% 90.00% 77.27% - - - 7.07 -607.22% - - 85.86% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.01% 12.73% 90.00% 77.27% - - - 7.07 -607.22% - - 85.86% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.02% 9.79% 90.00% 80.21% - - - 9.20 -819.73% - - 89.13% - 0.00%
TUBO PVC GRIS DE 2" X 3 MTS
- - - - - - 0.00% 0.01% 24.04% 90.00% 65.96% - - - 3.74 -274.41% - - 73.29% - 0.00%
COPLA PVC GRIS DE 2" ELECTRICIDAD
- - - - - - 0.00% 0.01% 4.91% 90.00% 85.09% - - - 18.32 -1732.47% - - 94.54% - 0.00%
COPLA PVC GRIS DE 1" ELECTRICIDAD
- - - - - - 0.00% 0.01% 0.41% 90.00% 89.59% - - - 221.01 -22000.64% - - 99.55% - 0.00%
('MADERA',)
- - - - - - 0.02% 0.05% 8.21% 90.00% 81.79% - - - 10.96 -995.73% - - 90.87% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.01% 33.72% 90.00% 56.28% - - - 2.67 -166.92% - - 62.54% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.02% 0.03% 0.00% 90.00% 90.00% - - - 7958.43 -795742.66% - - 99.99% - 0.00%
REGLA DE 3"X2"X8'
- - - - - - 0.00% 0.01% 0.00% 90.00% 90.00% - - - 2099.57 -209857.06% - - 99.95% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.01% 29.91% 90.00% 60.09% - - - 3.01 -200.93% - - 66.77% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.01% 5.76% 90.00% 84.24% - - - 15.63 -1462.83% - - 93.60% - 0.00%
THINNER
- - - - - - 0.00% 0.01% 5.76% 90.00% 84.24% - - - 15.63 -1462.83% - - 93.60% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.02% 2.58% 90.00% 87.42% - - - 34.89 -3389.40% - - 97.13% - 0.00%
DISCOS P/CORTE D/METAL DE 9"
- - - - - - 0.00% 0.01% 1.00% 90.00% 89.00% - - - 89.72 -8871.66% - - 98.89% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.01% 2.04% 90.00% 87.96% - - - 44.05 -4304.56% - - 97.73% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.01% 0.28% 90.00% 89.72% - - - 324.14 -32314.27% - - 99.69% - 0.00%
WIPE
- - - - - - 0.00% 0.01% 6.99% 90.00% 83.01% - - - 12.87 -1187.04% - - 92.23% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.01% 0.00% 90.00% 90.00% - - - 1828.15 -182714.86% - - 99.95% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.01% 0.00% 90.00% 90.00% - - - 1828.15 -182714.86% - - 99.95% - 0.00%
('CONCRETO',)
- - - - - - 0.04% 0.05% 0.00% 90.00% 90.00% - - - 13646.44 -1364544.46% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 5003 M3
- - - - - - 0.04% 0.05% 0.00% 90.00% 90.00% - - - 13646.44 -1364544.46% - - 99.99% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 0.00% 90.00% 90.00% - - - 25729.75 -2572874.56% - - 100.00% - 0.00%
IMPREVISTOS
- - - - - - 0.09% 0.09% 0.00% 90.00% 90.00% - - - 25729.75 -2572874.56% - - 100.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.01% 37.53% 90.00% 52.47% - - - 2.40 -139.79% - - 58.30% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.01% 37.53% 90.00% 52.47% - - - 2.40 -139.79% - - 58.30% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.01% 37.53% 90.00% 52.47% - - - 2.40 -139.79% - - 58.30% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.01% 0.02% 0.00% 90.00% 90.00% - - - 4572.59 -457159.06% - - 99.98% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.01% 0.02% 0.00% 90.00% 90.00% - - - 4572.59 -457159.06% - - 99.98% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.01% 0.02% 0.00% 90.00% 90.00% - - - 4572.59 -457159.06% - - 99.98% - 0.00%
CISTERNA Y CUARTO DE BOMBAS
- - - - - - 1.64% 2.01% 61.51% 100.00% 38.49% - - - 1.63 -62.59% - - 38.49% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.04% 0.08% 199.36% 100.00% -99.36% - - - 0.50 49.84% - - -99.36% - 0.00%
('MOVIMIENTO DE TIERRA',)
- - - - - - 0.00% 0.01% 1104.35% 100.00% -1004.35% - - - 0.09 90.94% - - -1004.35% - 0.00%
EXTRACCION EXCAVACION
- - - - - - 0.00% 0.01% 1104.35% 100.00% -1004.35% - - - 0.09 90.94% - - -1004.35% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.04% 0.07% 75.88% 100.00% 24.12% - - - 1.32 -31.78% - - 24.12% - 0.00%
HERRAMIENTAS Y EQUIPO
- - - - - - 0.00% 0.01% 556.20% 100.00% -456.20% - - - 0.18 82.02% - - -456.20% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.01% 0.02% 0.00% 100.00% 100.00% - - - 4741.65 -474065.38% - - 99.98% - 0.00%
ALQUILER FORMALETA DE METAL Y ACCESORIOS
- - - - - - 0.03% 0.04% 0.00% 100.00% 100.00% - - - 13312.72 -1331172.38% - - 99.99% - 0.00%
('MATERIALES',)
- - - - - - 0.77% 1.06% 62.80% 100.00% 37.20% - - - 1.59 -59.25% - - 37.20% - 0.00%
('CONCRETO',)
- - - - - - 0.24% 0.26% 124.60% 100.00% -24.60% - - - 0.80 19.75% - - -24.60% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.04% 0.05% 0.00% 100.00% 100.00% - - - 15492.77 -1549177.38% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.01% 500.35% 100.00% -400.35% - - - 0.20 80.01% - - -400.35% - 0.00%
BAJA PERMEABILIDAD 400 PSI 3/8
- - - - - - 0.00% 0.01% 3124.41% 100.00% -3024.41% - - - 0.03 96.80% - - -3024.41% - 0.00%
CONCRETO CONVENCIONAL 4001 M3
- - - - - - 0.19% 0.20% 0.00% 100.00% 100.00% - - - 61779.23 -6177823.38% - - 100.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.23% 0.29% 73.19% 100.00% 26.81% - - - 1.37 -36.63% - - 26.81% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.00% 0.01% 20.40% 100.00% 79.60% - - - 4.90 -390.23% - - 79.60% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.01% 0.02% 25.12% 100.00% 74.88% - - - 3.98 -298.01% - - 74.88% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.01% 14.67% 100.00% 85.33% - - - 6.82 -581.67% - - 85.33% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.20% 0.20% 81.12% 100.00% 18.88% - - - 1.23 -23.28% - - 18.88% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.02% 0.02% 171.05% 100.00% -71.05% - - - 0.58 41.54% - - -71.05% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.01% 7.96% 100.00% 92.04% - - - 12.57 -1156.66% - - 92.04% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.01% 19.71% 100.00% 80.29% - - - 5.07 -407.44% - - 80.29% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.01% 7.79% 100.00% 92.21% - - - 12.84 -1183.58% - - 92.21% - 0.00%
('MADERA',)
- - - - - - 0.09% 0.12% 65.90% 100.00% 34.10% - - - 1.52 -51.74% - - 34.10% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.01% 279.17% 100.00% -179.17% - - - 0.36 64.18% - - -179.17% - 0.00%
TABLON DE 2" X 12" X 10'
- - - - - - 0.00% 0.01% 249.58% 100.00% -149.58% - - - 0.40 59.93% - - -149.58% - 0.00%
REGLA DE 2" X 2" X 10'
- - - - - - 0.05% 0.06% 0.00% 100.00% 100.00% - - - 18163.19 -1816219.38% - - 99.99% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.04% 0.04% 70.68% 100.00% 29.32% - - - 1.41 -41.48% - - 29.32% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.02% 0.06% 48.41% 100.00% 51.59% - - - 2.07 -106.56% - - 51.59% - 0.00%
LEVANTA MUROS 50 KG
- - - - - - 0.00% 0.01% 7.41% 100.00% 92.59% - - - 13.50 -1250.24% - - 92.59% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.01% 4.95% 100.00% 95.05% - - - 20.21 -1921.34% - - 95.05% - 0.00%
CAL
- - - - - - 0.00% 0.01% 11.18% 100.00% 88.82% - - - 8.94 -794.44% - - 88.82% - 0.00%
CEMENTO UGC
- - - - - - 0.02% 0.03% 97.14% 100.00% 2.86% - - - 1.03 -2.94% - - 2.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.03% 39.46% 100.00% 60.54% - - - 2.53 -153.41% - - 60.54% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.01% 0.00% 100.00% 100.00% - - - 2867.81 -286681.38% - - 99.97% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.01% 66.61% 100.00% 33.39% - - - 1.50 -50.12% - - 33.39% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.01% 49.88% 100.00% 50.12% - - - 2.00 -100.50% - - 50.12% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.00% 0.02% 16.42% 100.00% 83.58% - - - 6.09 -508.83% - - 83.58% - 0.00%
BLOCK "U" DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.01% 2.24% 100.00% 97.76% - - - 44.64 -4363.81% - - 97.76% - 0.00%
BLOCK DE 14X19X39 - 66KG/CM2
- - - - - - 0.00% 0.01% 30.61% 100.00% 69.39% - - - 3.27 -226.69% - - 69.39% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.01% 8.22% 100.00% 91.78% - - - 12.17 -1116.88% - - 91.78% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.01% 8.22% 100.00% 91.78% - - - 12.17 -1116.88% - - 91.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.01% 0.19% 100.00% 99.81% - - - 540.22 -53922.23% - - 99.81% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.01% 0.19% 100.00% 99.81% - - - 540.22 -53922.23% - - 99.81% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.01% 0.10% 100.00% 99.90% - - - 960.40 -95939.52% - - 99.90% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.01% 0.10% 100.00% 99.90% - - - 960.40 -95939.52% - - 99.90% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.01% 0.00% 100.00% 100.00% - - - 2853.39 -285239.38% - - 99.96% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.01% 0.00% 100.00% 100.00% - - - 2853.39 -285239.38% - - 99.96% - 0.00%
('MATERIALES',)
- - - - - - 0.03% 0.04% 0.00% 100.00% 100.00% - - - 12710.63 -1270963.38% - - 99.99% - 0.00%
IMPREVISTOS
- - - - - - 0.03% 0.04% 0.00% 100.00% 100.00% - - - 12710.63 -1270963.38% - - 99.99% - 0.00%
('ADITIVOS',)
- - - - - - 0.16% 0.20% 0.00% 100.00% 100.00% - - - 63136.65 -6313564.91% - - 100.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.01% 0.00% 100.00% 100.00% - - - 3339.08 -333808.38% - - 99.97% - 0.00%
AQUASTOP
- - - - - - 0.01% 0.02% 0.00% 100.00% 100.00% - - - 4947.14 -494614.38% - - 99.98% - 0.00%
EMULSION ASFALTICA
- - - - - - 0.01% 0.02% 0.00% 100.00% 100.00% - - - 6251.97 -625097.38% - - 99.98% - 0.00%
SIKATOP SEAL 107, KIT 16.3 KG
- - - - - - 0.09% 0.10% 0.00% 100.00% 100.00% - - - 30645.27 -3064427.38% - - 100.00% - 0.00%
SIKAGARD 62, KIT 22 KG
- - - - - - 0.05% 0.06% 0.00% 100.00% 100.00% - - - 17953.17 -1795217.38% - - 99.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.76% 0.78% 50.34% 100.00% 49.66% - - - 1.99 -98.66% - - 49.66% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.75% 0.76% 52.00% 100.00% 48.00% - - - 1.92 -92.31% - - 48.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.01% 933.28% 100.00% -833.28% - - - 0.11 89.29% - - -833.28% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.67% 0.66% 47.02% 100.00% 52.98% - - - 2.13 -112.66% - - 52.98% - 0.00%
SUBCONTRATO DE ESCALONES
- - - - - - 0.04% 0.05% 0.00% 100.00% 100.00% - - - 14952.37 -1495137.38% - - 99.99% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 13635.54 -1363454.38% - - 99.99% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.02% 0.03% 0.00% 100.00% 100.00% - - - 7852.37 -785137.38% - - 99.99% - 0.00%
SUBCONTRATO TAPADERA HIERRO FUNDIDO 0.40CM
- - - - - - 0.02% 0.03% 0.00% 100.00% 100.00% - - - 7852.37 -785137.38% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.06% 0.08% 27.44% 100.00% 72.56% - - - 3.64 -264.37% - - 72.56% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.06% 0.08% 27.44% 100.00% 72.56% - - - 3.64 -264.37% - - 72.56% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.06% 0.07% 0.00% 100.00% 100.00% - - - 21939.57 -2193857.38% - - 100.00% - 0.00%
VIAJES DE SELECTO
- - - - - - 0.00% 0.01% 238.54% 100.00% -138.54% - - - 0.42 58.08% - - -138.54% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.01% 20.54% 100.00% 79.46% - - - 4.87 -386.84% - - 79.46% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.01% 20.54% 100.00% 79.46% - - - 4.87 -386.84% - - 79.46% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.01% 20.54% 100.00% 79.46% - - - 4.87 -386.84% - - 79.46% - 0.00%
MOVIMIENTO DE TIERRAS
- - - - - - 4.53% 5.90% 55.14% 100.00% 44.86% - - - 1.81 -81.36% - - 44.86% - 0.00%
('SUBCONTRATOS',)
- - - - - - 4.40% 4.82% 95.96% 100.00% 4.04% - - - 1.04 -4.21% - - 4.04% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 4.40% 4.63% 108.69% 100.00% -8.69% - - - 0.92 8.00% - - -8.69% - 0.00%
SUBCONTRATOS
- - - - - - 4.33% 4.38% 109.13% 100.00% -9.13% - - - 0.92 8.37% - - -9.13% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.06% 0.25% 101.07% 100.00% -1.07% - - - 0.99 1.06% - - -1.07% - 0.00%
('SUB CONTRATO MOVIMIENTO DE TIERRA',)
- - - - - - 0.00% 0.19% -214.47% 100.00% 314.47% - - - 59568.77 -5956776.62% - - 100.00% - 0.00%
SUBCONTRATO SERVICIOS DE TOPOGRAFIA
- - - - - - 0.00% 0.19% -214.47% 100.00% 314.47% - - - 59568.77 -5956776.62% - - 100.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.19% -138.25% 100.00% 238.25% - - - 59568.77 -5956776.62% - - 100.00% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.19% -138.25% 100.00% 238.25% - - - 59568.77 -5956776.62% - - 100.00% - 0.00%
VIAJES DE SELECTO
- - - - - - 0.00% 0.19% -138.25% 100.00% 238.25% - - - 59568.77 -5956776.62% - - 100.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.19% -226.89% 100.00% 326.89% - - - 59568.77 -5956776.62% - - 100.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.19% -226.89% 100.00% 326.89% - - - 59568.77 -5956776.62% - - 100.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.19% -226.89% 100.00% 326.89% - - - 59568.77 -5956776.62% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.13% 0.32% -142.20% 100.00% 242.20% - - - 98966.51 -9896550.62% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.13% 0.32% -142.20% 100.00% 242.20% - - - 98966.51 -9896550.62% - - 100.00% - 0.00%
IMPREVISTOS
- - - - - - 0.13% 0.32% -142.20% 100.00% 242.20% - - - 98966.51 -9896550.62% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.38% -61.12% 100.00% 161.12% - - - 119137.53 -11913653.25% - - 100.00% - 0.00%
('MOVIMIENTO DE TIERRA',)
- - - - - - 0.00% 0.38% -61.12% 100.00% 161.12% - - - 119137.53 -11913653.25% - - 100.00% - 0.00%
EXTRACCION EXCAVACION
- - - - - - 0.00% 0.19% -203.46% 100.00% 303.46% - - - 59568.77 -5956776.62% - - 100.00% - 0.00%
SUBCONTRATO MOVIMIENTO DE TIERRA
- - - - - - 0.00% 0.19% 81.21% 100.00% 18.79% - - - 1.23 -23.14% - - 18.79% - 0.00%
SE?ALIZACION VIAL
- - - - - - 0.05% 0.05% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.05% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.05% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SEÑALIZACION VIAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN SPRAY
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SEGURIDAD INDUSTRIAL',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CERCA PLASTICA LIMITACION NARANJA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 24
- - - - - - 1.30% 1.25% 100.03% 100.00% -0.03% - - - 1.00 0.03% - - -0.03% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 128.74% 100.00% -28.74% - - - 0.78 22.32% - - -28.74% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 252.18% 100.00% -152.18% - - - 0.40 60.35% - - -152.18% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 410.18% 100.00% -310.18% - - - 0.24 75.62% - - -310.18% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 1082466.67% 100.00% -1082366.67% - - - 0.00 99.99% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 573.61% 100.00% -473.61% - - - 0.17 82.57% - - -473.61% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 139.02% 100.00% -39.02% - - - 0.72 28.07% - - -39.02% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO FLUIDO 3003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 107.94% 100.00% -7.94% - - - 0.93 7.35% - - -7.94% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 387.24% 100.00% -287.24% - - - 0.26 74.18% - - -287.24% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 164.95% 100.00% -64.95% - - - 0.61 39.37% - - -64.95% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 137.99% 100.00% -37.99% - - - 0.72 27.53% - - -37.99% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 40.33% 100.00% 59.67% - - - 2.48 -147.94% - - 59.67% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 333.15% 100.00% -233.15% - - - 0.30 69.98% - - -233.15% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 256.54% 100.00% -156.54% - - - 0.39 61.02% - - -156.54% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 276.19% 100.00% -176.19% - - - 0.36 63.79% - - -176.19% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 278.20% 100.00% -178.20% - - - 0.36 64.06% - - -178.20% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 2-1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 75.67% 100.00% 24.33% - - - 1.32 -32.16% - - 24.33% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 75.67% 100.00% 24.33% - - - 1.32 -32.16% - - 24.33% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 64.71% 100.00% 35.29% - - - 1.55 -54.55% - - 35.29% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 105.24% 100.00% -5.24% - - - 0.95 4.98% - - -5.24% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 149.26% 100.00% -49.26% - - - 0.67 33.00% - - -49.26% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 218.44% 100.00% -118.44% - - - 0.46 54.22% - - -118.44% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE BOMBEO CONVENCIONAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION CON PLUMA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 109.17% 100.00% -9.17% - - - 0.92 8.40% - - -9.17% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 46.39% 100.00% 53.61% - - - 2.16 -115.56% - - 53.61% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 95.99% 100.00% 4.01% - - - 1.04 -4.17% - - 4.01% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 95.43% 100.00% 4.57% - - - 1.05 -4.79% - - 4.57% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.59% 100.00% 62.41% - - - 2.66 -166.06% - - 62.41% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 65.00% 100.00% 35.00% - - - 1.54 -53.86% - - 35.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 65.00% 100.00% 35.00% - - - 1.54 -53.86% - - 35.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 77.57% 100.00% 22.43% - - - 1.29 -28.92% - - 22.43% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 104.10% 100.00% -4.10% - - - 0.96 3.93% - - -4.10% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 104.10% 100.00% -4.10% - - - 0.96 3.93% - - -4.10% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 34.49% 100.00% 65.51% - - - 2.90 -189.92% - - 65.51% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2074.17% 100.00% -1974.17% - - - 0.05 95.18% - - -1974.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MALLA DE REFUERZO 0.97X45.70 (44.32MST)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 235.15% 100.00% -135.15% - - - 0.43 57.47% - - -135.15% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 235.15% 100.00% -135.15% - - - 0.43 57.47% - - -135.15% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 127.35% 100.00% -27.35% - - - 0.79 21.48% - - -27.35% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 215.05% 100.00% -115.05% - - - 0.47 53.50% - - -115.05% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 116.33% 100.00% -16.33% - - - 0.86 14.03% - - -16.33% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 71.88 -7088.00% - - 98.61% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 4.57% 100.00% 95.43% - - - 21.88 -2087.82% - - 95.43% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 2.45% 100.00% 97.55% - - - 40.89 -3989.44% - - 97.55% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 248.91 -24791.00% - - 99.60% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA DE BROCA 37709 DE 7X7X16
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 1 5/8" X 10' (CAL 26)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 73.61% 100.00% 26.39% - - - 1.36 -35.86% - - 26.39% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 101.41% 100.00% -1.41% - - - 0.99 1.39% - - -1.41% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 67756.36% 100.00% -67656.36% - - - 0.00 99.85% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 5172.41% 100.00% -5072.41% - - - 0.02 98.07% - - -5072.41% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 123.31% 100.00% -23.31% - - - 0.81 18.91% - - -23.31% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 121.61% 100.00% -21.61% - - - 0.82 17.77% - - -21.61% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 88.12% 100.00% 11.88% - - - 1.13 -13.48% - - 11.88% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.42% 100.00% 27.58% - - - 1.38 -38.08% - - 27.58% - 0.00%
ACERO DE 1/2 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 19.39% 100.00% 80.61% - - - 5.16 -415.73% - - 80.61% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 169.41% 100.00% -69.41% - - - 0.59 40.97% - - -69.41% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.27% 100.00% -109.27% - - - 0.48 52.21% - - -109.27% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 97.73% 100.00% 2.27% - - - 1.02 -2.32% - - 2.27% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 184.69% 100.00% -84.69% - - - 0.54 45.86% - - -84.69% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 741.64% 100.00% -641.64% - - - 0.13 86.52% - - -641.64% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 96.41% 100.00% 3.59% - - - 1.04 -3.73% - - 3.59% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 54.60% 100.00% 45.40% - - - 1.83 -83.16% - - 45.40% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
CONCRETO M004 PARA VIVIENDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLANCHA DE THERMOPOR DE 2*50*100 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 43.82% 100.00% 56.18% - - - 2.28 -128.20% - - 56.18% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 43.82% 100.00% 56.18% - - - 2.28 -128.20% - - 56.18% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 45.18% 100.00% 54.82% - - - 2.21 -121.36% - - 54.82% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 83.36% 100.00% 16.64% - - - 1.20 -19.96% - - 16.64% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 456.68% 100.00% -356.68% - - - 0.22 78.10% - - -356.68% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 427.92% 100.00% -327.92% - - - 0.23 76.63% - - -327.92% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 427.92% 100.00% -327.92% - - - 0.23 76.63% - - -327.92% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 12' TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIA VIDRIO LIQUIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DETERGENTE ESPUMIL 1000 GRS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SQUEEGEE LIMPIADOR DE VIDRIOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 109.67% 100.00% -9.67% - - - 0.91 8.81% - - -9.67% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 94.88% 100.00% 5.12% - - - 1.05 -5.39% - - 5.12% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.35% 100.00% 99.65% - - - 289.12 -28811.52% - - 99.65% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.35% 100.00% 99.65% - - - 289.12 -28811.52% - - 99.65% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 104.05% 100.00% -4.05% - - - 0.96 3.89% - - -4.05% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 104.05% 100.00% -4.05% - - - 0.96 3.89% - - -4.05% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 104.05% 100.00% -4.05% - - - 0.96 3.89% - - -4.05% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 104.05% 100.00% -4.05% - - - 0.96 3.89% - - -4.05% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 99.36% 100.00% 0.64% - - - 1.01 -0.64% - - 0.64% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 128.96% 100.00% -28.96% - - - 0.78 22.46% - - -28.96% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 107.72% 100.00% -7.72% - - - 0.93 7.17% - - -7.72% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 107.72% 100.00% -7.72% - - - 0.93 7.17% - - -7.72% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 83.64% 100.00% 16.36% - - - 1.20 -19.57% - - 16.36% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 83.45% 100.00% 16.55% - - - 1.20 -19.84% - - 16.55% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 117.86% 100.00% -17.86% - - - 0.85 15.16% - - -17.86% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 86.98% 100.00% 13.02% - - - 1.15 -14.96% - - 13.02% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.15% 100.00% -3.15% - - - 0.97 3.06% - - -3.15% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 84.56% 100.00% 15.44% - - - 1.18 -18.26% - - 15.44% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 31.22% 100.00% 68.78% - - - 3.20 -220.31% - - 68.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 93.49% 100.00% 6.51% - - - 1.07 -6.96% - - 6.51% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 88.42% 100.00% 11.58% - - - 1.13 -13.10% - - 11.58% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 88.42% 100.00% 11.58% - - - 1.13 -13.10% - - 11.58% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 52.42% 100.00% 47.58% - - - 1.91 -90.77% - - 47.58% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 10.74% 100.00% 89.26% - - - 9.31 -830.72% - - 89.26% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 30.96% 100.00% 69.04% - - - 3.23 -223.01% - - 69.04% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 26.85% 100.00% 73.15% - - - 3.72 -272.39% - - 73.15% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 354.38 -35338.00% - - 99.72% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 62.22% 100.00% 37.78% - - - 1.61 -60.71% - - 37.78% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 500.50 -49950.00% - - 99.80% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 506.24 -50524.00% - - 99.80% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2326.71 -232571.00% - - 99.96% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 100.00% 100.00% - - - 1539.00 -153800.00% - - 99.94% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 55.11% 100.00% 44.89% - - - 1.81 -81.47% - - 44.89% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.13% 100.00% -0.13% - - - 1.00 0.13% - - -0.13% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 100.00% -3.14% - - - 0.97 3.04% - - -3.14% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 4.38% 100.00% 95.62% - - - 22.81 -2181.49% - - 95.62% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 5.70% 100.00% 94.30% - - - 17.55 -1654.91% - - 94.30% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 4.34% 100.00% 95.66% - - - 23.02 -2202.22% - - 95.66% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
CASA # 9
- - - - - - 1.30% 1.25% 96.32% 96.48% 0.16% - - - 1.00 -0.17% - - 0.17% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 127.03% 93.05% -33.98% - - - 0.73 26.75% - - -36.52% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 642.10% 100.00% -542.10% - - - 0.16 84.43% - - -542.10% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 627.16% 100.00% -527.16% - - - 0.16 84.06% - - -527.16% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 627.16% 100.00% -527.16% - - - 0.16 84.06% - - -527.16% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
THINNER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 331.96% 100.00% -231.96% - - - 0.30 69.88% - - -231.96% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 205.27% 100.00% -105.27% - - - 0.49 51.28% - - -105.27% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 202.96% 100.00% -102.96% - - - 0.49 50.73% - - -102.96% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 108.42% 100.00% -8.42% - - - 0.92 7.77% - - -8.42% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 108.42% 100.00% -8.42% - - - 0.92 7.77% - - -8.42% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 151.98% 100.00% -51.98% - - - 0.66 34.20% - - -51.98% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 100.00% -21.57% - - - 0.82 17.74% - - -21.57% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 117.69% 100.00% -17.69% - - - 0.85 15.03% - - -17.69% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 172.71% 100.00% -72.71% - - - 0.58 42.10% - - -72.71% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 152.45% 100.00% -52.45% - - - 0.66 34.40% - - -52.45% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 152.45% 100.00% -52.45% - - - 0.66 34.40% - - -52.45% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 88.46% 100.00% 11.54% - - - 1.13 -13.04% - - 11.54% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 88.46% 100.00% 11.54% - - - 1.13 -13.04% - - 11.54% - 0.00%
PEGATEC PLUS ADHESIVO PARA CERAMICA GRIS DE 20KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 475.62 -47462.00% - - 99.79% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 446.44 -44544.00% - - 99.78% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1950.66 -194966.00% - - 99.95% - 0.00%
PISO CERAMICO ANDORRA ACERO 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO GR 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA PLOMO 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA GRIS 20X66
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 106.66% 100.00% -6.66% - - - 0.94 6.24% - - -6.66% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 81.05% 100.00% 18.95% - - - 1.23 -23.38% - - 18.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 55.07% 100.00% 44.93% - - - 1.82 -81.60% - - 44.93% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 27.52% 100.00% 72.48% - - - 3.63 -263.31% - - 72.48% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 79.31% 100.00% 20.69% - - - 1.26 -26.09% - - 20.69% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 75.20% 100.00% 24.80% - - - 1.33 -32.97% - - 24.80% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 193.01% 100.00% -93.01% - - - 0.52 48.19% - - -93.01% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1350.00 -134900.00% - - 99.93% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 254.95% 100.00% -154.95% - - - 0.39 60.78% - - -154.95% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 406.92% 100.00% -306.92% - - - 0.25 75.43% - - -306.92% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2326.71 -232571.00% - - 99.96% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 100.00% 100.00% - - - 1539.00 -153800.00% - - 99.94% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 257.12% 0.00% -257.12% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL LATEX BLANCO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA MOUNTAIN FULL WEATHER CUBETA MATE COLOR BLANCO DE LINA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA PROCOAT CUBETA MATE COLOR BLANCO DE LINEA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE EXTRA WHITE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE DEEP
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 159.52% 0.00% -159.52% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 159.52% 0.00% -159.52% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 123.52% 0.00% -123.52% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 90.18% 100.00% 9.82% - - - 1.11 -10.89% - - 9.82% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 145.62% 100.00% -45.62% - - - 0.69 31.33% - - -45.62% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 195.27% 100.00% -95.27% - - - 0.51 48.79% - - -95.27% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 195.27% 100.00% -95.27% - - - 0.51 48.79% - - -95.27% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 64.97% 100.00% 35.03% - - - 1.54 -53.92% - - 35.03% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6524.98% 100.00% -6424.98% - - - 0.02 98.47% - - -6424.98% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 711.58% 100.00% -611.58% - - - 0.14 85.95% - - -611.58% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 711.58% 100.00% -611.58% - - - 0.14 85.95% - - -611.58% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 162.20% 100.00% -62.20% - - - 0.62 38.35% - - -62.20% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 43.51% 100.00% 56.49% - - - 2.30 -129.85% - - 56.49% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 4920.52% 100.00% -4820.52% - - - 0.02 97.97% - - -4820.52% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 52.37% 100.00% 47.63% - - - 1.91 -90.95% - - 47.63% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 22.61% 100.00% 77.39% - - - 4.42 -342.37% - - 77.39% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 8.93% 100.00% 91.07% - - - 11.20 -1020.21% - - 91.07% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1982.45% 100.00% -1882.45% - - - 0.05 94.96% - - -1882.45% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 1025.07% 100.00% -925.07% - - - 0.10 90.24% - - -925.07% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 16.36% 100.00% 83.64% - - - 6.11 -511.08% - - 83.64% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 5/8 X 8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 72.55% 100.00% 27.45% - - - 1.38 -37.83% - - 27.45% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 102.33% 100.00% -2.33% - - - 0.98 2.27% - - -2.33% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 102.33% 100.00% -2.33% - - - 0.98 2.27% - - -2.33% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 50.13% 100.00% 49.87% - - - 1.99 -99.48% - - 49.87% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 422.75% 100.00% -322.75% - - - 0.24 76.35% - - -322.75% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 99.17% 100.00% 0.83% - - - 1.01 -0.84% - - 0.83% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 120.06% 100.00% -20.06% - - - 0.83 16.71% - - -20.06% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 26.53% 100.00% 73.47% - - - 3.77 -276.87% - - 73.47% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 143.03% 100.00% -43.03% - - - 0.70 30.09% - - -43.03% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 187.77% 100.00% -87.77% - - - 0.53 46.74% - - -87.77% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL DE 2 1/2"X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA FINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO TABLAYESO DE 7 X 7/16" ROSCA FINA PUNTA CORRIENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 0.00% 100.00% 100.00% - - - 16308.96 -1630796.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 72.46% 100.00% 27.54% - - - 1.38 -38.01% - - 27.54% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 99.88% 100.00% 0.12% - - - 1.00 -0.12% - - 0.12% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 7828.41% 100.00% -7728.41% - - - 0.01 98.72% - - -7728.41% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
POLIURETANO MARCA DYMONIC 100
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 239.35% 100.00% -139.35% - - - 0.42 58.22% - - -139.35% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DISCOS P/CORTE D/METAL DE 9"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 126.09% 100.00% -26.09% - - - 0.79 20.69% - - -26.09% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 89.15% 100.00% 10.85% - - - 1.12 -12.17% - - 10.85% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.33% 100.00% 27.67% - - - 1.38 -38.26% - - 27.67% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 236.29% 100.00% -136.29% - - - 0.42 57.68% - - -136.29% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 211.59% 100.00% -111.59% - - - 0.47 52.74% - - -111.59% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 354.24% 100.00% -254.24% - - - 0.28 71.77% - - -254.24% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 183.82% 100.00% -83.82% - - - 0.54 45.60% - - -83.82% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 903.31% 100.00% -803.31% - - - 0.11 88.93% - - -803.31% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 90.19% 100.00% 9.81% - - - 1.11 -10.88% - - 9.81% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 76.13% 100.00% 23.87% - - - 1.31 -31.35% - - 23.87% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 43.08% 100.00% 56.92% - - - 2.32 -132.15% - - 56.92% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 43.08% 100.00% 56.92% - - - 2.32 -132.15% - - 56.92% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 63.98% 100.00% 36.02% - - - 1.56 -56.31% - - 36.02% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 80.15% 100.00% 19.85% - - - 1.25 -24.76% - - 19.85% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 80.15% 100.00% 19.85% - - - 1.25 -24.76% - - 19.85% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 108.09% 100.00% -8.09% - - - 0.93 7.48% - - -8.09% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 56.01% 100.00% 43.99% - - - 1.79 -78.55% - - 43.99% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 106.58% 100.00% -6.58% - - - 0.94 6.17% - - -6.58% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 60.93% 100.00% 39.07% - - - 1.64 -64.13% - - 39.07% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 98.38% 100.00% 1.62% - - - 1.02 -1.64% - - 1.62% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 83.03% 100.00% 16.97% - - - 1.20 -20.44% - - 16.97% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.54% 100.00% 62.46% - - - 2.66 -166.39% - - 62.46% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 17.55% 100.00% 82.45% - - - 5.70 -469.87% - - 82.45% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 53.14% 93.64% 40.50% - - - 1.76 -76.23% - - 43.26% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.13% 88.00% -12.13% - - - 0.88 12.12% - - -13.79% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 88.00% -15.14% - - - 0.85 14.68% - - -17.20% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.19% 100.00% 99.81% - - - 521.99 -52099.20% - - 99.81% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 100.00% 93.42% - - - 15.20 -1420.37% - - 93.42% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
CASA # 39
- - - - - - 1.30% 1.30% 91.91% 92.43% 0.52% - - - 1.01 -0.57% - - 0.56% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.46% 124.28% 85.84% -38.44% - - - 0.69 30.93% - - -44.78% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 207.00% 100.00% -107.00% - - - 0.48 51.69% - - -107.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 205.55% 100.00% -105.55% - - - 0.49 51.35% - - -105.55% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 111.01% 100.00% -11.01% - - - 0.90 9.92% - - -11.01% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 103.04% 100.00% -3.04% - - - 0.97 2.95% - - -3.04% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 181.52% 100.00% -81.52% - - - 0.55 44.91% - - -81.52% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 181.52% 100.00% -81.52% - - - 0.55 44.91% - - -81.52% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 181.52% 100.00% -81.52% - - - 0.55 44.91% - - -81.52% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 181.52% 100.00% -81.52% - - - 0.55 44.91% - - -81.52% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 156.70% 100.00% -56.70% - - - 0.64 36.19% - - -56.70% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 156.70% 100.00% -56.70% - - - 0.64 36.19% - - -56.70% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 156.70% 100.00% -56.70% - - - 0.64 36.19% - - -56.70% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 493.16 -49216.00% - - 99.80% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 149.06% 100.00% -49.06% - - - 0.67 32.91% - - -49.06% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 193.23% 100.00% -93.23% - - - 0.52 48.25% - - -93.23% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 173.46% 100.00% -73.46% - - - 0.58 42.35% - - -73.46% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 173.46% 100.00% -73.46% - - - 0.58 42.35% - - -73.46% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 125.60% 100.00% -25.60% - - - 0.80 20.38% - - -25.60% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 125.60% 100.00% -25.60% - - - 0.80 20.38% - - -25.60% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 475.62 -47462.00% - - 99.79% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 446.44 -44544.00% - - 99.78% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 100.00% 67.70% - - - 3.10 -209.63% - - 67.70% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 60.53% 100.00% 39.47% - - - 1.65 -65.21% - - 39.47% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 59.63% 100.00% 40.37% - - - 1.68 -67.71% - - 40.37% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 59.63% 100.00% 40.37% - - - 1.68 -67.71% - - 40.37% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 41.63% 100.00% 58.37% - - - 2.40 -140.22% - - 58.37% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIURETANO MARCA DYMONIC 100
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.03% 56.10% 100.00% 43.90% - - - 1.78 -78.27% - - 43.90% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.03% 56.10% 100.00% 43.90% - - - 1.78 -78.27% - - 43.90% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.03% 56.10% 100.00% 43.90% - - - 1.78 -78.27% - - 43.90% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.03% 56.10% 100.00% 43.90% - - - 1.78 -78.27% - - 43.90% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 431.40% 0.00% -431.40% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 431.40% 0.00% -431.40% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 431.40% 0.00% -431.40% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 19.35% 0.00% -19.35% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 55.75% 0.00% -55.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 51.64% 0.00% -51.64% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 80.72% 0.00% -80.72% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 148.15% 0.00% -148.15% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 83.81% 100.00% 16.19% - - - 1.19 -19.31% - - 16.19% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 99.94% 100.00% 0.06% - - - 1.00 -0.06% - - 0.06% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.10% 116.18% 100.00% -16.18% - - - 0.86 13.93% - - -16.18% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.10% 116.18% 100.00% -16.18% - - - 0.86 13.93% - - -16.18% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 194800.19% 100.00% -194700.19% - - - 0.00 99.95% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3668.67 -366767.13% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 54685.07% 100.00% -54585.07% - - - 0.00 99.82% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1520.08 -151908.13% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24634.10 -2463310.13% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 74.52% 100.00% 25.48% - - - 1.34 -34.19% - - 25.48% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 1216.00% 100.00% -1116.00% - - - 0.08 91.78% - - -1116.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 1216.00% 100.00% -1116.00% - - - 0.08 91.78% - - -1116.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 261.40% 100.00% -161.40% - - - 0.38 61.74% - - -161.40% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 37.36 -3636.13% - - 97.32% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 963.94% 100.00% -863.94% - - - 0.10 89.63% - - -863.94% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 205.55% 100.00% -105.55% - - - 0.49 51.35% - - -105.55% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 97.49 -9649.13% - - 98.97% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 79.08% 100.00% 20.92% - - - 1.26 -26.45% - - 20.92% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 4617.51% 100.00% -4517.51% - - - 0.02 97.83% - - -4517.51% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 50.65% 100.00% 49.35% - - - 1.97 -97.45% - - 49.35% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 16.90% 100.00% 83.10% - - - 5.92 -491.78% - - 83.10% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.14 -2414.13% - - 96.02% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 3858.49% 100.00% -3758.49% - - - 0.03 97.41% - - -3758.49% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1100.59% 100.00% -1000.59% - - - 0.09 90.91% - - -1000.59% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 141.57% 100.00% -41.57% - - - 0.71 29.36% - - -41.57% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 113.29% 100.00% -13.29% - - - 0.88 11.73% - - -13.29% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 415.91% 100.00% -315.91% - - - 0.24 75.96% - - -315.91% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1743.99 -174299.13% - - 99.94% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 7.21% 100.00% 92.79% - - - 13.86 -1286.46% - - 92.79% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 37.98% 100.00% 62.02% - - - 2.63 -163.28% - - 62.02% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 876.76 -87576.13% - - 99.89% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 8"
- - - - - - 0.00% 0.00% 441.97% 100.00% -341.97% - - - 0.23 77.37% - - -341.97% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 20.48 -1948.13% - - 95.12% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.73 -2273.13% - - 95.79% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.73 -2273.13% - - 95.79% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 53.73 -5273.26% - - 98.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 33.08 -3208.13% - - 96.98% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 20.65 -1965.13% - - 95.16% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 694.69 -69369.13% - - 99.86% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 694.69 -69369.13% - - 99.86% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1679.88 -167888.13% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1679.88 -167888.13% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9309.46 -930846.26% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 94.57 -9357.13% - - 98.94% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9214.89 -921389.13% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 169.88 -16888.13% - - 99.41% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 169.88 -16888.13% - - 99.41% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 169.88 -16888.13% - - 99.41% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 99.63% 100.00% 0.37% - - - 1.00 -0.37% - - 0.37% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 154.89% 100.00% -54.89% - - - 0.65 35.44% - - -54.89% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 16551.11% 100.00% -16451.11% - - - 0.01 99.40% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 367.20% 100.00% -267.20% - - - 0.27 72.77% - - -267.20% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 630.74% 100.00% -530.74% - - - 0.16 84.15% - - -530.74% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 178.75% 100.00% -78.75% - - - 0.56 44.06% - - -78.75% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 171.15% 100.00% -71.15% - - - 0.58 41.57% - - -71.15% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 139.23% 100.00% -39.23% - - - 0.72 28.18% - - -39.23% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 119.77% 100.00% -19.77% - - - 0.83 16.51% - - -19.77% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 64.43% 100.00% 35.57% - - - 1.55 -55.20% - - 35.57% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 292.11% 100.00% -192.11% - - - 0.34 65.77% - - -192.11% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 220.72% 100.00% -120.72% - - - 0.45 54.69% - - -120.72% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 337.18% 100.00% -237.18% - - - 0.30 70.34% - - -237.18% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 38.39% 100.00% 61.61% - - - 2.60 -160.47% - - 61.61% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 38.39% 100.00% 61.61% - - - 2.60 -160.47% - - 61.61% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 78.63% 100.00% 21.37% - - - 1.27 -27.18% - - 21.37% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 147.19% 100.00% -47.19% - - - 0.68 32.06% - - -47.19% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 213.89% 100.00% -113.89% - - - 0.47 53.25% - - -113.89% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 111.91% 100.00% -11.91% - - - 0.89 10.64% - - -11.91% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 70.85% 100.00% 29.15% - - - 1.41 -41.14% - - 29.15% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 100.34% 100.00% -0.34% - - - 1.00 0.34% - - -0.34% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 92.79% 100.00% 7.21% - - - 1.08 -7.77% - - 7.21% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.07% 100.00% 62.93% - - - 2.70 -169.75% - - 62.93% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 6.80% 100.00% 93.20% - - - 14.70 -1369.75% - - 93.20% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 6.80% 100.00% 93.20% - - - 14.70 -1369.75% - - 93.20% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 60.59% 100.00% 39.41% - - - 1.65 -65.04% - - 39.41% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 110.60% 100.00% -10.60% - - - 0.90 9.58% - - -10.60% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 51525.45% 100.00% -51425.45% - - - 0.00 99.81% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 134.51% 100.00% -34.51% - - - 0.74 25.66% - - -34.51% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 106.96% 100.00% -6.96% - - - 0.93 6.51% - - -6.96% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.05% 100.00% 27.95% - - - 1.39 -38.80% - - 27.95% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 287.01% 100.00% -187.01% - - - 0.35 65.16% - - -187.01% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 267.12% 100.00% -167.12% - - - 0.37 62.56% - - -167.12% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 168.34% 100.00% -68.34% - - - 0.59 40.59% - - -68.34% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 888.13% 100.00% -788.13% - - - 0.11 88.74% - - -788.13% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 122.34% 100.00% -22.34% - - - 0.82 18.26% - - -22.34% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 12.18 -1118.00% - - 91.79% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 3.89% 100.00% 96.11% - - - 25.69 -2469.47% - - 96.11% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 3.89% 100.00% 96.11% - - - 25.69 -2469.47% - - 96.11% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.24% 50.38% 86.05% 35.67% - - - 1.71 -70.82% - - 41.46% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 97.96% 88.00% -9.96% - - - 0.90 10.17% - - -11.32% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.12% 101.89% 88.00% -13.89% - - - 0.86 13.63% - - -15.78% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 235.05% 88.00% -147.05% - - - 0.37 62.56% - - -167.10% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 242.42% 88.00% -154.42% - - - 0.36 63.70% - - -175.48% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 227.68% 88.00% -139.68% - - - 0.39 61.35% - - -158.72% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.12% 98.86% 88.00% -10.86% - - - 0.89 10.99% - - -12.35% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.12% 98.86% 88.00% -10.86% - - - 0.89 10.99% - - -12.35% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 1310.26 -130925.84% - - 99.92% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 1310.26 -130925.84% - - 99.92% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 1310.26 -130925.84% - - 99.92% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.12% 0.15% 84.00% 83.85% - - - 564.28 -56328.10% - - 99.82% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.01% 1.57% 84.00% 82.43% - - - 53.52 -5251.75% - - 98.13% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 4.33% 84.00% 79.67% - - - 19.39 -1838.81% - - 94.84% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 4.33% 84.00% 79.67% - - - 19.39 -1838.81% - - 94.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.01% 0.00% 84.00% 84.00% - - - 1858.35 -185734.60% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.01% 0.00% 84.00% 84.00% - - - 1858.35 -185734.60% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.11% 0.00% 84.00% 84.00% - - - 27811.07 -2781007.00% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.11% 0.00% 84.00% 84.00% - - - 27811.07 -2781007.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.11% 0.00% 84.00% 84.00% - - - 27811.07 -2781007.00% - - 100.00% - 0.00%
CASA # 11
- - - - - - 1.30% 1.25% 97.48% 98.87% 1.39% - - - 1.01 -1.43% - - 1.41% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 116.32% 100.00% -16.32% - - - 0.86 14.03% - - -16.32% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 355.66% 100.00% -255.66% - - - 0.28 71.88% - - -255.66% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 355.66% 100.00% -255.66% - - - 0.28 71.88% - - -255.66% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 355.66% 100.00% -255.66% - - - 0.28 71.88% - - -255.66% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 203.84% 100.00% -103.84% - - - 0.49 50.94% - - -103.84% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 202.96% 100.00% -102.96% - - - 0.49 50.73% - - -102.96% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 108.42% 100.00% -8.42% - - - 0.92 7.77% - - -8.42% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 108.42% 100.00% -8.42% - - - 0.92 7.77% - - -8.42% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 174.57% 100.00% -74.57% - - - 0.57 42.72% - - -74.57% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 85.75% 100.00% 14.25% - - - 1.17 -16.62% - - 14.25% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 85.75% 100.00% 14.25% - - - 1.17 -16.62% - - 14.25% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 49.75% 100.00% 50.25% - - - 2.01 -100.99% - - 50.25% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA MOUNTAIN FULL WEATHER CUBETA MATE COLOR BLANCO DE LINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA PROCOAT CUBETA MATE COLOR BLANCO DE LINEA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE EXTRA WHITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE DEEP
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 121.57% 100.00% -21.57% - - - 0.82 17.74% - - -21.57% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 100.00% -21.57% - - - 0.82 17.74% - - -21.57% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 111.69% 100.00% -11.69% - - - 0.90 10.47% - - -11.69% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 184.33% 100.00% -84.33% - - - 0.54 45.75% - - -84.33% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 158.97% 100.00% -58.97% - - - 0.63 37.10% - - -58.97% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 158.97% 100.00% -58.97% - - - 0.63 37.10% - - -58.97% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO CONTRAMARCO ENCHAPADO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 73.10% 100.00% 26.90% - - - 1.37 -36.80% - - 26.90% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 73.10% 100.00% 26.90% - - - 1.37 -36.80% - - 26.90% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 118.14% 100.00% -18.14% - - - 0.85 15.35% - - -18.14% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.15% 100.00% -3.15% - - - 0.97 3.06% - - -3.15% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 74.94% 100.00% 25.06% - - - 1.33 -33.43% - - 25.06% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 100.00% 67.70% - - - 3.10 -209.63% - - 67.70% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 89.59% 100.00% 10.41% - - - 1.12 -11.63% - - 10.41% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 81.14% 100.00% 18.86% - - - 1.23 -23.25% - - 18.86% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 81.14% 100.00% 18.86% - - - 1.23 -23.25% - - 18.86% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 81.14% 100.00% 18.86% - - - 1.23 -23.25% - - 18.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 77.78% 100.00% 22.22% - - - 1.29 -28.56% - - 22.22% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 77.78% 100.00% 22.22% - - - 1.29 -28.56% - - 22.22% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 77.78% 100.00% 22.22% - - - 1.29 -28.56% - - 22.22% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 77.78% 100.00% 22.22% - - - 1.29 -28.56% - - 22.22% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 45.65% 100.00% 54.35% - - - 2.19 -119.05% - - 54.35% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 131.54% 100.00% -31.54% - - - 0.76 23.98% - - -31.54% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 127.43% 100.00% -27.43% - - - 0.78 21.53% - - -27.43% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 99.89% 100.00% 0.11% - - - 1.00 -0.11% - - 0.11% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 80.72% 100.00% 19.28% - - - 1.24 -23.89% - - 19.28% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 148.15% 100.00% -48.15% - - - 0.67 32.50% - - -48.15% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 100.00% 3.30% - - - 1.03 -3.41% - - 3.30% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 42.88% 100.00% 57.12% - - - 2.33 -133.18% - - 57.12% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 97.68% 100.00% 2.32% - - - 1.02 -2.38% - - 2.32% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 130.72% 100.00% -30.72% - - - 0.76 23.50% - - -30.72% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 193.84% 100.00% -93.84% - - - 0.52 48.41% - - -93.84% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 148325.84% 100.00% -148225.84% - - - 0.00 99.93% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 243478.26% 100.00% -243378.26% - - - 0.00 99.96% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 717.48% 100.00% -617.48% - - - 0.14 86.06% - - -617.48% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 44898.80% 100.00% -44798.80% - - - 0.00 99.78% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 236.18% 100.00% -136.18% - - - 0.42 57.66% - - -136.18% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 192.31% 100.00% -92.31% - - - 0.52 48.00% - - -92.31% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 139.49% 100.00% -39.49% - - - 0.72 28.31% - - -39.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 54.16% 100.00% 45.84% - - - 1.85 -84.64% - - 45.84% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 132.31% 100.00% -32.31% - - - 0.76 24.42% - - -32.31% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 92.67% 100.00% 7.33% - - - 1.08 -7.91% - - 7.33% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.54% 100.00% 62.46% - - - 2.66 -166.39% - - 62.46% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 70.85% 100.00% 29.15% - - - 1.41 -41.14% - - 29.15% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 70.85% 100.00% 29.15% - - - 1.41 -41.14% - - 29.15% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 124.34% 100.00% -24.34% - - - 0.80 19.58% - - -24.34% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 137.68% 100.00% -37.68% - - - 0.73 27.37% - - -37.68% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 422.75% 100.00% -322.75% - - - 0.24 76.35% - - -322.75% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 160.27% 100.00% -60.27% - - - 0.62 37.61% - - -60.27% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 100.34% 100.00% -0.34% - - - 1.00 0.34% - - -0.34% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 120.06% 100.00% -20.06% - - - 0.83 16.71% - - -20.06% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 42.66% 100.00% 57.34% - - - 2.34 -134.39% - - 57.34% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 143.03% 100.00% -43.03% - - - 0.70 30.09% - - -43.03% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 187.77% 100.00% -87.77% - - - 0.53 46.74% - - -87.77% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL DE 2 1/2"X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA FINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO TABLAYESO DE 7 X 7/16" ROSCA FINA PUNTA CORRIENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 113.93% 100.00% -13.93% - - - 0.88 12.23% - - -13.93% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 113.93% 100.00% -13.93% - - - 0.88 12.23% - - -13.93% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 72.47% 100.00% 27.53% - - - 1.38 -37.99% - - 27.53% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 80.43% 100.00% 19.57% - - - 1.24 -24.33% - - 19.57% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 112.52% 100.00% -12.52% - - - 0.89 11.13% - - -12.52% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 14634.65% 100.00% -14534.65% - - - 0.01 99.32% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 2064.97% 100.00% -1964.97% - - - 0.05 95.16% - - -1964.97% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 233.98% 100.00% -133.98% - - - 0.43 57.26% - - -133.98% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 134.15% 100.00% -34.15% - - - 0.75 25.46% - - -34.15% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 73.72% 100.00% 26.28% - - - 1.36 -35.64% - - 26.28% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 125.31% 100.00% -25.31% - - - 0.80 20.20% - - -25.31% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 89.03% 100.00% 10.97% - - - 1.12 -12.33% - - 10.97% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.24% 100.00% 28.76% - - - 1.40 -40.37% - - 28.76% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 213.45% 100.00% -113.45% - - - 0.47 53.15% - - -113.45% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 211.59% 100.00% -111.59% - - - 0.47 52.74% - - -111.59% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 309.93% 100.00% -209.93% - - - 0.32 67.73% - - -209.93% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 183.80% 100.00% -83.80% - - - 0.54 45.59% - - -83.80% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1013.44% 100.00% -913.44% - - - 0.10 90.13% - - -913.44% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 101.47% 100.00% -1.47% - - - 0.99 1.45% - - -1.47% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 45.84% 100.00% 54.16% - - - 2.18 -118.13% - - 54.16% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 45.84% 100.00% 54.16% - - - 2.18 -118.13% - - 54.16% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 45.88% 100.00% 54.12% - - - 2.18 -117.95% - - 54.12% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 76.34% 100.00% 23.66% - - - 1.31 -30.99% - - 23.66% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 80.17% 100.00% 19.83% - - - 1.25 -24.74% - - 19.83% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 80.17% 100.00% 19.83% - - - 1.25 -24.74% - - 19.83% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 70.70% 100.00% 29.30% - - - 1.41 -41.44% - - 29.30% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 1713.55% 100.00% -1613.55% - - - 0.06 94.16% - - -1613.55% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 711.58% 100.00% -611.58% - - - 0.14 85.95% - - -611.58% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 711.58% 100.00% -611.58% - - - 0.14 85.95% - - -611.58% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 263.51% 100.00% -163.51% - - - 0.38 62.05% - - -163.51% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 205.78% 100.00% -105.78% - - - 0.49 51.40% - - -105.78% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 2616.83% 100.00% -2516.83% - - - 0.04 96.18% - - -2516.83% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 28.10% 100.00% 71.90% - - - 3.56 -255.82% - - 71.90% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 27.52% 100.00% 72.48% - - - 3.63 -263.44% - - 72.48% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 8.93% 100.00% 91.07% - - - 11.20 -1020.21% - - 91.07% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 2592.46% 100.00% -2492.46% - - - 0.04 96.14% - - -2492.46% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 60.31% 93.64% 33.33% - - - 1.55 -55.26% - - 35.59% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 101.43% 88.00% -13.43% - - - 0.87 13.24% - - -15.26% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 104.29% 88.00% -16.29% - - - 0.84 15.62% - - -18.51% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.19% 88.00% 81.81% - - - 14.21 -1321.46% - - 92.96% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 13.99% 100.00% 86.01% - - - 7.15 -614.90% - - 86.01% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 14.21% 100.00% 85.79% - - - 7.04 -603.71% - - 85.79% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 100.00% 93.42% - - - 15.20 -1420.37% - - 93.42% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 5
- - - - - - 1.30% 1.25% 96.12% 98.52% 2.40% - - - 1.02 -2.50% - - 2.44% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 97.56% 93.64% -3.92% - - - 0.96 4.02% - - -4.19% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 101.38% 88.00% -13.38% - - - 0.87 13.19% - - -15.20% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 104.29% 88.00% -16.29% - - - 0.84 15.62% - - -18.51% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 4.28% 88.00% 83.72% - - - 20.57 -1956.57% - - 95.14% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO PVC GRIS DE 1" X 3 MTS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VUELTA PVC GRIS DE 2"
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 93.26% 100.00% 6.74% - - - 1.07 -7.22% - - 6.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 95.86% 100.00% 4.14% - - - 1.04 -4.32% - - 4.14% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 85.81% 100.00% 14.19% - - - 1.17 -16.54% - - 14.19% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 85.81% 100.00% 14.19% - - - 1.17 -16.54% - - 14.19% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 100.00% 93.42% - - - 15.20 -1420.37% - - 93.42% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 103.05% 98.98% -4.07% - - - 0.96 3.95% - - -4.11% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 162.82% 100.00% -62.82% - - - 0.61 38.58% - - -62.82% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 134.93% 100.00% -34.93% - - - 0.74 25.89% - - -34.93% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 134.93% 100.00% -34.93% - - - 0.74 25.89% - - -34.93% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 98.93% 100.00% 1.07% - - - 1.01 -1.08% - - 1.07% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 2''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE EXTRA WHITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXCELLO WEATHER PERFECT LATEX MATE BASE DEEP
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 150.29% 100.00% -50.29% - - - 0.67 33.46% - - -50.29% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 150.29% 100.00% -50.29% - - - 0.67 33.46% - - -50.29% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 130.31% 100.00% -30.31% - - - 0.77 23.26% - - -30.31% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 153.15% 100.00% -53.15% - - - 0.65 34.71% - - -53.15% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 153.15% 100.00% -53.15% - - - 0.65 34.71% - - -53.15% - 0.00%
PEGATEC PLUS ADHESIVO PARA CERAMICA GRIS DE 20KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 475.62 -47462.00% - - 99.79% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 446.44 -44544.00% - - 99.78% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 100.00% 67.70% - - - 3.10 -209.63% - - 67.70% - 0.00%
PISO CERAMICO ANDORRA ACERO 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO GR 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA PLOMO 43X43
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA GRIS 20X66
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 87.30% 100.00% 12.70% - - - 1.15 -14.54% - - 12.70% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 51.04% 100.00% 48.96% - - - 1.96 -95.94% - - 48.96% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 51.04% 100.00% 48.96% - - - 1.96 -95.94% - - 48.96% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 121.57% 100.00% -21.57% - - - 0.82 17.74% - - -21.57% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 121.57% 100.00% -21.57% - - - 0.82 17.74% - - -21.57% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 103.69% 100.00% -3.69% - - - 0.96 3.56% - - -3.69% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 102.81% 100.00% -2.81% - - - 0.97 2.73% - - -2.81% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 102.81% 100.00% -2.81% - - - 0.97 2.73% - - -2.81% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 102.37% 100.00% -2.37% - - - 0.98 2.32% - - -2.37% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 20.87% 100.00% 79.13% - - - 4.79 -379.11% - - 79.13% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 60.14% 100.00% 39.86% - - - 1.66 -66.28% - - 39.86% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 56.04% 100.00% 43.96% - - - 1.78 -78.46% - - 43.96% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 354.38 -35338.00% - - 99.72% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 6.61% 100.00% 93.39% - - - 15.13 -1412.61% - - 93.39% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 500.50 -49950.00% - - 99.80% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 506.24 -50524.00% - - 99.80% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 100.00% 3.30% - - - 1.03 -3.41% - - 3.30% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 100.00% 100.00% - - - 1539.00 -153800.00% - - 99.94% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 525.19% 0.00% -525.19% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
THINNER
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 520.50% 0.00% -520.50% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 520.50% 0.00% -520.50% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 90.59% 100.00% 9.41% - - - 1.10 -10.39% - - 9.41% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 116.90% 100.00% -16.90% - - - 0.86 14.46% - - -16.90% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 164.43% 100.00% -64.43% - - - 0.61 39.19% - - -64.43% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 260.47% 100.00% -160.47% - - - 0.38 61.61% - - -160.47% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 242.92% 100.00% -142.92% - - - 0.41 58.83% - - -142.92% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 105.69% 100.00% -5.69% - - - 0.95 5.38% - - -5.69% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 56.78% 100.00% 43.22% - - - 1.76 -76.12% - - 43.22% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 98.33% 100.00% 1.67% - - - 1.02 -1.70% - - 1.67% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 81.56% 100.00% 18.44% - - - 1.23 -22.61% - - 18.44% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 842.97 -84197.00% - - 99.88% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 73.78% 100.00% 26.22% - - - 1.36 -35.53% - - 26.22% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 73.78% 100.00% 26.22% - - - 1.36 -35.53% - - 26.22% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 108.09% 100.00% -8.09% - - - 0.93 7.48% - - -8.09% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 106.50% 100.00% -6.50% - - - 0.94 6.10% - - -6.50% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 111.00% 100.00% -11.00% - - - 0.90 9.91% - - -11.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 13413.41% 100.00% -13313.41% - - - 0.01 99.25% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1167.62% 100.00% -1067.62% - - - 0.09 91.44% - - -1067.62% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 149.53% 100.00% -49.53% - - - 0.67 33.12% - - -49.53% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 148.83% 100.00% -48.83% - - - 0.67 32.81% - - -48.83% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 34.81% 100.00% 65.19% - - - 2.87 -187.30% - - 65.19% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 54.61% 100.00% 45.39% - - - 1.83 -83.13% - - 45.39% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 25.77% 100.00% 74.23% - - - 3.88 -288.01% - - 74.23% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1825.21 -182421.00% - - 99.95% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 187.77% 100.00% -87.77% - - - 0.53 46.74% - - -87.77% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL DE 2 1/2"X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA FINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO TABLAYESO DE 7 X 7/16" ROSCA FINA PUNTA CORRIENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 105.80% 100.00% -5.80% - - - 0.95 5.48% - - -5.80% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 105.80% 100.00% -5.80% - - - 0.95 5.48% - - -5.80% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 67.29% 100.00% 32.71% - - - 1.49 -48.60% - - 32.71% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 85.50% 100.00% 14.50% - - - 1.17 -16.96% - - 14.50% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 97.49% 100.00% 2.51% - - - 1.03 -2.57% - - 2.51% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 97.49% 100.00% 2.51% - - - 1.03 -2.57% - - 2.51% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 66.47% 100.00% 33.53% - - - 1.50 -50.45% - - 33.53% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 330.44% 100.00% -230.44% - - - 0.30 69.74% - - -230.44% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 194.81% 100.00% -94.81% - - - 0.51 48.67% - - -94.81% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 4595.45% 100.00% -4495.45% - - - 0.02 97.82% - - -4495.45% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 61.88% 100.00% 38.12% - - - 1.62 -61.61% - - 38.12% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 61.88% 100.00% 38.12% - - - 1.62 -61.61% - - 38.12% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 52.37% 100.00% 47.63% - - - 1.91 -90.95% - - 47.63% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 48.79% 100.00% 51.21% - - - 2.05 -104.95% - - 51.21% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 53.53% 100.00% 46.47% - - - 1.87 -86.83% - - 46.47% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1523.76% 100.00% -1423.76% - - - 0.07 93.44% - - -1423.76% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 202.91% 100.00% -102.91% - - - 0.49 50.72% - - -102.91% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 869.44 -86844.00% - - 99.88% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 72.39% 100.00% 27.61% - - - 1.38 -38.15% - - 27.61% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 99.75% 100.00% 0.25% - - - 1.00 -0.25% - - 0.25% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6157.64% 100.00% -6057.64% - - - 0.02 98.38% - - -6057.64% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 233.98% 100.00% -133.98% - - - 0.43 57.26% - - -133.98% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 124.56% 100.00% -24.56% - - - 0.80 19.72% - - -24.56% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 89.15% 100.00% 10.85% - - - 1.12 -12.17% - - 10.85% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.15% 100.00% 27.85% - - - 1.39 -38.61% - - 27.85% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 236.23% 100.00% -136.23% - - - 0.42 57.67% - - -136.23% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 211.59% 100.00% -111.59% - - - 0.47 52.74% - - -111.59% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 353.84% 100.00% -253.84% - - - 0.28 71.74% - - -253.84% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 183.78% 100.00% -83.78% - - - 0.54 45.59% - - -83.78% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 839.13% 100.00% -739.13% - - - 0.12 88.08% - - -739.13% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 92.39% 100.00% 7.61% - - - 1.08 -8.24% - - 7.61% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 43.08% 100.00% 56.92% - - - 2.32 -132.15% - - 56.92% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 43.08% 100.00% 56.92% - - - 2.32 -132.15% - - 56.92% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
CASA # 40
- - - - - - 1.30% 1.25% 87.26% 92.37% 5.11% - - - 1.06 -5.86% - - 5.54% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 123.83% 85.01% -38.82% - - - 0.69 31.35% - - -45.66% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 235.06% 100.00% -135.06% - - - 0.43 57.46% - - -135.06% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 235.06% 100.00% -135.06% - - - 0.43 57.46% - - -135.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 235.06% 100.00% -135.06% - - - 0.43 57.46% - - -135.06% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 493.16 -49216.00% - - 99.80% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 203.37% 100.00% -103.37% - - - 0.49 50.83% - - -103.37% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 201.82% 100.00% -101.82% - - - 0.50 50.45% - - -101.82% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 107.28% 100.00% -7.28% - - - 0.93 6.79% - - -7.28% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 107.28% 100.00% -7.28% - - - 0.93 6.79% - - -7.28% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 181.52% 100.00% -81.52% - - - 0.55 44.91% - - -81.52% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 181.52% 100.00% -81.52% - - - 0.55 44.91% - - -81.52% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 181.52% 100.00% -81.52% - - - 0.55 44.91% - - -81.52% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 181.52% 100.00% -81.52% - - - 0.55 44.91% - - -81.52% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 150.50% 100.00% -50.50% - - - 0.66 33.56% - - -50.50% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 231.49% 100.00% -131.49% - - - 0.43 56.80% - - -131.49% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 173.46% 100.00% -73.46% - - - 0.58 42.35% - - -73.46% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 173.46% 100.00% -73.46% - - - 0.58 42.35% - - -73.46% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 107.47% 100.00% -7.47% - - - 0.93 6.95% - - -7.47% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 107.47% 100.00% -7.47% - - - 0.93 6.95% - - -7.47% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 475.62 -47462.00% - - 99.79% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 87.08% 100.00% 12.92% - - - 1.15 -14.84% - - 12.92% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 446.44 -44544.00% - - 99.78% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.33% 100.00% 67.67% - - - 3.09 -209.29% - - 67.67% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 97.46% 100.00% 2.54% - - - 1.03 -2.61% - - 2.54% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 50.47% 100.00% 49.53% - - - 1.98 -98.15% - - 49.53% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 50.04% 100.00% 49.96% - - - 2.00 -99.83% - - 49.96% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 50.04% 100.00% 49.96% - - - 2.00 -99.83% - - 49.96% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 50.04% 100.00% 49.96% - - - 2.00 -99.83% - - 49.96% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 46.84% 100.00% 53.16% - - - 2.14 -113.51% - - 53.16% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 40.18% 100.00% 59.82% - - - 2.49 -148.89% - - 59.82% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 295.93% 0.00% -295.93% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPONJA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 293.46% 0.00% -293.46% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 293.46% 0.00% -293.46% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.56% 0.00% -1.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 4.51% 0.00% -4.51% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 0.40% 0.00% -0.40% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 73.05% 100.00% 26.95% - - - 1.37 -36.88% - - 26.95% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 111.29% 100.00% -11.29% - - - 0.90 10.14% - - -11.29% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 159.81% 100.00% -59.81% - - - 0.63 37.43% - - -59.81% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 301.09% 100.00% -201.09% - - - 0.33 66.79% - - -201.09% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 190.37% 100.00% -90.37% - - - 0.53 47.47% - - -90.37% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
CONCRETO M004 PARA VIVIENDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 139.23% 100.00% -39.23% - - - 0.72 28.18% - - -39.23% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 119.77% 100.00% -19.77% - - - 0.83 16.51% - - -19.77% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 64.43% 100.00% 35.57% - - - 1.55 -55.20% - - 35.57% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 292.11% 100.00% -192.11% - - - 0.34 65.77% - - -192.11% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 220.72% 100.00% -120.72% - - - 0.45 54.69% - - -120.72% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 337.18% 100.00% -237.18% - - - 0.30 70.34% - - -237.18% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 58.56% 100.00% 41.44% - - - 1.71 -70.77% - - 41.44% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 58.56% 100.00% 41.44% - - - 1.71 -70.77% - - 41.44% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 89.18% 100.00% 10.82% - - - 1.12 -12.13% - - 10.82% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 115.18% 100.00% -15.18% - - - 0.87 13.18% - - -15.18% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 115.18% 100.00% -15.18% - - - 0.87 13.18% - - -15.18% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 47.07% 100.00% 52.93% - - - 2.12 -112.43% - - 52.93% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 4445.18% 100.00% -4345.18% - - - 0.02 97.75% - - -4345.18% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 168.27% 100.00% -68.27% - - - 0.59 40.57% - - -68.27% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 3840.61% 100.00% -3740.61% - - - 0.03 97.40% - - -3740.61% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 123.75% 100.00% -23.75% - - - 0.81 19.19% - - -23.75% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 123.75% 100.00% -23.75% - - - 0.81 19.19% - - -23.75% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 79.09% 100.00% 20.91% - - - 1.26 -26.44% - - 20.91% - 0.00%
DISCOS P/CORTE D/CONCRETO DE 9"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 54.96% 100.00% 45.04% - - - 1.82 -81.96% - - 45.04% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 53.52% 100.00% 46.48% - - - 1.87 -86.86% - - 46.48% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1980.90% 100.00% -1880.90% - - - 0.05 94.95% - - -1880.90% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 306.63% 100.00% -206.63% - - - 0.33 67.39% - - -206.63% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 546.70% 100.00% -446.70% - - - 0.18 81.71% - - -446.70% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 80.55% 100.00% 19.45% - - - 1.24 -24.15% - - 19.45% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 152.57% 100.00% -52.57% - - - 0.66 34.46% - - -52.57% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 213.89% 100.00% -113.89% - - - 0.47 53.25% - - -113.89% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 124.59% 100.00% -24.59% - - - 0.80 19.74% - - -24.59% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 70.85% 100.00% 29.15% - - - 1.41 -41.14% - - 29.15% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 93.17% 100.00% 6.83% - - - 1.07 -7.33% - - 6.83% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 92.80% 100.00% 7.20% - - - 1.08 -7.76% - - 7.20% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.07% 100.00% 62.93% - - - 2.70 -169.75% - - 62.93% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 4.87% 100.00% 95.13% - - - 20.52 -1952.35% - - 95.13% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 4.87% 100.00% 95.13% - - - 20.52 -1952.35% - - 95.13% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 27.29% 100.00% 72.71% - - - 3.66 -266.49% - - 72.71% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 48.00% 100.00% 52.00% - - - 2.08 -108.34% - - 52.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 27083.64% 100.00% -26983.64% - - - 0.00 99.63% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 264.70% 100.00% -164.70% - - - 0.38 62.22% - - -164.70% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 133.71% 100.00% -33.71% - - - 0.75 25.21% - - -33.71% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 107.03% 100.00% -7.03% - - - 0.93 6.57% - - -7.03% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 124.56% 100.00% -24.56% - - - 0.80 19.72% - - -24.56% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 284.53% 100.00% -184.53% - - - 0.35 64.85% - - -184.53% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 267.12% 100.00% -167.12% - - - 0.37 62.56% - - -167.12% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 144.75% 100.00% -44.75% - - - 0.69 30.92% - - -44.75% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 889.54% 100.00% -789.54% - - - 0.11 88.76% - - -789.54% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 12.18 -1118.00% - - 91.79% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 0.00% 100.00% 100.00% - - - 19933.17 -1993217.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 3.89% 100.00% 96.11% - - - 25.69 -2469.47% - - 96.11% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 3.89% 100.00% 96.11% - - - 25.69 -2469.47% - - 96.11% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 54.40% 86.12% 31.72% - - - 1.58 -58.30% - - 36.83% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 102.55% 88.00% -14.55% - - - 0.86 14.19% - - -16.53% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 105.40% 88.00% -17.40% - - - 0.83 16.51% - - -19.78% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 7.31% 88.00% 80.69% - - - 12.03 -1103.33% - - 91.69% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE GALVANIZADO CALIBRE 10
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.17% 84.00% 83.83% - - - 506.12 -50511.66% - - 99.80% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 5.70% 84.00% 78.30% - - - 14.74 -1374.13% - - 93.22% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
CASA # 28
- - - - - - 1.30% 1.25% 92.83% 100.00% 7.17% - - - 1.08 -7.72% - - 7.17% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 105.49% 100.00% -5.49% - - - 0.95 5.20% - - -5.49% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 133.16% 100.00% -33.16% - - - 0.75 24.90% - - -33.16% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 174.25% 100.00% -74.25% - - - 0.57 42.61% - - -74.25% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 218.44% 100.00% -118.44% - - - 0.46 54.22% - - -118.44% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE BOMBEO CONVENCIONAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION CON PLUMA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 167.06% 100.00% -67.06% - - - 0.60 40.14% - - -67.06% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 123.09% 100.00% -23.09% - - - 0.81 18.76% - - -23.09% - 0.00%
CAL
- - - - - - 0.00% 0.00% 25.95% 100.00% 74.05% - - - 3.85 -285.35% - - 74.05% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 6104.82% 100.00% -6004.82% - - - 0.02 98.36% - - -6004.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 119.09% 100.00% -19.09% - - - 0.84 16.03% - - -19.09% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 67.24% 100.00% 32.76% - - - 1.49 -48.71% - - 32.76% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 87.12% 100.00% 12.88% - - - 1.15 -14.78% - - 12.88% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.14% 100.00% -27.14% - - - 0.79 21.34% - - -27.14% - 0.00%
CLAVO DE LAMINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 4" X 4" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 99.34% 100.00% 0.66% - - - 1.01 -0.66% - - 0.66% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 99.34% 100.00% 0.66% - - - 1.01 -0.66% - - 0.66% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 115.68% 100.00% -15.68% - - - 0.86 13.55% - - -15.68% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 159.63% 100.00% -59.63% - - - 0.63 37.36% - - -59.63% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 159.63% 100.00% -59.63% - - - 0.63 37.36% - - -59.63% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 44.18% 100.00% 55.82% - - - 2.26 -126.36% - - 55.82% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 1038.19% 100.00% -938.19% - - - 0.10 90.37% - - -938.19% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
MALLA DE REFUERZO 0.97X45.70 (44.32MST)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 184.37% 100.00% -84.37% - - - 0.54 45.76% - - -84.37% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 89.02% 100.00% 10.98% - - - 1.12 -12.33% - - 10.98% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 1152.21% 100.00% -1052.21% - - - 0.09 91.32% - - -1052.21% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 110.43% 100.00% -10.43% - - - 0.91 9.45% - - -10.43% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 92.82% 100.00% 7.18% - - - 1.08 -7.74% - - 7.18% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 92.82% 100.00% 7.18% - - - 1.08 -7.74% - - 7.18% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 6.61% 100.00% 93.39% - - - 15.14 -1413.71% - - 93.39% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 14.28% 100.00% 85.72% - - - 7.00 -600.17% - - 85.72% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 681.89% 100.00% -581.89% - - - 0.15 85.33% - - -581.89% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA DE BROCA 37709 DE 7X7X16
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 1 5/8" X 10' (CAL 26)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 113.56% 100.00% -13.56% - - - 0.88 11.94% - - -13.56% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 146.07% 100.00% -46.07% - - - 0.68 31.54% - - -46.07% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 342666.67% 100.00% -342566.67% - - - 0.00 99.97% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 7527.53% 100.00% -7427.53% - - - 0.01 98.67% - - -7427.53% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 520.69% 100.00% -420.69% - - - 0.19 80.79% - - -420.69% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 150.71% 100.00% -50.71% - - - 0.66 33.65% - - -50.71% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 136.26% 100.00% -36.26% - - - 0.73 26.61% - - -36.26% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 46.11% 100.00% 53.89% - - - 2.17 -116.88% - - 53.89% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 254.62% 100.00% -154.62% - - - 0.39 60.73% - - -154.62% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 247.30% 100.00% -147.30% - - - 0.40 59.56% - - -147.30% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 373.47% 100.00% -273.47% - - - 0.27 73.22% - - -273.47% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 134.82% 100.00% -34.82% - - - 0.74 25.83% - - -34.82% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 69.51% 100.00% 30.49% - - - 1.44 -43.86% - - 30.49% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.94% 100.00% 20.06% - - - 1.25 -25.09% - - 20.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.94% 100.00% 20.06% - - - 1.25 -25.09% - - 20.06% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 62.98% 100.00% 37.02% - - - 1.59 -58.78% - - 37.02% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 81.93% 100.00% 18.07% - - - 1.22 -22.06% - - 18.07% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 115.73% 100.00% -15.73% - - - 0.86 13.60% - - -15.73% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 51515.93% 100.00% -51415.93% - - - 0.00 99.81% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EPOXICO EBOND 580 MV
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 123.31% 100.00% -23.31% - - - 0.81 18.91% - - -23.31% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 111.76% 100.00% -11.76% - - - 0.89 10.52% - - -11.76% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 73.09% 100.00% 26.91% - - - 1.37 -36.82% - - 26.91% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 92.27% 100.00% 7.73% - - - 1.08 -8.38% - - 7.73% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 88.12% 100.00% 11.88% - - - 1.13 -13.48% - - 11.88% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 61.61% 100.00% 38.39% - - - 1.62 -62.32% - - 38.39% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 158.71% 100.00% -58.71% - - - 0.63 36.99% - - -58.71% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.36 -14736.00% - - 99.33% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 177.89% 100.00% -77.89% - - - 0.56 43.79% - - -77.89% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 107.57% 100.00% -7.57% - - - 0.93 7.04% - - -7.57% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 329.15% 100.00% -229.15% - - - 0.30 69.62% - - -229.15% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLANCHA DE THERMOPOR DE 2*50*100 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 45.38% 100.00% 54.62% - - - 2.20 -120.36% - - 54.62% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 45.38% 100.00% 54.62% - - - 2.20 -120.36% - - 54.62% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 92.67% 100.00% 7.33% - - - 1.08 -7.92% - - 7.33% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 642.86% 100.00% -542.86% - - - 0.16 84.44% - - -542.86% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 631.10% 100.00% -531.10% - - - 0.16 84.15% - - -531.10% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 631.10% 100.00% -531.10% - - - 0.16 84.15% - - -531.10% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 12' TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIA VIDRIO LIQUIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DETERGENTE ESPUMIL 1000 GRS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESINFECTANTE OLIMPO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 120.96% 100.00% -20.96% - - - 0.83 17.33% - - -20.96% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 178.25% 100.00% -78.25% - - - 0.56 43.90% - - -78.25% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 178.25% 100.00% -78.25% - - - 0.56 43.90% - - -78.25% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 178.25% 100.00% -78.25% - - - 0.56 43.90% - - -78.25% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 90.53% 100.00% 9.47% - - - 1.10 -10.46% - - 9.47% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 90.53% 100.00% 9.47% - - - 1.10 -10.46% - - 9.47% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 118.14% 100.00% -18.14% - - - 0.85 15.35% - - -18.14% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 86.98% 100.00% 13.02% - - - 1.15 -14.96% - - 13.02% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.08% 100.00% -3.08% - - - 0.97 2.99% - - -3.08% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 84.23% 100.00% 15.77% - - - 1.19 -18.72% - - 15.77% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 31.22% 100.00% 68.78% - - - 3.20 -220.31% - - 68.78% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 105.15% 100.00% -5.15% - - - 0.95 4.89% - - -5.15% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 95.92% 100.00% 4.08% - - - 1.04 -4.25% - - 4.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 100.14% 100.00% -0.14% - - - 1.00 0.14% - - -0.14% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 100.14% 100.00% -0.14% - - - 1.00 0.14% - - -0.14% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 100.14% 100.00% -0.14% - - - 1.00 0.14% - - -0.14% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 100.14% 100.00% -0.14% - - - 1.00 0.14% - - -0.14% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 92.92% 100.00% 7.08% - - - 1.08 -7.62% - - 7.08% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 69.49% 100.00% 30.51% - - - 1.44 -43.91% - - 30.51% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 69.49% 100.00% 30.51% - - - 1.44 -43.91% - - 30.51% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 29.53% 100.00% 70.47% - - - 3.39 -238.68% - - 70.47% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPERMEABILIZANTE FASTYL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 79.96% 100.00% 20.04% - - - 1.25 -25.06% - - 20.04% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICONE SISTA 280ML BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 47.69% 100.00% 52.31% - - - 2.10 -109.71% - - 52.31% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 132.90% 100.00% -32.90% - - - 0.75 24.76% - - -32.90% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 127.43% 100.00% -27.43% - - - 0.78 21.53% - - -27.43% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 193.01% 100.00% -93.01% - - - 0.52 48.19% - - -93.01% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 110.09% 100.00% -10.09% - - - 0.91 9.17% - - -10.09% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 286.43% 100.00% -186.43% - - - 0.35 65.09% - - -186.43% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 100.00% 3.30% - - - 1.03 -3.41% - - 3.30% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 129.63% 100.00% -29.63% - - - 0.77 22.86% - - -29.63% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 2''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 2.39% 100.00% 97.61% - - - 41.81 -4080.85% - - 97.61% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 2.39% 100.00% 97.61% - - - 41.81 -4080.85% - - 97.61% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.91% 100.00% 53.09% - - - 2.13 -113.18% - - 53.09% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 2''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 35.25% 100.00% 64.75% - - - 2.84 -183.67% - - 64.75% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 59.06% 100.00% 40.94% - - - 1.69 -69.31% - - 40.94% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.13% 100.00% -0.13% - - - 1.00 0.13% - - -0.13% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 100.00% -3.14% - - - 0.97 3.04% - - -3.14% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 12.79% 100.00% 87.21% - - - 7.82 -681.64% - - 87.21% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 12.92% 100.00% 87.08% - - - 7.74 -673.70% - - 87.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 8.42% 100.00% 91.58% - - - 11.88 -1087.76% - - 91.58% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIPLE CORRIDO DE 1/2" X 1" HG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COPLA HG DE 1/2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 26
- - - - - - 1.30% 1.26% 90.77% 100.00% 9.23% - - - 1.10 -10.17% - - 9.23% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 100.46% 100.00% -0.46% - - - 1.00 0.46% - - -0.46% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 123.95% 100.00% -23.95% - - - 0.81 19.33% - - -23.95% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 149.34% 100.00% -49.34% - - - 0.67 33.04% - - -49.34% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 64060.67% 100.00% -63960.67% - - - 0.00 99.84% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 207.49% 100.00% -107.49% - - - 0.48 51.81% - - -107.49% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 109.17% 100.00% -9.17% - - - 0.92 8.40% - - -9.17% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 46.39% 100.00% 53.61% - - - 2.16 -115.56% - - 53.61% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 95.99% 100.00% 4.01% - - - 1.04 -4.17% - - 4.01% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 95.43% 100.00% 4.57% - - - 1.05 -4.79% - - 4.57% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.59% 100.00% 62.41% - - - 2.66 -166.06% - - 62.41% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 107.53% 100.00% -7.53% - - - 0.93 7.00% - - -7.53% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 107.53% 100.00% -7.53% - - - 0.93 7.00% - - -7.53% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 182.55% 100.00% -82.55% - - - 0.55 45.22% - - -82.55% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 111.34% 100.00% -11.34% - - - 0.90 10.18% - - -11.34% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 145.64% 100.00% -45.64% - - - 0.69 31.34% - - -45.64% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 307866.67% 100.00% -307766.67% - - - 0.00 99.97% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2522.52% 100.00% -2422.52% - - - 0.04 96.04% - - -2422.52% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 387.24% 100.00% -287.24% - - - 0.26 74.18% - - -287.24% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 150.79% 100.00% -50.79% - - - 0.66 33.68% - - -50.79% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 136.26% 100.00% -36.26% - - - 0.73 26.61% - - -36.26% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 40.19% 100.00% 59.81% - - - 2.49 -148.84% - - 59.81% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 252.73% 100.00% -152.73% - - - 0.40 60.43% - - -152.73% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 255.78% 100.00% -155.78% - - - 0.39 60.90% - - -155.78% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 280.76% 100.00% -180.76% - - - 0.36 64.38% - - -180.76% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 147.55% 100.00% -47.55% - - - 0.68 32.23% - - -47.55% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 122.83% 100.00% -22.83% - - - 0.81 18.58% - - -22.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 75.48% 100.00% 24.52% - - - 1.32 -32.49% - - 24.52% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 75.48% 100.00% 24.52% - - - 1.32 -32.49% - - 24.52% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 62.98% 100.00% 37.02% - - - 1.59 -58.78% - - 37.02% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 94.87% 100.00% 5.13% - - - 1.05 -5.40% - - 5.13% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 139.37% 100.00% -39.37% - - - 0.72 28.25% - - -39.37% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 21789.09% 100.00% -21689.09% - - - 0.00 99.54% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 20231.86% 100.00% -20131.86% - - - 0.00 99.51% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 392.41% 100.00% -292.41% - - - 0.25 74.52% - - -292.41% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 1465.47% 100.00% -1365.47% - - - 0.07 93.18% - - -1365.47% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 308.99% 100.00% -208.99% - - - 0.32 67.64% - - -208.99% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 186.93% 100.00% -86.93% - - - 0.53 46.50% - - -86.93% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 180.94% 100.00% -80.94% - - - 0.55 44.73% - - -80.94% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 88.34% 100.00% 11.66% - - - 1.13 -13.19% - - 11.66% - 0.00%
ACERO DE 1/2 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 9.69% 100.00% 90.31% - - - 10.31 -931.47% - - 90.31% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 185.93% 100.00% -85.93% - - - 0.54 46.21% - - -85.93% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.27% 100.00% -109.27% - - - 0.48 52.21% - - -109.27% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 407.89% 100.00% -307.89% - - - 0.25 75.48% - - -307.89% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 227.84% 100.00% -127.84% - - - 0.44 56.11% - - -127.84% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 619.67% 100.00% -519.67% - - - 0.16 83.86% - - -519.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 99.24% 100.00% 0.76% - - - 1.01 -0.77% - - 0.76% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLANCHA DE THERMOPOR DE 2*50*100 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 43.98% 100.00% 56.02% - - - 2.27 -127.40% - - 56.02% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 43.98% 100.00% 56.02% - - - 2.27 -127.40% - - 56.02% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 46.59% 100.00% 53.41% - - - 2.15 -114.65% - - 53.41% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FLETES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 85.20% 100.00% 14.80% - - - 1.17 -17.37% - - 14.80% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 102.43% 100.00% -2.43% - - - 0.98 2.37% - - -2.43% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 102.43% 100.00% -2.43% - - - 0.98 2.37% - - -2.43% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 57.51% 100.00% 42.49% - - - 1.74 -73.89% - - 42.49% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2546.80% 100.00% -2446.80% - - - 0.04 96.07% - - -2446.80% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
MALLA DE REFUERZO 0.97X45.70 (44.32MST)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 262.37% 100.00% -162.37% - - - 0.38 61.89% - - -162.37% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 262.37% 100.00% -162.37% - - - 0.38 61.89% - - -162.37% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 257.87% 100.00% -157.87% - - - 0.39 61.22% - - -157.87% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 1146.93% 100.00% -1046.93% - - - 0.09 91.28% - - -1046.93% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 145.78% 100.00% -45.78% - - - 0.69 31.40% - - -45.78% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 730.48% 100.00% -630.48% - - - 0.14 86.31% - - -630.48% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 5.82% 100.00% 94.18% - - - 17.17 -1617.24% - - 94.18% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCA DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULAS METALICAS DE 4" MANGO PLASTICO MARCA PUMA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 3.17% 100.00% 96.83% - - - 31.51 -3050.57% - - 96.83% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 248.91 -24791.00% - - 99.60% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA DE BROCA 37709 DE 7X7X16
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 1 5/8" X 10' (CAL 26)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.44% 93.13% 100.00% 6.87% - - - 1.07 -7.38% - - 6.87% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 509.44% 100.00% -409.44% - - - 0.20 80.37% - - -409.44% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 405.23% 100.00% -305.23% - - - 0.25 75.32% - - -305.23% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 405.23% 100.00% -305.23% - - - 0.25 75.32% - - -305.23% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCALERA DE ALUMINIO 2 BANDAS 5 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 5 TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 12' TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIA VIDRIO LIQUIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DETERGENTE ESPUMIL 1000 GRS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 137.15% 100.00% -37.15% - - - 0.73 27.09% - - -37.15% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 183.62% 100.00% -83.62% - - - 0.54 45.54% - - -83.62% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 168.70% 100.00% -68.70% - - - 0.59 40.72% - - -68.70% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 168.70% 100.00% -68.70% - - - 0.59 40.72% - - -68.70% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 112.46% 100.00% -12.46% - - - 0.89 11.08% - - -12.46% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 107.84% 100.00% -7.84% - - - 0.93 7.27% - - -7.84% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 118.14% 100.00% -18.14% - - - 0.85 15.35% - - -18.14% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 86.98% 100.00% 13.02% - - - 1.15 -14.96% - - 13.02% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.08% 100.00% -3.08% - - - 0.97 2.99% - - -3.08% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 84.23% 100.00% 15.77% - - - 1.19 -18.72% - - 15.77% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 31.22% 100.00% 68.78% - - - 3.20 -220.31% - - 68.78% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 112.50% 100.00% -12.50% - - - 0.89 11.11% - - -12.50% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 88.42% 100.00% 11.58% - - - 1.13 -13.10% - - 11.58% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 88.42% 100.00% 11.58% - - - 1.13 -13.10% - - 11.58% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 52.42% 100.00% 47.58% - - - 1.91 -90.77% - - 47.58% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA LATEX BLANCO TRADICIONAL INTERIOR E EXTERIOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLOR BLANCO LATEX PLUS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 100.51% 100.00% -0.51% - - - 0.99 0.51% - - -0.51% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 95.92% 100.00% 4.08% - - - 1.04 -4.25% - - 4.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MINI FELPAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPERMEABILIZANTE FASTYL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 100.09% 100.00% -0.09% - - - 1.00 0.09% - - -0.09% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 100.09% 100.00% -0.09% - - - 1.00 0.09% - - -0.09% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 100.09% 100.00% -0.09% - - - 1.00 0.09% - - -0.09% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 100.09% 100.00% -0.09% - - - 1.00 0.09% - - -0.09% - 0.00%
VENTANAS
- - - - - - 0.08% 0.09% 73.58% 100.00% 26.42% - - - 1.36 -35.90% - - 26.42% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.09% 73.58% 100.00% 26.42% - - - 1.36 -35.90% - - 26.42% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.09% 73.58% 100.00% 26.42% - - - 1.36 -35.90% - - 26.42% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.09% 73.58% 100.00% 26.42% - - - 1.36 -35.90% - - 26.42% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 49.29% 100.00% 50.71% - - - 2.03 -102.90% - - 50.71% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 136.33% 100.00% -36.33% - - - 0.73 26.65% - - -36.33% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 132.22% 100.00% -32.22% - - - 0.76 24.37% - - -32.22% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 193.01% 100.00% -93.01% - - - 0.52 48.19% - - -93.01% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 62.22% 100.00% 37.78% - - - 1.61 -60.71% - - 37.78% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 110.09% 100.00% -10.09% - - - 0.91 9.17% - - -10.09% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 286.43% 100.00% -186.43% - - - 0.35 65.09% - - -186.43% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 100.00% 3.30% - - - 1.03 -3.41% - - 3.30% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 129.63% 100.00% -29.63% - - - 0.77 22.86% - - -29.63% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 3.02% 100.00% 96.98% - - - 33.10 -3209.88% - - 96.98% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 3.02% 100.00% 96.98% - - - 33.10 -3209.88% - - 96.98% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 36.26% 100.00% 63.74% - - - 2.76 -175.82% - - 63.74% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 60.02% 100.00% 39.98% - - - 1.67 -66.62% - - 39.98% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.13% 100.00% -0.13% - - - 1.00 0.13% - - -0.13% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 100.00% -3.14% - - - 0.97 3.04% - - -3.14% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 14.82% 100.00% 85.18% - - - 6.75 -574.63% - - 85.18% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 15.10% 100.00% 84.90% - - - 6.62 -562.40% - - 84.90% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 5.70% 100.00% 94.30% - - - 17.55 -1654.91% - - 94.30% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 38
- - - - - - 1.30% 1.25% 80.04% 89.85% 9.81% - - - 1.12 -12.25% - - 10.91% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 84.28% 77.70% -6.58% - - - 0.92 7.80% - - -8.46% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 149.92% 100.00% -49.92% - - - 0.67 33.30% - - -49.92% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 149.92% 100.00% -49.92% - - - 0.67 33.30% - - -49.92% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 55.38% 100.00% 44.62% - - - 1.81 -80.56% - - 44.62% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 53.46% 100.00% 46.54% - - - 1.87 -87.05% - - 46.54% - 0.00%
SUBCONTRATO SERVICIOS MATERIALES Y MANO DE OBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 123.18% 100.00% -23.18% - - - 0.81 18.82% - - -23.18% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 184.72% 100.00% -84.72% - - - 0.54 45.87% - - -84.72% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 163.29% 100.00% -63.29% - - - 0.61 38.76% - - -63.29% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 163.29% 100.00% -63.29% - - - 0.61 38.76% - - -63.29% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 90.49% 100.00% 9.51% - - - 1.11 -10.51% - - 9.51% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 90.49% 100.00% 9.51% - - - 1.11 -10.51% - - 9.51% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 475.62 -47462.00% - - 99.79% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 446.44 -44544.00% - - 99.78% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 100.00% 67.70% - - - 3.10 -209.63% - - 67.70% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 85.68% 100.00% 14.32% - - - 1.17 -16.72% - - 14.32% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 100.00% 14.37% - - - 1.17 -16.78% - - 14.37% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 100.00% 14.37% - - - 1.17 -16.78% - - 14.37% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 85.63% 100.00% 14.37% - - - 1.17 -16.78% - - 14.37% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 70.39% 100.00% 29.61% - - - 1.42 -42.07% - - 29.61% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 100.00% 29.61% - - - 1.42 -42.07% - - 29.61% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 100.00% 29.61% - - - 1.42 -42.07% - - 29.61% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 70.39% 100.00% 29.61% - - - 1.42 -42.07% - - 29.61% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 41.96% 100.00% 58.04% - - - 2.38 -138.34% - - 58.04% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 41.96% 100.00% 58.04% - - - 2.38 -138.34% - - 58.04% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 41.96% 100.00% 58.04% - - - 2.38 -138.34% - - 58.04% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 41.96% 100.00% 58.04% - - - 2.38 -138.34% - - 58.04% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 16.40% 100.00% 83.60% - - - 6.10 -509.62% - - 83.60% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 16.40% 100.00% 83.60% - - - 6.10 -509.62% - - 83.60% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO SERVICIOS MATERIALES Y MANO DE OBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 72.77% 0.00% -72.77% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 72.77% 0.00% -72.77% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 72.77% 0.00% -72.77% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 19.53% 0.00% -19.53% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 56.26% 0.00% -56.26% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 52.15% 0.00% -52.15% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 80.72% 0.00% -80.72% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 148.15% 0.00% -148.15% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 36.00% 0.00% -36.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 86.34% 100.00% 13.66% - - - 1.16 -15.83% - - 13.66% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 115.04% 100.00% -15.04% - - - 0.87 13.08% - - -15.04% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 176.00% 100.00% -76.00% - - - 0.57 43.18% - - -76.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 349342.22% 100.00% -349242.22% - - - 0.00 99.97% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 423.44% 100.00% -323.44% - - - 0.24 76.38% - - -323.44% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 203.75% 100.00% -103.75% - - - 0.49 50.92% - - -103.75% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 139.29% 100.00% -39.29% - - - 0.72 28.20% - - -39.29% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 119.77% 100.00% -19.77% - - - 0.83 16.51% - - -19.77% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 64.43% 100.00% 35.57% - - - 1.55 -55.20% - - 35.57% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 292.11% 100.00% -192.11% - - - 0.34 65.77% - - -192.11% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 220.72% 100.00% -120.72% - - - 0.45 54.69% - - -120.72% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 337.18% 100.00% -237.18% - - - 0.30 70.34% - - -237.18% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 47.71% 100.00% 52.29% - - - 2.10 -109.58% - - 52.29% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 47.71% 100.00% 52.29% - - - 2.10 -109.58% - - 52.29% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 95.79% 100.00% 4.21% - - - 1.04 -4.40% - - 4.21% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 182.24% 100.00% -82.24% - - - 0.55 45.13% - - -82.24% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 213.89% 100.00% -113.89% - - - 0.47 53.25% - - -113.89% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 194.44% 100.00% -94.44% - - - 0.51 48.57% - - -94.44% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 70.85% 100.00% 29.15% - - - 1.41 -41.15% - - 29.15% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 206.05% 100.00% -106.05% - - - 0.49 51.47% - - -106.05% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 157.72% 100.00% -57.72% - - - 0.63 36.60% - - -57.72% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.07% 100.00% 62.93% - - - 2.70 -169.75% - - 62.93% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 4.87% 100.00% 95.13% - - - 20.52 -1952.35% - - 95.13% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 4.87% 100.00% 95.13% - - - 20.52 -1952.35% - - 95.13% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 80.91% 100.00% 19.09% - - - 1.24 -23.60% - - 19.09% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 98.61% 100.00% 1.39% - - - 1.01 -1.41% - - 1.39% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 98.61% 100.00% 1.39% - - - 1.01 -1.41% - - 1.39% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 52.40% 100.00% 47.60% - - - 1.91 -90.83% - - 47.60% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 213.58% 100.00% -113.58% - - - 0.47 53.18% - - -113.58% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 116.84% 100.00% -16.84% - - - 0.86 14.41% - - -16.84% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 4257.33% 100.00% -4157.33% - - - 0.02 97.65% - - -4157.33% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 61.88% 100.00% 38.12% - - - 1.62 -61.61% - - 38.12% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 61.88% 100.00% 38.12% - - - 1.62 -61.61% - - 38.12% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 56.63% 100.00% 43.37% - - - 1.77 -76.60% - - 43.37% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 53.52% 100.00% 46.48% - - - 1.87 -86.86% - - 46.48% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1980.90% 100.00% -1880.90% - - - 0.05 94.95% - - -1880.90% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 856.20% 100.00% -756.20% - - - 0.12 88.32% - - -756.20% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 546.70% 100.00% -446.70% - - - 0.18 81.71% - - -446.70% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.09% 100.00% 62.91% - - - 2.70 -169.63% - - 62.91% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 14.32% 100.00% 85.68% - - - 6.98 -598.31% - - 85.68% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 63.65% 100.00% 36.35% - - - 1.57 -57.10% - - 36.35% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 116.35% 100.00% -16.35% - - - 0.86 14.05% - - -16.35% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 57250.91% 100.00% -57150.91% - - - 0.00 99.83% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 4926.11% 100.00% -4826.11% - - - 0.02 97.97% - - -4826.11% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 242.74% 100.00% -142.74% - - - 0.41 58.80% - - -142.74% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 1''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 144.87% 100.00% -44.87% - - - 0.69 30.97% - - -44.87% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 106.96% 100.00% -6.96% - - - 0.93 6.51% - - -6.96% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 84.73% 100.00% 15.27% - - - 1.18 -18.02% - - 15.27% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 270.43% 100.00% -170.43% - - - 0.37 63.02% - - -170.43% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 265.57% 100.00% -165.57% - - - 0.38 62.35% - - -165.57% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 219.83% 100.00% -119.83% - - - 0.45 54.51% - - -119.83% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 879.09% 100.00% -779.09% - - - 0.11 88.62% - - -779.09% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 3.89% 100.00% 96.11% - - - 25.69 -2469.47% - - 96.11% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 3.89% 100.00% 96.11% - - - 25.69 -2469.47% - - 96.11% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 54.87% 86.12% 31.25% - - - 1.57 -56.96% - - 36.29% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 103.43% 88.00% -15.43% - - - 0.85 14.91% - - -17.53% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 106.47% 88.00% -18.47% - - - 0.83 17.34% - - -20.98% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 88.00% -12.00% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 2.06% 88.00% 85.94% - - - 42.65 -4165.01% - - 97.66% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.17% 84.00% 83.83% - - - 506.12 -50511.66% - - 99.80% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 5.70% 84.00% 78.30% - - - 14.74 -1374.13% - - 93.22% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
CASA # 29
- - - - - - 1.30% 1.25% 88.86% 100.00% 11.14% - - - 1.13 -12.54% - - 11.14% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 104.10% 100.00% -4.10% - - - 0.96 3.94% - - -4.10% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 144.79% 100.00% -44.79% - - - 0.69 30.93% - - -44.79% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 188.37% 100.00% -88.37% - - - 0.53 46.91% - - -88.37% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 188.37% 100.00% -88.37% - - - 0.53 46.91% - - -88.37% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 74.16% 100.00% 25.84% - - - 1.35 -34.84% - - 25.84% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 6170.50% 100.00% -6070.50% - - - 0.02 98.38% - - -6070.50% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 12444.44% 100.00% -12344.44% - - - 0.01 99.20% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 4346.63% 100.00% -4246.63% - - - 0.02 97.70% - - -4246.63% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 2272.46% 100.00% -2172.46% - - - 0.04 95.60% - - -2172.46% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MALLA DE REFUERZO 0.97X45.70 (44.32MST)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 232.04% 100.00% -132.04% - - - 0.43 56.90% - - -132.04% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 232.04% 100.00% -132.04% - - - 0.43 56.90% - - -132.04% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 205.43% 100.00% -105.43% - - - 0.49 51.32% - - -105.43% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 113.31% 100.00% -13.31% - - - 0.88 11.74% - - -13.31% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 4058.65% 100.00% -3958.65% - - - 0.02 97.54% - - -3958.65% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 87.34% 100.00% 12.66% - - - 1.14 -14.50% - - 12.66% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 4.64% 100.00% 95.36% - - - 21.57 -2056.88% - - 95.36% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 3.86% 100.00% 96.14% - - - 25.89 -2488.83% - - 96.14% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 248.91 -24791.00% - - 99.60% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 683.29% 100.00% -583.29% - - - 0.15 85.36% - - -583.29% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA FINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA DE BROCA 37709 DE 7X7X16
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO TABLAYESO DE 7 X 7/16" ROSCA FINA PUNTA CORRIENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 1 5/8" X 10' (CAL 26)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 2-1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 104.83% 100.00% -4.83% - - - 0.95 4.61% - - -4.83% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 129.66% 100.00% -29.66% - - - 0.77 22.87% - - -29.66% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 166533.33% 100.00% -166433.33% - - - 0.00 99.94% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 7527.53% 100.00% -7427.53% - - - 0.01 98.67% - - -7427.53% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 319.88% 100.00% -219.88% - - - 0.31 68.74% - - -219.88% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 134.82% 100.00% -34.82% - - - 0.74 25.83% - - -34.82% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 93.05% 100.00% 6.95% - - - 1.07 -7.47% - - 6.95% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 128.58% 100.00% -28.58% - - - 0.78 22.23% - - -28.58% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 94.33% 100.00% 5.67% - - - 1.06 -6.01% - - 5.67% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 39.56% 100.00% 60.44% - - - 2.53 -152.81% - - 60.44% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 254.03% 100.00% -154.03% - - - 0.39 60.63% - - -154.03% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 255.94% 100.00% -155.94% - - - 0.39 60.93% - - -155.94% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 371.35% 100.00% -271.35% - - - 0.27 73.07% - - -271.35% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.94% 100.00% 20.06% - - - 1.25 -25.09% - - 20.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.94% 100.00% 20.06% - - - 1.25 -25.09% - - 20.06% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 62.98% 100.00% 37.02% - - - 1.59 -58.78% - - 37.02% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 100.85% 100.00% -0.85% - - - 0.99 0.84% - - -0.85% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 132.12% 100.00% -32.12% - - - 0.76 24.31% - - -32.12% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 172.07% 100.00% -72.07% - - - 0.58 41.88% - - -72.07% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 118.28% 100.00% -18.28% - - - 0.85 15.46% - - -18.28% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 67.24% 100.00% 32.76% - - - 1.49 -48.71% - - 32.76% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 87.12% 100.00% 12.88% - - - 1.15 -14.78% - - 12.88% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.14% 100.00% -27.14% - - - 0.79 21.34% - - -27.14% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.59% 100.00% 62.41% - - - 2.66 -166.06% - - 62.41% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 75.04% 100.00% 24.96% - - - 1.33 -33.26% - - 24.96% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 75.04% 100.00% 24.96% - - - 1.33 -33.26% - - 24.96% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 155.64% 100.00% -55.64% - - - 0.64 35.75% - - -55.64% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 74.49% 100.00% 25.51% - - - 1.34 -34.25% - - 25.51% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 105.68% 100.00% -5.68% - - - 0.95 5.37% - - -5.68% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2778.33% 100.00% -2678.33% - - - 0.04 96.40% - - -2678.33% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 147.88% 100.00% -47.88% - - - 0.68 32.38% - - -47.88% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 92.80% 100.00% 7.20% - - - 1.08 -7.76% - - 7.20% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 74.42% 100.00% 25.58% - - - 1.34 -34.36% - - 25.58% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 360.94% 100.00% -260.94% - - - 0.28 72.29% - - -260.94% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 69.76% 100.00% 30.24% - - - 1.43 -43.36% - - 30.24% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 709.59% 100.00% -609.59% - - - 0.14 85.91% - - -609.59% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 230.20% 100.00% -130.20% - - - 0.43 56.56% - - -130.20% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 841.30% 100.00% -741.30% - - - 0.12 88.11% - - -741.30% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 123.31% 100.00% -23.31% - - - 0.81 18.91% - - -23.31% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 91.89% 100.00% 8.11% - - - 1.09 -8.83% - - 8.11% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 73.09% 100.00% 26.91% - - - 1.37 -36.82% - - 26.91% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLANCHA DE THERMOPOR DE 2*50*100 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 40.72% 100.00% 59.28% - - - 2.46 -145.56% - - 59.28% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 40.72% 100.00% 59.28% - - - 2.46 -145.56% - - 59.28% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 16.94% 100.00% 83.06% - - - 5.90 -490.29% - - 83.06% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 81.99% 100.00% 18.01% - - - 1.22 -21.97% - - 18.01% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 521.84% 100.00% -421.84% - - - 0.19 80.84% - - -421.84% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 495.58% 100.00% -395.58% - - - 0.20 79.82% - - -395.58% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 495.58% 100.00% -395.58% - - - 0.20 79.82% - - -395.58% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 12' TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIA VIDRIO LIQUIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DETERGENTE ESPUMIL 1000 GRS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESINFECTANTE OLIMPO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIQUIDO ATRAPA POLVO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 132.50% 100.00% -32.50% - - - 0.75 24.53% - - -32.50% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 150.12% 100.00% -50.12% - - - 0.67 33.39% - - -50.12% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 150.12% 100.00% -50.12% - - - 0.67 33.39% - - -50.12% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 150.12% 100.00% -50.12% - - - 0.67 33.39% - - -50.12% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 123.14% 100.00% -23.14% - - - 0.81 18.79% - - -23.14% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 117.34% 100.00% -17.34% - - - 0.85 14.78% - - -17.34% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 118.14% 100.00% -18.14% - - - 0.85 15.35% - - -18.14% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 86.98% 100.00% 13.02% - - - 1.15 -14.96% - - 13.02% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.37% 100.00% -3.37% - - - 0.97 3.26% - - -3.37% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 84.23% 100.00% 15.77% - - - 1.19 -18.72% - - 15.77% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 31.22% 100.00% 68.78% - - - 3.20 -220.31% - - 68.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 100.26% 100.00% -0.26% - - - 1.00 0.26% - - -0.26% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 95.92% 100.00% 4.08% - - - 1.04 -4.25% - - 4.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIURETANO MARCA DYMONIC 100
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 100.14% 100.00% -0.14% - - - 1.00 0.14% - - -0.14% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 100.14% 100.00% -0.14% - - - 1.00 0.14% - - -0.14% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 100.14% 100.00% -0.14% - - - 1.00 0.14% - - -0.14% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 100.14% 100.00% -0.14% - - - 1.00 0.14% - - -0.14% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 80.72% 100.00% 19.28% - - - 1.24 -23.89% - - 19.28% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 65.52% 100.00% 34.48% - - - 1.53 -52.62% - - 34.48% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 65.52% 100.00% 34.48% - - - 1.53 -52.62% - - 34.48% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 29.53% 100.00% 70.47% - - - 3.39 -238.68% - - 70.47% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 52.58% 100.00% 47.42% - - - 1.90 -90.18% - - 47.42% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 46.64% 100.00% 53.36% - - - 2.14 -114.42% - - 53.36% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 131.54% 100.00% -31.54% - - - 0.76 23.98% - - -31.54% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 127.43% 100.00% -27.43% - - - 0.78 21.53% - - -27.43% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 193.01% 100.00% -93.01% - - - 0.52 48.19% - - -93.01% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 110.09% 100.00% -10.09% - - - 0.91 9.17% - - -10.09% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 286.43% 100.00% -186.43% - - - 0.35 65.09% - - -186.43% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 100.00% 3.30% - - - 1.03 -3.41% - - 3.30% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 129.63% 100.00% -29.63% - - - 0.77 22.86% - - -29.63% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 1.51% 100.00% 98.49% - - - 66.20 -6519.75% - - 98.49% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 1.51% 100.00% 98.49% - - - 66.20 -6519.75% - - 98.49% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 32.17% 100.00% 67.83% - - - 3.11 -210.81% - - 67.83% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 31.86% 100.00% 68.14% - - - 3.14 -213.85% - - 68.14% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 31.86% 100.00% 68.14% - - - 3.14 -213.85% - - 68.14% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 31.86% 100.00% 68.14% - - - 3.14 -213.85% - - 68.14% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN SPRAY
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 61.15% 100.00% 38.85% - - - 1.64 -63.54% - - 38.85% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.13% 100.00% -0.13% - - - 1.00 0.13% - - -0.13% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 100.00% -3.14% - - - 0.97 3.04% - - -3.14% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 17.23% 100.00% 82.77% - - - 5.80 -480.47% - - 82.77% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 17.57% 100.00% 82.43% - - - 5.69 -469.05% - - 82.43% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 5.70% 100.00% 94.30% - - - 17.55 -1654.91% - - 94.30% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 23
- - - - - - 1.30% 1.26% 86.05% 100.00% 13.95% - - - 1.16 -16.21% - - 13.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 99.04% 100.00% 0.96% - - - 1.01 -0.97% - - 0.96% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 109.18% 100.00% -9.18% - - - 0.92 8.41% - - -9.18% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 146.36% 100.00% -46.36% - - - 0.68 31.67% - - -46.36% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 207.49% 100.00% -107.49% - - - 0.48 51.81% - - -107.49% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 110.27% 100.00% -10.27% - - - 0.91 9.31% - - -10.27% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 62.53% 100.00% 37.47% - - - 1.60 -59.92% - - 37.47% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 95.99% 100.00% 4.01% - - - 1.04 -4.17% - - 4.01% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 95.43% 100.00% 4.57% - - - 1.05 -4.79% - - 4.57% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 58.94% 100.00% 41.06% - - - 1.70 -69.67% - - 41.06% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 77.36% 100.00% 22.64% - - - 1.29 -29.27% - - 22.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 77.36% 100.00% 22.64% - - - 1.29 -29.27% - - 22.64% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 182.55% 100.00% -82.55% - - - 0.55 45.22% - - -82.55% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 107.15% 100.00% -7.15% - - - 0.93 6.67% - - -7.15% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 137.38% 100.00% -37.38% - - - 0.73 27.21% - - -37.38% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6706.71% 100.00% -6606.71% - - - 0.01 98.51% - - -6606.71% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 151.82% 100.00% -51.82% - - - 0.66 34.13% - - -51.82% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 137.99% 100.00% -37.99% - - - 0.72 27.53% - - -37.99% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 40.19% 100.00% 59.81% - - - 2.49 -148.83% - - 59.81% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 252.73% 100.00% -152.73% - - - 0.40 60.43% - - -152.73% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 255.82% 100.00% -155.82% - - - 0.39 60.91% - - -155.82% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 280.76% 100.00% -180.76% - - - 0.36 64.38% - - -180.76% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 143.47% 100.00% -43.47% - - - 0.70 30.30% - - -43.47% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 83.41% 100.00% 16.59% - - - 1.20 -19.89% - - 16.59% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 116.68% 100.00% -16.68% - - - 0.86 14.29% - - -16.68% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 75.95% 100.00% 24.05% - - - 1.32 -31.67% - - 24.05% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 75.95% 100.00% 24.05% - - - 1.32 -31.67% - - 24.05% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 67.29% 100.00% 32.71% - - - 1.49 -48.60% - - 32.71% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 98.77% 100.00% 1.23% - - - 1.01 -1.25% - - 1.23% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 109.21% 100.00% -9.21% - - - 0.92 8.43% - - -9.21% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 109.21% 100.00% -9.21% - - - 0.92 8.43% - - -9.21% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 82.39% 100.00% 17.61% - - - 1.21 -21.37% - - 17.61% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 5564.02% 100.00% -5464.02% - - - 0.02 98.20% - - -5464.02% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
MALLA DE REFUERZO 0.97X45.70 (44.32MST)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 1058.16% 100.00% -958.16% - - - 0.09 90.55% - - -958.16% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 1058.16% 100.00% -958.16% - - - 0.09 90.55% - - -958.16% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 253.98% 100.00% -153.98% - - - 0.39 60.63% - - -153.98% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 143.37% 100.00% -43.37% - - - 0.70 30.25% - - -43.37% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 111.25% 100.00% -11.25% - - - 0.90 10.11% - - -11.25% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 71.88 -7088.00% - - 98.61% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 2.45% 100.00% 97.55% - - - 40.89 -3989.44% - - 97.55% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 248.91 -24791.00% - - 99.60% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 869.44 -86844.00% - - 99.88% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA DE BROCA 37709 DE 7X7X16
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 1 5/8" X 10' (CAL 26)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 89.16% 100.00% 10.84% - - - 1.12 -12.16% - - 10.84% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 125.94% 100.00% -25.94% - - - 0.79 20.60% - - -25.94% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 94858.18% 100.00% -94758.18% - - - 0.00 99.89% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 10331.69% 100.00% -10231.69% - - - 0.01 99.03% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 1194.35% 100.00% -1094.35% - - - 0.08 91.63% - - -1094.35% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 570.49% 100.00% -470.49% - - - 0.18 82.47% - - -470.49% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 666.51% 100.00% -566.51% - - - 0.15 85.00% - - -566.51% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 308.99% 100.00% -208.99% - - - 0.32 67.64% - - -208.99% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 144.16% 100.00% -44.16% - - - 0.69 30.64% - - -44.16% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 127.85% 100.00% -27.85% - - - 0.78 21.78% - - -27.85% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 100.94% 100.00% -0.94% - - - 0.99 0.94% - - -0.94% - 0.00%
ACERO DE 1/2 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 19.39% 100.00% 80.61% - - - 5.16 -415.73% - - 80.61% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 185.93% 100.00% -85.93% - - - 0.54 46.21% - - -85.93% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.27% 100.00% -109.27% - - - 0.48 52.21% - - -109.27% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 407.89% 100.00% -307.89% - - - 0.25 75.48% - - -307.89% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 116.68% 100.00% -16.68% - - - 0.86 14.29% - - -16.68% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 619.67% 100.00% -519.67% - - - 0.16 83.86% - - -519.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 94.39% 100.00% 5.61% - - - 1.06 -5.94% - - 5.61% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 63.70% 100.00% 36.30% - - - 1.57 -56.99% - - 36.30% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO REDONDO HIERRO NEGRO 1" CHAPA 16
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLANCHA DE THERMOPOR DE 2*50*100 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 49.39% 100.00% 50.61% - - - 2.02 -102.45% - - 50.61% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 49.39% 100.00% 50.61% - - - 2.02 -102.45% - - 50.61% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 96.00% 100.00% 4.00% - - - 1.04 -4.17% - - 4.00% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.44% 84.00% 100.00% 16.00% - - - 1.19 -19.05% - - 16.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 581.64% 100.00% -481.64% - - - 0.17 82.81% - - -481.64% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 564.80% 100.00% -464.80% - - - 0.18 82.29% - - -464.80% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 496.66% 100.00% -396.66% - - - 0.20 79.87% - - -396.66% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. HERRERIA, ESTRUCTURA METALICA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MANTENIMIENTO BARANDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 12' TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO DE ALAMBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIA VIDRIO LIQUIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DETERGENTE ESPUMIL 1000 GRS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 121.92% 100.00% -21.92% - - - 0.82 17.98% - - -21.92% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 175.97% 100.00% -75.97% - - - 0.57 43.17% - - -75.97% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 154.45% 100.00% -54.45% - - - 0.65 35.25% - - -54.45% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 154.45% 100.00% -54.45% - - - 0.65 35.25% - - -54.45% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 93.21% 100.00% 6.79% - - - 1.07 -7.29% - - 6.79% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 82.19% 100.00% 17.81% - - - 1.22 -21.68% - - 17.81% - 0.00%
ADHESIVO NORMAL GRIS SACO DE 20 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 117.86% 100.00% -17.86% - - - 0.85 15.16% - - -17.86% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 86.98% 100.00% 13.02% - - - 1.15 -14.96% - - 13.02% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.15% 100.00% -3.15% - - - 0.97 3.06% - - -3.15% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 84.56% 100.00% 15.44% - - - 1.18 -18.26% - - 15.44% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 31.22% 100.00% 68.78% - - - 3.20 -220.31% - - 68.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 2''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 104.68% 100.00% -4.68% - - - 0.96 4.47% - - -4.68% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 104.68% 100.00% -4.68% - - - 0.96 4.47% - - -4.68% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 104.68% 100.00% -4.68% - - - 0.96 4.47% - - -4.68% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 104.68% 100.00% -4.68% - - - 0.96 4.47% - - -4.68% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 95.95% 100.00% 4.05% - - - 1.04 -4.22% - - 4.05% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 94.88% 100.00% 5.12% - - - 1.05 -5.39% - - 5.12% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.35% 100.00% 99.65% - - - 289.12 -28811.52% - - 99.65% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.35% 100.00% 99.65% - - - 289.12 -28811.52% - - 99.65% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 95.94% 100.00% 4.06% - - - 1.04 -4.23% - - 4.06% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 88.42% 100.00% 11.58% - - - 1.13 -13.10% - - 11.58% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 88.42% 100.00% 11.58% - - - 1.13 -13.10% - - 11.58% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 52.42% 100.00% 47.58% - - - 1.91 -90.77% - - 47.58% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CUBETAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MINI FELPAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.09% 73.58% 100.00% 26.42% - - - 1.36 -35.90% - - 26.42% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.09% 73.58% 100.00% 26.42% - - - 1.36 -35.90% - - 26.42% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.09% 73.58% 100.00% 26.42% - - - 1.36 -35.90% - - 26.42% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.09% 73.58% 100.00% 26.42% - - - 1.36 -35.90% - - 26.42% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 10.74% 100.00% 89.26% - - - 9.31 -830.72% - - 89.26% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 30.96% 100.00% 69.04% - - - 3.23 -223.01% - - 69.04% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 26.85% 100.00% 73.15% - - - 3.72 -272.39% - - 73.15% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 354.38 -35338.00% - - 99.72% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 62.22% 100.00% 37.78% - - - 1.61 -60.71% - - 37.78% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 500.50 -49950.00% - - 99.80% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 506.24 -50524.00% - - 99.80% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2326.71 -232571.00% - - 99.96% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 100.00% 100.00% - - - 1539.00 -153800.00% - - 99.94% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 55.13% 100.00% 44.87% - - - 1.81 -81.38% - - 44.87% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.18% 100.00% -0.18% - - - 1.00 0.18% - - -0.18% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 100.00% -3.14% - - - 0.97 3.04% - - -3.14% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 1.66% 100.00% 98.34% - - - 60.41 -5940.57% - - 98.34% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 4.38% 100.00% 95.62% - - - 22.81 -2181.49% - - 95.62% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 5.70% 100.00% 94.30% - - - 17.55 -1654.91% - - 94.30% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 4.34% 100.00% 95.66% - - - 23.02 -2202.22% - - 95.66% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
CASA # 41
- - - - - - 1.30% 1.33% 70.91% 83.42% 12.51% - - - 1.18 -17.64% - - 15.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.46% 53.97% 58.82% 4.85% - - - 1.09 -8.98% - - 8.24% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.10% 85.45% 100.00% 14.55% - - - 1.17 -17.03% - - 14.55% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.10% 87.89% 100.00% 12.11% - - - 1.14 -13.78% - - 12.11% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 2500.17% 100.00% -2400.17% - - - 0.04 96.00% - - -2400.17% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 2500.17% 100.00% -2400.17% - - - 0.04 96.00% - - -2400.17% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.10% 0.00% 100.00% 100.00% - - - 30004.72 -3000372.33% - - 100.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.10% 0.00% 100.00% 100.00% - - - 30004.72 -3000372.33% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 16.01% 100.00% 83.99% - - - 6.25 -524.69% - - 83.99% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 16.01% 100.00% 83.99% - - - 6.25 -524.69% - - 83.99% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 16.01% 100.00% 83.99% - - - 6.25 -524.69% - - 83.99% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 81.20% 100.00% 18.80% - - - 1.23 -23.16% - - 18.80% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 81.20% 100.00% 18.80% - - - 1.23 -23.16% - - 18.80% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 81.20% 100.00% 18.80% - - - 1.23 -23.16% - - 18.80% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 81.20% 100.00% 18.80% - - - 1.23 -23.16% - - 18.80% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.07% 53.32% 100.00% 46.68% - - - 1.88 -87.54% - - 46.68% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 80.90% 100.00% 19.10% - - - 1.24 -23.61% - - 19.10% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 80.90% 100.00% 19.10% - - - 1.24 -23.61% - - 19.10% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 519.63 -51863.18% - - 99.81% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2209.01 -220801.18% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 78.42% 100.00% 21.58% - - - 1.28 -27.51% - - 21.58% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 490.45 -48945.18% - - 99.80% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7605.52 -760452.18% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 31.57% 100.00% 68.43% - - - 3.17 -216.73% - - 68.43% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 14465.91% 100.00% -14365.91% - - - 0.01 99.31% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 1256.82% 100.00% -1156.82% - - - 0.08 92.04% - - -1156.82% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 5752.20% 100.00% -5652.20% - - - 0.02 98.26% - - -5652.20% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 1005.75% 100.00% -905.75% - - - 0.10 90.06% - - -905.75% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6952.60 -695160.18% - - 99.99% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6952.60 -695160.18% - - 99.99% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6952.60 -695160.18% - - 99.99% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 6.52% 100.00% 93.48% - - - 15.33 -1433.48% - - 93.48% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 194.17% 100.00% -94.17% - - - 0.52 48.50% - - -94.17% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 194.17% 100.00% -94.17% - - - 0.52 48.50% - - -94.17% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 175.38% 100.00% -75.38% - - - 0.57 42.98% - - -75.38% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 212.96% 100.00% -112.96% - - - 0.47 53.04% - - -112.96% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3445.60 -344460.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3445.60 -344460.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3445.60 -344460.00% - - 99.97% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 60.75% 0.00% -60.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 60.75% 0.00% -60.75% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 60.75% 0.00% -60.75% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.56% 0.00% -1.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 4.51% 0.00% -4.51% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 0.40% 0.00% -0.40% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.07% 62.70% 0.00% -62.70% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.07% 62.70% 0.00% -62.70% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.07% 62.70% 0.00% -62.70% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.07% 62.70% 0.00% -62.70% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2215.73 -221473.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2215.73 -221473.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2215.73 -221473.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2215.73 -221473.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.65% 88.92% 100.00% 11.08% - - - 1.12 -12.46% - - 11.08% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.19% 99.03% 100.00% 0.97% - - - 1.01 -0.98% - - 0.97% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.11% 134.55% 100.00% -34.55% - - - 0.74 25.68% - - -34.55% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 188.33% 100.00% -88.33% - - - 0.53 46.90% - - -88.33% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9544.98 -954397.94% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 15216.53% 100.00% -15116.53% - - - 0.01 99.34% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7183.26 -718225.94% - - 99.99% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 112.53% 100.00% -12.53% - - - 0.89 11.13% - - -12.53% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 225.30% 100.00% -125.30% - - - 0.44 55.61% - - -125.30% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 210.09 -20908.94% - - 99.52% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.04% 112.02% 100.00% -12.02% - - - 0.89 10.73% - - -12.02% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 115.24% 100.00% -15.24% - - - 0.87 13.22% - - -15.24% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 249.51 -24850.94% - - 99.60% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 49.40% 100.00% 50.60% - - - 2.02 -102.41% - - 50.60% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 754.90 -75389.94% - - 99.87% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 222.92% 100.00% -122.92% - - - 0.45 55.14% - - -122.92% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 331.02 -33001.94% - - 99.70% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 343.34 -34233.94% - - 99.71% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 197.98% 100.00% -97.98% - - - 0.51 49.49% - - -97.98% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 2.35% 100.00% 97.65% - - - 42.61 -4160.96% - - 97.65% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 2.39% 100.00% 97.61% - - - 41.76 -4076.08% - - 97.61% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 110.32% 100.00% -10.32% - - - 0.91 9.35% - - -10.32% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 57.08% 100.00% 42.92% - - - 1.75 -75.18% - - 42.92% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 503.85 -50284.94% - - 99.80% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 128.79% 100.00% -28.79% - - - 0.78 22.36% - - -28.79% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 42.93% 100.00% 57.07% - - - 2.33 -132.93% - - 57.07% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 128.79% 100.00% -28.79% - - - 0.78 22.36% - - -28.79% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 122.11% 100.00% -22.11% - - - 0.82 18.11% - - -22.11% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 209.69 -20868.94% - - 99.52% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 232.25 -23124.94% - - 99.57% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 232.25 -23124.94% - - 99.57% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 429.27 -42826.89% - - 99.77% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 218.93 -21792.94% - - 99.54% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 210.34 -20933.94% - - 99.52% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1181.87 -118086.83% - - 99.92% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 357.70 -35669.94% - - 99.72% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 292.62 -29161.94% - - 99.66% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 531.55 -53054.94% - - 99.81% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1994.32 -199331.89% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1137.78 -113677.94% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 856.54 -85553.94% - - 99.88% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 54.24% 100.00% 45.76% - - - 1.84 -84.35% - - 45.76% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 54.24% 100.00% 45.76% - - - 1.84 -84.35% - - 45.76% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 5915.00% 100.00% -5815.00% - - - 0.02 98.31% - - -5815.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 454.65% 100.00% -354.65% - - - 0.22 78.00% - - -354.65% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2817.63 -281662.94% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21380.27 -2137926.94% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1247.02 -124601.94% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1247.02 -124601.94% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1247.02 -124601.94% - - 99.92% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.16% 96.49% 100.00% 3.51% - - - 1.04 -3.63% - - 3.51% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.10% 101.58% 100.00% -1.58% - - - 0.98 1.55% - - -1.58% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.10% 101.58% 100.00% -1.58% - - - 0.98 1.55% - - -1.58% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 45774.75% 100.00% -45674.75% - - - 0.00 99.78% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3712.15 -371114.91% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 7455.17% 100.00% -7355.17% - - - 0.01 98.66% - - -7355.17% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1563.56 -156255.91% - - 99.94% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24677.58 -2467657.91% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 89.77% 100.00% 10.23% - - - 1.11 -11.40% - - 10.23% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 804.59% 100.00% -704.59% - - - 0.12 87.57% - - -704.59% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 804.59% 100.00% -704.59% - - - 0.12 87.57% - - -704.59% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 289.40% 100.00% -189.40% - - - 0.35 65.45% - - -189.40% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.84 -7983.91% - - 98.76% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 697.12% 100.00% -597.12% - - - 0.14 85.66% - - -597.12% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 281.71% 100.00% -181.71% - - - 0.35 64.50% - - -181.71% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 140.97 -13996.91% - - 99.29% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 133.19% 100.00% -33.19% - - - 0.75 24.92% - - -33.19% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 2078.69% 100.00% -1978.69% - - - 0.05 95.19% - - -1978.69% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 4373.72% 100.00% -4273.72% - - - 0.02 97.71% - - -4273.72% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 177.54% 100.00% -77.54% - - - 0.56 43.67% - - -77.54% - 0.00%
CINTA DE AISLAR SCOTCH
- - - - - - 0.00% 0.00% 177.54% 100.00% -77.54% - - - 0.56 43.67% - - -77.54% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 114.06% 100.00% -14.06% - - - 0.88 12.33% - - -14.06% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1723.36 -172235.91% - - 99.94% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 3539.95% 100.00% -3439.95% - - - 0.03 97.18% - - -3439.95% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 55.94% 100.00% 44.06% - - - 1.79 -78.77% - - 44.06% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 14.50% 100.00% 85.50% - - - 6.90 -589.84% - - 85.50% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 68.62 -6761.91% - - 98.54% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 929.33% 100.00% -829.33% - - - 0.11 89.24% - - -829.33% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 637.67% 100.00% -537.67% - - - 0.16 84.32% - - -537.67% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 456.49% 100.00% -356.49% - - - 0.22 78.09% - - -356.49% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 42.87% 100.00% 57.13% - - - 2.33 -133.25% - - 57.13% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 103.44% 100.00% -3.44% - - - 0.97 3.32% - - -3.44% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 68.99% 100.00% 31.01% - - - 1.45 -44.94% - - 31.01% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1787.47 -178646.91% - - 99.94% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 18.72% 100.00% 81.28% - - - 5.34 -434.14% - - 81.28% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 920.24 -91923.91% - - 99.89% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 339.84% 100.00% -239.84% - - - 0.29 70.57% - - -239.84% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 63.96 -6295.91% - - 98.44% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 67.21 -6620.91% - - 98.51% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 67.21 -6620.91% - - 98.51% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 140.69 -13968.82% - - 99.29% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 76.56 -7555.91% - - 98.69% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 64.13 -6312.91% - - 98.44% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 738.17 -73716.91% - - 99.86% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 738.17 -73716.91% - - 99.86% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9396.42 -939541.82% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 138.05 -13704.91% - - 99.28% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9258.37 -925736.91% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 213.36 -21235.91% - - 99.53% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 213.36 -21235.91% - - 99.53% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 213.36 -21235.91% - - 99.53% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 90.12% 100.00% 9.88% - - - 1.11 -10.96% - - 9.88% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 171.20% 100.00% -71.20% - - - 0.58 41.59% - - -71.20% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 241.92% 100.00% -141.92% - - - 0.41 58.66% - - -141.92% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 202.43% 100.00% -102.43% - - - 0.49 50.60% - - -102.43% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 138.55% 100.00% -38.55% - - - 0.72 27.83% - - -38.55% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 70.85% 100.00% 29.15% - - - 1.41 -41.14% - - 29.15% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 93.96% 100.00% 6.04% - - - 1.06 -6.43% - - 6.04% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.29% 100.00% -27.29% - - - 0.79 21.44% - - -27.29% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.07% 100.00% 62.93% - - - 2.70 -169.75% - - 62.93% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 4.87% 100.00% 95.13% - - - 20.52 -1952.35% - - 95.13% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 4.87% 100.00% 95.13% - - - 20.52 -1952.35% - - 95.13% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.22% 74.45% 100.00% 25.55% - - - 1.34 -34.31% - - 25.55% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.12% 117.59% 100.00% -17.59% - - - 0.85 14.96% - - -17.59% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 369.43% 100.00% -269.43% - - - 0.27 72.93% - - -269.43% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 151.74 -15073.57% - - 99.34% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 740.21% 100.00% -640.21% - - - 0.14 86.49% - - -640.21% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 169.49% 100.00% -69.49% - - - 0.59 41.00% - - -69.49% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 162.52 -16151.57% - - 99.38% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 350.65% 100.00% -250.65% - - - 0.29 71.48% - - -250.65% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 140.91% 100.00% -40.91% - - - 0.71 29.03% - - -40.91% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 104.60% 100.00% -4.60% - - - 0.96 4.40% - - -4.60% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 199.91 -19890.57% - - 99.50% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 105.61% 100.00% -5.61% - - - 0.95 5.31% - - -5.61% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 817.62 -81661.57% - - 99.88% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 242.59% 100.00% -142.59% - - - 0.41 58.78% - - -142.59% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 103.95% 100.00% -3.95% - - - 0.96 3.80% - - -3.95% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 139.02% 100.00% -39.02% - - - 0.72 28.07% - - -39.02% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 267.06% 100.00% -167.06% - - - 0.37 62.56% - - -167.06% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 9.76% 100.00% 90.24% - - - 10.24 -924.29% - - 90.24% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 9.95% 100.00% 90.05% - - - 10.05 -904.56% - - 90.05% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 401.15% 100.00% -301.15% - - - 0.25 75.07% - - -301.15% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.07% 123.87% 100.00% -23.87% - - - 0.81 19.27% - - -23.87% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11561.05 -1156004.57% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 16703.99% 100.00% -16603.99% - - - 0.01 99.40% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8674.50 -867349.57% - - 99.99% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.67% 100.00% 62.33% - - - 2.65 -165.49% - - 62.33% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 510.78 -50977.57% - - 99.80% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 158.75% 100.00% -58.75% - - - 0.63 37.01% - - -58.75% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 4.23% 100.00% 95.77% - - - 23.62 -2262.28% - - 95.77% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 53.74% 100.00% 46.26% - - - 1.86 -86.07% - - 46.26% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 4.26% 100.00% 95.74% - - - 23.48 -2247.60% - - 95.74% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 132.29% 100.00% -32.29% - - - 0.76 24.41% - - -32.29% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 151.25 -15024.57% - - 99.34% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 178.82 -17781.57% - - 99.44% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 178.82 -17781.57% - - 99.44% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1129.37 -112836.71% - - 99.91% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 332.15 -33114.57% - - 99.70% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 252.60 -25159.57% - - 99.60% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 544.63 -54362.57% - - 99.82% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2227.45 -222645.14% - - 99.96% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1285.62 -128461.57% - - 99.92% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 941.84 -94083.57% - - 99.89% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 20.77% 100.00% 79.23% - - - 4.81 -381.42% - - 79.23% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 20.77% 100.00% 79.23% - - - 4.81 -381.42% - - 79.23% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 4055.34% 100.00% -3955.34% - - - 0.02 97.53% - - -3955.34% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3338.73 -333772.57% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 26026.40 -2602539.57% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1419.10 -141809.57% - - 99.93% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1419.10 -141809.57% - - 99.93% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1419.10 -141809.57% - - 99.93% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.23% 53.94% 86.12% 32.18% - - - 1.60 -59.67% - - 37.37% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 101.20% 88.00% -13.20% - - - 0.87 13.05% - - -15.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.12% 104.63% 88.00% -16.63% - - - 0.84 15.89% - - -18.90% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 1091.44% 88.00% -1003.44% - - - 0.08 91.94% - - -1140.27% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 1125.67% 88.00% -1037.67% - - - 0.08 92.18% - - -1179.17% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 1057.20% 88.00% -969.20% - - - 0.08 91.68% - - -1101.36% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 99.75% 88.00% -11.75% - - - 0.88 11.78% - - -13.36% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 99.75% 88.00% -11.75% - - - 0.88 11.78% - - -13.36% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 14.73% 88.00% 73.27% - - - 5.97 -497.39% - - 83.26% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 79.14% 88.00% 8.86% - - - 1.11 -11.20% - - 10.07% - 0.00%
TUBO PVC GRIS DE 2" X 3 MTS
- - - - - - 0.00% 0.00% 129.59% 88.00% -41.59% - - - 0.68 32.09% - - -47.26% - 0.00%
COPLA PVC GRIS DE 2" ELECTRICIDAD
- - - - - - 0.00% 0.00% 16.66% 88.00% 71.34% - - - 5.28 -428.21% - - 81.07% - 0.00%
VUELTA PVC GRIS DE 2"
- - - - - - 0.00% 0.00% 91.17% 88.00% -3.17% - - - 0.97 3.48% - - -3.60% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 1025.43 -102443.38% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 1025.43 -102443.38% - - 99.90% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.11% 0.69% 84.00% 83.31% - - - 121.09 -12009.13% - - 99.17% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 16.90% 84.00% 67.10% - - - 4.97 -397.14% - - 79.88% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 128.23% 84.00% -44.23% - - - 0.66 34.49% - - -52.65% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 128.23% 84.00% -44.23% - - - 0.66 34.49% - - -52.65% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 39.46% 84.00% 44.54% - - - 2.13 -112.90% - - 53.03% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 39.46% 84.00% 44.54% - - - 2.13 -112.90% - - 53.03% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 918.59 -91758.62% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 918.59 -91758.62% - - 99.89% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26871.31 -2687031.02% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26871.31 -2687031.02% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26871.31 -2687031.02% - - 100.00% - 0.00%
CASA # 46
- - - - - - 1.30% 1.31% 42.09% 49.80% 7.71% - - - 1.18 -18.32% - - 15.49% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 80.70% 74.29% -6.41% - - - 0.92 7.94% - - -8.63% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 111.70% 100.00% -11.70% - - - 0.90 10.47% - - -11.70% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 171.72% 100.00% -71.72% - - - 0.58 41.77% - - -71.72% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 12512.51% 100.00% -12412.51% - - - 0.01 99.20% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 277.85% 100.00% -177.85% - - - 0.36 64.01% - - -177.85% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 181.52% 100.00% -81.52% - - - 0.55 44.91% - - -81.52% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 218.52% 100.00% -118.52% - - - 0.46 54.24% - - -118.52% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 35.44% 100.00% 64.56% - - - 2.82 -182.20% - - 64.56% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 513.08% 100.00% -413.08% - - - 0.19 80.51% - - -413.08% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 220.20% 100.00% -120.20% - - - 0.45 54.59% - - -120.20% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 631.67% 100.00% -531.67% - - - 0.16 84.17% - - -531.67% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 179.22% 100.00% -79.22% - - - 0.56 44.20% - - -79.22% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 45.32% 100.00% 54.68% - - - 2.21 -120.63% - - 54.68% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 45.32% 100.00% 54.68% - - - 2.21 -120.63% - - 54.68% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 103.85% 100.00% -3.85% - - - 0.96 3.71% - - -3.85% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 195.16% 100.00% -95.16% - - - 0.51 48.76% - - -95.16% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2127.01% 100.00% -2027.01% - - - 0.05 95.30% - - -2027.01% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 218.38% 100.00% -118.38% - - - 0.46 54.21% - - -118.38% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 201.20% 100.00% -101.20% - - - 0.50 50.30% - - -101.20% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 102.74% 100.00% -2.74% - - - 0.97 2.67% - - -2.74% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 49.10% 100.00% 50.90% - - - 2.04 -103.65% - - 50.90% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 173.72% 100.00% -73.72% - - - 0.58 42.44% - - -73.72% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.36 -14736.00% - - 99.33% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 132.16% 100.00% -32.16% - - - 0.76 24.33% - - -32.16% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 402.70% 100.00% -302.70% - - - 0.25 75.17% - - -302.70% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1480.53% 100.00% -1380.53% - - - 0.07 93.25% - - -1380.53% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 75.56% 100.00% 24.44% - - - 1.32 -32.35% - - 24.44% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 29062.75 -2906175.00% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 29062.75 -2906175.00% - - 100.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 93.77% 100.00% 6.23% - - - 1.07 -6.64% - - 6.23% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 182.47% 100.00% -82.47% - - - 0.55 45.20% - - -82.47% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 285.07% 100.00% -185.07% - - - 0.35 64.92% - - -185.07% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 103.51% 100.00% -3.51% - - - 0.97 3.39% - - -3.51% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 92.73% 100.00% 7.27% - - - 1.08 -7.85% - - 7.27% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 87.74% 100.00% 12.26% - - - 1.14 -13.97% - - 12.26% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.04% 100.00% -27.04% - - - 0.79 21.29% - - -27.04% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 87.19% 100.00% 12.81% - - - 1.15 -14.69% - - 12.81% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9672.31 -967131.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9672.31 -967131.00% - - 99.99% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 9.82% 0.00% -9.82% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 6.13% 0.00% -6.13% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 37.22% 0.00% -37.22% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 4983.98% 0.00% -4983.98% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 467.79% 0.00% -467.79% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 1623.17% 0.00% -1623.17% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 2.47% 0.00% -2.47% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 84.94% 0.00% -84.94% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.10% 12.15% 0.00% -12.15% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.10% 12.15% 0.00% -12.15% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 22722.13% 0.00% -22722.13% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.24% 9.75% 86.05% 76.30% - - - 8.83 -782.82% - - 88.67% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.12% 17.20% 84.00% 66.80% - - - 4.88 -388.25% - - 79.52% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.01% 141.86% 84.00% -57.86% - - - 0.59 40.79% - - -68.89% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.01% 238.68% 84.00% -154.68% - - - 0.35 64.81% - - -184.14% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 122.06% 84.00% -38.06% - - - 0.69 31.18% - - -45.31% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.00% 0.00% 113.78% 84.00% -29.78% - - - 0.74 26.18% - - -35.46% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 139.30% 84.00% -55.30% - - - 0.60 39.70% - - -65.83% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 258.60% 84.00% -174.60% - - - 0.32 67.52% - - -207.86% - 0.00%
INODORO 1
- - - - - - 0.00% 0.00% 775.80% 84.00% -691.80% - - - 0.11 89.17% - - -823.57% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.00% 0.00% 227.57% 84.00% -143.57% - - - 0.37 63.09% - - -170.91% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 50.69% 84.00% 33.31% - - - 1.66 -65.73% - - 39.66% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 315.49% 84.00% -231.49% - - - 0.27 73.37% - - -275.59% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 144.82% 84.00% -60.82% - - - 0.58 42.00% - - -72.40% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 10.84% 84.00% 73.16% - - - 7.75 -675.24% - - 87.10% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 18.77% 84.00% 65.23% - - - 4.47 -347.42% - - 77.65% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 2.90% 84.00% 81.10% - - - 29.00 -2800.23% - - 96.55% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 1046.28 -104528.14% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 1046.28 -104528.14% - - 99.90% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26999.01 -2699800.54% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26999.01 -2699800.54% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26999.01 -2699800.54% - - 100.00% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 2.68% 88.00% 85.32% - - - 32.81 -3180.91% - - 96.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.12% 2.72% 88.00% 85.28% - - - 32.30 -3130.12% - - 96.90% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 242.42% 88.00% -154.42% - - - 0.36 63.70% - - -175.48% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 242.42% 88.00% -154.42% - - - 0.36 63.70% - - -175.48% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.12% 0.00% 88.00% 88.00% - - - 31938.18 -3193718.32% - - 100.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.12% 0.00% 88.00% 88.00% - - - 31938.18 -3193718.32% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.01% 1.87% 88.00% 86.13% - - - 47.11 -4610.75% - - 97.88% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 8.61% 88.00% 79.39% - - - 10.22 -921.96% - - 90.21% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 8.61% 88.00% 79.39% - - - 10.22 -921.96% - - 90.21% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 1310.26 -130925.84% - - 99.92% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 1310.26 -130925.84% - - 99.92% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.47% 9.24% 0.00% -9.24% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.56% 0.00% -1.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 4.51% 0.00% -4.51% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 0.40% 0.00% -0.40% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 22
- - - - - - 1.30% 1.26% 83.69% 100.00% 16.31% - - - 1.19 -19.48% - - 16.31% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 95.96% 100.00% 4.04% - - - 1.04 -4.21% - - 4.04% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 115.26% 100.00% -15.26% - - - 0.87 13.24% - - -15.26% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 158.19% 100.00% -58.19% - - - 0.63 36.79% - - -58.19% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 170786.52% 100.00% -170686.52% - - - 0.00 99.94% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 230303.03% 100.00% -230203.03% - - - 0.00 99.96% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 207.49% 100.00% -107.49% - - - 0.48 51.81% - - -107.49% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 110.27% 100.00% -10.27% - - - 0.91 9.31% - - -10.27% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 62.53% 100.00% 37.47% - - - 1.60 -59.92% - - 37.47% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 95.99% 100.00% 4.01% - - - 1.04 -4.17% - - 4.01% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 95.43% 100.00% 4.57% - - - 1.05 -4.79% - - 4.57% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.59% 100.00% 62.41% - - - 2.66 -166.06% - - 62.41% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 77.36% 100.00% 22.64% - - - 1.29 -29.27% - - 22.64% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 77.36% 100.00% 22.64% - - - 1.29 -29.27% - - 22.64% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 182.55% 100.00% -82.55% - - - 0.55 45.22% - - -82.55% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 111.87% 100.00% -11.87% - - - 0.89 10.61% - - -11.87% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 140.57% 100.00% -40.57% - - - 0.71 28.86% - - -40.57% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 80000.00% 100.00% -79900.00% - - - 0.00 99.88% - - 0.00% - 0.00%
PLANIGROUT 755
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6706.71% 100.00% -6606.71% - - - 0.01 98.51% - - -6606.71% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 528.43% 100.00% -428.43% - - - 0.19 81.08% - - -428.43% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 1973.50% 100.00% -1873.50% - - - 0.05 94.93% - - -1873.50% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 150.66% 100.00% -50.66% - - - 0.66 33.63% - - -50.66% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 69.51% 100.00% 30.49% - - - 1.44 -43.86% - - 30.49% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 33.50% 100.00% 66.50% - - - 2.99 -198.52% - - 66.50% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 147.35% 100.00% -47.35% - - - 0.68 32.14% - - -47.35% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 113.30% 100.00% -13.30% - - - 0.88 11.74% - - -13.30% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 137.99% 100.00% -37.99% - - - 0.72 27.53% - - -37.99% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 33.61% 100.00% 66.39% - - - 2.98 -197.53% - - 66.39% - 0.00%
ACERO DE 1/2 X 12 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 143.05% 100.00% -43.05% - - - 0.70 30.09% - - -43.05% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 83.07% 100.00% 16.93% - - - 1.20 -20.38% - - 16.93% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 82.68% 100.00% 17.32% - - - 1.21 -20.95% - - 17.32% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 82.68% 100.00% 17.32% - - - 1.21 -20.95% - - 17.32% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 72.47% 100.00% 27.53% - - - 1.38 -37.99% - - 27.53% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 97.25% 100.00% 2.75% - - - 1.03 -2.83% - - 2.75% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 141.67% 100.00% -41.67% - - - 0.71 29.41% - - -41.67% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 27087.27% 100.00% -26987.27% - - - 0.00 99.63% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 16143.19% 100.00% -16043.19% - - - 0.01 99.38% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 1324.19% 100.00% -1224.19% - - - 0.08 92.45% - - -1224.19% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 2086.51% 100.00% -1986.51% - - - 0.05 95.21% - - -1986.51% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 395.19% 100.00% -295.19% - - - 0.25 74.70% - - -295.19% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 138.13% 100.00% -38.13% - - - 0.72 27.60% - - -38.13% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 123.59% 100.00% -23.59% - - - 0.81 19.09% - - -23.59% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 83.12% 100.00% 16.88% - - - 1.20 -20.31% - - 16.88% - 0.00%
ACERO DE 1/2 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 23.54% 100.00% 76.46% - - - 4.25 -324.72% - - 76.46% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 134.97% 100.00% -34.97% - - - 0.74 25.91% - - -34.97% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 348.78% 100.00% -248.78% - - - 0.29 71.33% - - -248.78% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 540.82% 100.00% -440.82% - - - 0.18 81.51% - - -440.82% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 94.26% 100.00% 5.74% - - - 1.06 -6.08% - - 5.74% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 703.16% 100.00% -603.16% - - - 0.14 85.78% - - -603.16% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 91.66% 100.00% 8.34% - - - 1.09 -9.09% - - 8.34% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 160.14% 100.00% -60.14% - - - 0.62 37.55% - - -60.14% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO REDONDO HIERRO NEGRO 1" CHAPA 16
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLANCHA DE THERMOPOR DE 2*50*100 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 48.78% 100.00% 51.22% - - - 2.05 -105.02% - - 51.22% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 48.78% 100.00% 51.22% - - - 2.05 -105.02% - - 51.22% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 90.35% 100.00% 9.65% - - - 1.11 -10.68% - - 9.65% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 67.80% 100.00% 32.20% - - - 1.48 -47.50% - - 32.20% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 82.96% 100.00% 17.04% - - - 1.21 -20.54% - - 17.04% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 82.96% 100.00% 17.04% - - - 1.21 -20.54% - - 17.04% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 43.36% 100.00% 56.64% - - - 2.31 -130.61% - - 56.64% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2095.48% 100.00% -1995.48% - - - 0.05 95.23% - - -1995.48% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
MALLA DE REFUERZO 0.97X45.70 (44.32MST)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIURETANO MARCA DYMONIC 100
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 149.80% 100.00% -49.80% - - - 0.67 33.24% - - -49.80% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 87.13% 100.00% 12.87% - - - 1.15 -14.78% - - 12.87% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 1867.15% 100.00% -1767.15% - - - 0.05 94.64% - - -1767.15% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 131.06% 100.00% -31.06% - - - 0.76 23.70% - - -31.06% - 0.00%
NYLON BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA EN POLVO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MALLA GALVANIZADA MAS ESTRUCTURA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MINI FELPAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 88.18% 100.00% 11.82% - - - 1.13 -13.40% - - 11.82% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 88.18% 100.00% 11.82% - - - 1.13 -13.40% - - 11.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 16.79% 100.00% 83.21% - - - 5.96 -495.75% - - 83.21% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 248.91 -24791.00% - - 99.60% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPERMEABILIZANTE FASTYL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 1 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA DE BROCA 37709 DE 7X7X16
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 1 5/8" X 10' (CAL 26)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.44% 81.35% 100.00% 18.65% - - - 1.23 -22.92% - - 18.65% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 185.33% 100.00% -85.33% - - - 0.54 46.04% - - -85.33% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 146.61% 100.00% -46.61% - - - 0.68 31.79% - - -46.61% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 146.61% 100.00% -46.61% - - - 0.68 31.79% - - -46.61% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 12' TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIA VIDRIO LIQUIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DETERGENTE ESPUMIL 1000 GRS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIQUIDO ATRAPA POLVO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SQUEEGEE LIMPIADOR DE VIDRIOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 117.36% 100.00% -17.36% - - - 0.85 14.79% - - -17.36% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 112.29% 100.00% -12.29% - - - 0.89 10.94% - - -12.29% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 112.29% 100.00% -12.29% - - - 0.89 10.94% - - -12.29% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 76.29% 100.00% 23.71% - - - 1.31 -31.08% - - 23.71% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 116.49% 100.00% -16.49% - - - 0.86 14.16% - - -16.49% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 94.54% 100.00% 5.46% - - - 1.06 -5.78% - - 5.46% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 28911.52 -2891052.00% - - 100.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 28911.52 -2891052.00% - - 100.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA 4" INOXIDABLE MANGO DE PLASTICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAMENT-1 ADITIVO ACELERANTE P/CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTENSION ELECTRICA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICON BLANCO 10.1Z ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BANDEJA PARA PINTURA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINCEL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 240 P/AGUA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FELPA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SELLADOR ACRILICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 102.66% 100.00% -2.66% - - - 0.97 2.60% - - -2.66% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 135.66% 100.00% -35.66% - - - 0.74 26.29% - - -35.66% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 135.66% 100.00% -35.66% - - - 0.74 26.29% - - -35.66% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 135.66% 100.00% -35.66% - - - 0.74 26.29% - - -35.66% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 85.13% 100.00% 14.87% - - - 1.17 -17.46% - - 14.87% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 81.19% 100.00% 18.81% - - - 1.23 -23.16% - - 18.81% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 117.86% 100.00% -17.86% - - - 0.85 15.16% - - -17.86% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 86.98% 100.00% 13.02% - - - 1.15 -14.96% - - 13.02% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.15% 100.00% -3.15% - - - 0.97 3.06% - - -3.15% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 84.56% 100.00% 15.44% - - - 1.18 -18.26% - - 15.44% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 31.22% 100.00% 68.78% - - - 3.20 -220.31% - - 68.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 2''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 97.06% 100.00% 2.94% - - - 1.03 -3.03% - - 2.94% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 97.06% 100.00% 2.94% - - - 1.03 -3.03% - - 2.94% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 97.06% 100.00% 2.94% - - - 1.03 -3.03% - - 2.94% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 97.06% 100.00% 2.94% - - - 1.03 -3.03% - - 2.94% - 0.00%
VENTANAS
- - - - - - 0.08% 0.09% 73.58% 100.00% 26.42% - - - 1.36 -35.90% - - 26.42% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.09% 73.58% 100.00% 26.42% - - - 1.36 -35.90% - - 26.42% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.09% 73.58% 100.00% 26.42% - - - 1.36 -35.90% - - 26.42% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.09% 73.58% 100.00% 26.42% - - - 1.36 -35.90% - - 26.42% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 6.31% 100.00% 93.69% - - - 15.84 -1484.35% - - 93.69% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 18.19% 100.00% 81.81% - - - 5.50 -449.86% - - 81.81% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 14.08% 100.00% 85.92% - - - 7.10 -610.16% - - 85.92% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 354.38 -35338.00% - - 99.72% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1350.00 -134900.00% - - 99.93% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 500.50 -49950.00% - - 99.80% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 506.24 -50524.00% - - 99.80% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2326.71 -232571.00% - - 99.96% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 100.00% 100.00% - - - 1539.00 -153800.00% - - 99.94% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCTO PARA EXTRACTOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 55.27% 100.00% 44.73% - - - 1.81 -80.92% - - 44.73% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.34% 100.00% -0.34% - - - 1.00 0.34% - - -0.34% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 100.00% -3.14% - - - 0.97 3.04% - - -3.14% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.94% 100.00% 93.06% - - - 14.40 -1340.43% - - 93.06% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLACA DE DOS PUERTOS BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 4.51% 100.00% 95.49% - - - 22.18 -2118.25% - - 95.49% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 9.99% 100.00% 90.01% - - - 10.01 -901.10% - - 90.01% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE GALVANIZADO CALIBRE 10
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 4.34% 100.00% 95.66% - - - 23.02 -2202.22% - - 95.66% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
CASA # 42
- - - - - - 1.30% 1.25% 68.89% 83.25% 14.36% - - - 1.21 -20.85% - - 17.25% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 60.28% 58.56% -1.72% - - - 0.97 2.85% - - -2.94% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 105.20% 100.00% -5.20% - - - 0.95 4.95% - - -5.20% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 94.54% 100.00% 5.46% - - - 1.06 -5.78% - - 5.46% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 28911.52 -2891052.00% - - 100.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 28911.52 -2891052.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 86.06% 100.00% 13.94% - - - 1.16 -16.20% - - 13.94% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 100.00% 14.37% - - - 1.17 -16.78% - - 14.37% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 85.63% 100.00% 14.37% - - - 1.17 -16.78% - - 14.37% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 85.63% 100.00% 14.37% - - - 1.17 -16.78% - - 14.37% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 54.62% 100.00% 45.38% - - - 1.83 -83.09% - - 45.38% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 83.63% 100.00% 16.37% - - - 1.20 -19.57% - - 16.37% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 83.63% 100.00% 16.37% - - - 1.20 -19.57% - - 16.37% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 475.62 -47462.00% - - 99.79% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 86.95% 100.00% 13.05% - - - 1.15 -15.01% - - 13.05% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 446.44 -44544.00% - - 99.78% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.28% 100.00% 67.72% - - - 3.10 -209.74% - - 67.72% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6908.59 -690759.00% - - 99.99% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6908.59 -690759.00% - - 99.99% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6908.59 -690759.00% - - 99.99% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 25.65% 100.00% 74.35% - - - 3.90 -289.84% - - 74.35% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 79.43% 0.00% -79.43% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 79.43% 0.00% -79.43% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 79.43% 0.00% -79.43% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.56% 0.00% -1.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 4.51% 0.00% -4.51% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 0.40% 0.00% -0.40% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 70.39% 0.00% -70.39% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 92.74% 100.00% 7.26% - - - 1.08 -7.83% - - 7.26% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 190.61% 100.00% -90.61% - - - 0.52 47.54% - - -90.61% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 342.60% 100.00% -242.60% - - - 0.29 70.81% - - -242.60% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 620.40% 100.00% -520.40% - - - 0.16 83.88% - - -520.40% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 587.06% 100.00% -487.06% - - - 0.17 82.97% - - -487.06% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 138.39% 100.00% -38.39% - - - 0.72 27.74% - - -38.39% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.00% 100.00% 29.00% - - - 1.41 -40.84% - - 29.00% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 93.83% 100.00% 6.17% - - - 1.07 -6.58% - - 6.17% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.02% 100.00% -27.02% - - - 0.79 21.27% - - -27.02% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.07% 100.00% 62.93% - - - 2.70 -169.75% - - 62.93% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 33.15% 100.00% 66.85% - - - 3.02 -201.70% - - 66.85% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 33.15% 100.00% 66.85% - - - 3.02 -201.70% - - 66.85% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 205.36% 100.00% -105.36% - - - 0.49 51.31% - - -105.36% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 101.86% 100.00% -1.86% - - - 0.98 1.83% - - -1.86% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 148.77% 100.00% -48.77% - - - 0.67 32.78% - - -48.77% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 308.00% 100.00% -208.00% - - - 0.32 67.53% - - -208.00% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
MASKING TAPE DE 2''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 171.15% 100.00% -71.15% - - - 0.58 41.57% - - -71.15% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 139.23% 100.00% -39.23% - - - 0.72 28.18% - - -39.23% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 119.77% 100.00% -19.77% - - - 0.83 16.51% - - -19.77% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 64.43% 100.00% 35.57% - - - 1.55 -55.20% - - 35.57% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 292.11% 100.00% -192.11% - - - 0.34 65.77% - - -192.11% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 220.72% 100.00% -120.72% - - - 0.45 54.69% - - -120.72% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 337.18% 100.00% -237.18% - - - 0.30 70.34% - - -237.18% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 50.62% 100.00% 49.38% - - - 1.98 -97.53% - - 49.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 50.62% 100.00% 49.38% - - - 1.98 -97.53% - - 49.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 78.25% 100.00% 21.75% - - - 1.28 -27.79% - - 21.75% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 99.24% 100.00% 0.76% - - - 1.01 -0.77% - - 0.76% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 99.24% 100.00% 0.76% - - - 1.01 -0.77% - - 0.76% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 44.32% 100.00% 55.68% - - - 2.26 -125.64% - - 55.68% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 1508.61% 100.00% -1408.61% - - - 0.07 93.37% - - -1408.61% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 191.64% 100.00% -91.64% - - - 0.52 47.82% - - -91.64% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 109.64% 100.00% -9.64% - - - 0.91 8.79% - - -9.64% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 3631.86% 100.00% -3531.86% - - - 0.03 97.25% - - -3531.86% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 123.75% 100.00% -23.75% - - - 0.81 19.19% - - -23.75% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 123.75% 100.00% -23.75% - - - 0.81 19.19% - - -23.75% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 65.62% 100.00% 34.38% - - - 1.52 -52.40% - - 34.38% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 17.84% 100.00% 82.16% - - - 5.60 -460.48% - - 82.16% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1980.90% 100.00% -1880.90% - - - 0.05 94.95% - - -1880.90% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 452.16% 100.00% -352.16% - - - 0.22 77.88% - - -352.16% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 546.70% 100.00% -446.70% - - - 0.18 81.71% - - -446.70% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 869.44 -86844.00% - - 99.88% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 62.74% 100.00% 37.26% - - - 1.59 -59.40% - - 37.26% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 114.62% 100.00% -14.62% - - - 0.87 12.76% - - -14.62% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 68127.27% 100.00% -68027.27% - - - 0.00 99.85% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 159.88% 100.00% -59.88% - - - 0.63 37.45% - - -59.88% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 146.97% 100.00% -46.97% - - - 0.68 31.96% - - -46.97% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 107.03% 100.00% -7.03% - - - 0.93 6.57% - - -7.03% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 81.82% 100.00% 18.18% - - - 1.22 -22.22% - - 18.18% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 267.81% 100.00% -167.81% - - - 0.37 62.66% - - -167.81% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 398.75% 100.00% -298.75% - - - 0.25 74.92% - - -298.75% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 226.55% 100.00% -126.55% - - - 0.44 55.86% - - -126.55% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 887.01% 100.00% -787.01% - - - 0.11 88.73% - - -787.01% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 12.18 -1118.00% - - 91.79% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 3.89% 100.00% 96.11% - - - 25.69 -2469.47% - - 96.11% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 3.89% 100.00% 96.11% - - - 25.69 -2469.47% - - 96.11% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 21.40% 86.12% 64.72% - - - 4.02 -302.36% - - 75.15% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 39.50% 88.00% 48.50% - - - 2.23 -122.78% - - 55.11% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 40.69% 88.00% 47.31% - - - 2.16 -116.29% - - 53.77% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 35.28% 88.00% 52.72% - - - 2.49 -149.42% - - 59.91% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 35.28% 88.00% 52.72% - - - 2.49 -149.42% - - 59.91% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 1.02% 84.00% 82.98% - - - 82.62 -8162.29% - - 98.79% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 15.22% 84.00% 68.78% - - - 5.52 -451.85% - - 81.88% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NIPLE CORRIDO DE 1/2" X 1" HG
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COPLA HG DE 1/2
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.59% 84.00% 83.41% - - - 142.25 -14124.78% - - 99.30% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
CASA # 30
- - - - - - 1.30% 1.25% 81.80% 100.00% 18.20% - - - 1.22 -22.25% - - 18.20% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 91.47% 100.00% 8.53% - - - 1.09 -9.33% - - 8.53% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 109.23% 100.00% -9.23% - - - 0.92 8.45% - - -9.23% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 137.92% 100.00% -37.92% - - - 0.73 27.49% - - -37.92% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 533635.56% 100.00% -533535.56% - - - 0.00 99.98% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 5005.01% 100.00% -4905.01% - - - 0.02 98.00% - - -4905.01% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 319.88% 100.00% -219.88% - - - 0.31 68.74% - - -219.88% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 138.44% 100.00% -38.44% - - - 0.72 27.76% - - -38.44% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 95.46% 100.00% 4.54% - - - 1.05 -4.75% - - 4.54% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 42.29% 100.00% 57.71% - - - 2.36 -136.45% - - 57.71% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 254.03% 100.00% -154.03% - - - 0.39 60.63% - - -154.03% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 304.49% 100.00% -204.49% - - - 0.33 67.16% - - -204.49% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 371.35% 100.00% -271.35% - - - 0.27 73.07% - - -271.35% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 134.82% 100.00% -34.82% - - - 0.74 25.83% - - -34.82% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 69.51% 100.00% 30.49% - - - 1.44 -43.86% - - 30.49% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.94% 100.00% 20.06% - - - 1.25 -25.09% - - 20.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.94% 100.00% 20.06% - - - 1.25 -25.09% - - 20.06% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 62.98% 100.00% 37.02% - - - 1.59 -58.78% - - 37.02% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 100.36% 100.00% -0.36% - - - 1.00 0.36% - - -0.36% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 126.97% 100.00% -26.97% - - - 0.79 21.24% - - -26.97% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 172.07% 100.00% -72.07% - - - 0.58 41.88% - - -72.07% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 106.14% 100.00% -6.14% - - - 0.94 5.79% - - -6.14% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 67.24% 100.00% 32.76% - - - 1.49 -48.71% - - 32.76% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 97.82% 100.00% 2.18% - - - 1.02 -2.23% - - 2.18% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 81.51% 100.00% 18.49% - - - 1.23 -22.69% - - 18.49% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.59% 100.00% 62.41% - - - 2.66 -166.06% - - 62.41% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 79.97% 100.00% 20.03% - - - 1.25 -25.05% - - 20.03% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 79.97% 100.00% 20.03% - - - 1.25 -25.05% - - 20.03% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 163.33% 100.00% -63.33% - - - 0.61 38.77% - - -63.33% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 86.64% 100.00% 13.36% - - - 1.15 -15.42% - - 13.36% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 101.31% 100.00% -1.31% - - - 0.99 1.30% - - -1.31% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 101.31% 100.00% -1.31% - - - 0.99 1.30% - - -1.31% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 63.19% 100.00% 36.81% - - - 1.58 -58.25% - - 36.81% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 1711.85% 100.00% -1611.85% - - - 0.06 94.16% - - -1611.85% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
MALLA DE REFUERZO 0.97X45.70 (44.32MST)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 168.05% 100.00% -68.05% - - - 0.60 40.49% - - -68.05% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 99.71% 100.00% 0.29% - - - 1.00 -0.29% - - 0.29% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 3044.53% 100.00% -2944.53% - - - 0.03 96.72% - - -2944.53% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 104.80% 100.00% -4.80% - - - 0.95 4.58% - - -4.80% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 52.28% 100.00% 47.72% - - - 1.91 -91.29% - - 47.72% - 0.00%
DISCOS P/CORTE D/METAL DE 9"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 38.75% 100.00% 61.25% - - - 2.58 -158.08% - - 61.25% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 19.24% 100.00% 80.76% - - - 5.20 -419.65% - - 80.76% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 1243.80% 100.00% -1143.80% - - - 0.08 91.96% - - -1143.80% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 498.41 -49741.00% - - 99.80% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 498.41 -49741.00% - - 99.80% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPERMEABILIZANTE FASTYL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA FINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA DE BROCA 37709 DE 7X7X16
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO TABLAYESO DE 7 X 7/16" ROSCA FINA PUNTA CORRIENTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 1 5/8" X 10' (CAL 26)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 2-1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 77.50% 100.00% 22.50% - - - 1.29 -29.04% - - 22.50% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 104.41% 100.00% -4.41% - - - 0.96 4.22% - - -4.41% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6883.42% 100.00% -6783.42% - - - 0.01 98.55% - - -6783.42% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 289.59% 100.00% -189.59% - - - 0.35 65.47% - - -189.59% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 122.75% 100.00% -22.75% - - - 0.81 18.53% - - -22.75% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 88.39% 100.00% 11.61% - - - 1.13 -13.14% - - 11.61% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.35% 100.00% 27.65% - - - 1.38 -38.21% - - 27.65% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 282.29% 100.00% -182.29% - - - 0.35 64.58% - - -182.29% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 69.76% 100.00% 30.24% - - - 1.43 -43.36% - - 30.24% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 576.67% 100.00% -476.67% - - - 0.17 82.66% - - -476.67% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 150.61% 100.00% -50.61% - - - 0.66 33.60% - - -50.61% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 871.79% 100.00% -771.79% - - - 0.11 88.53% - - -771.79% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 98.76% 100.00% 1.24% - - - 1.01 -1.25% - - 1.24% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 56.87% 100.00% 43.13% - - - 1.76 -75.83% - - 43.13% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLANCHA DE THERMOPOR DE 2*50*100 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 48.93% 100.00% 51.07% - - - 2.04 -104.37% - - 51.07% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 48.93% 100.00% 51.07% - - - 2.04 -104.37% - - 51.07% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 91.76% 100.00% 8.24% - - - 1.09 -8.98% - - 8.24% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 80.11% 100.00% 19.89% - - - 1.25 -24.84% - - 19.89% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 588.64% 100.00% -488.64% - - - 0.17 83.01% - - -488.64% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 543.47% 100.00% -443.47% - - - 0.18 81.60% - - -443.47% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 543.47% 100.00% -443.47% - - - 0.18 81.60% - - -443.47% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 12' TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIA VIDRIO LIQUIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DETERGENTE ESPUMIL 1000 GRS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESINFECTANTE OLIMPO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
THINNER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 145.60% 100.00% -45.60% - - - 0.69 31.32% - - -45.60% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 226.90% 100.00% -126.90% - - - 0.44 55.93% - - -126.90% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 220.63% 100.00% -120.63% - - - 0.45 54.68% - - -120.63% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 220.63% 100.00% -120.63% - - - 0.45 54.68% - - -120.63% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 102.40% 100.00% -2.40% - - - 0.98 2.35% - - -2.40% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 102.40% 100.00% -2.40% - - - 0.98 2.35% - - -2.40% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 118.14% 100.00% -18.14% - - - 0.85 15.35% - - -18.14% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.08% 100.00% -3.08% - - - 0.97 2.99% - - -3.08% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 84.56% 100.00% 15.44% - - - 1.18 -18.26% - - 15.44% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 100.00% 67.70% - - - 3.10 -209.63% - - 67.70% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 101.88% 100.00% -1.88% - - - 0.98 1.84% - - -1.88% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 101.88% 100.00% -1.88% - - - 0.98 1.84% - - -1.88% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 101.88% 100.00% -1.88% - - - 0.98 1.84% - - -1.88% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 101.88% 100.00% -1.88% - - - 0.98 1.84% - - -1.88% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 101.37% 100.00% -1.37% - - - 0.99 1.36% - - -1.37% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 95.92% 100.00% 4.08% - - - 1.04 -4.25% - - 4.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 78.96% 100.00% 21.04% - - - 1.27 -26.64% - - 21.04% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 65.52% 100.00% 34.48% - - - 1.53 -52.62% - - 34.48% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 65.52% 100.00% 34.48% - - - 1.53 -52.62% - - 34.48% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 29.53% 100.00% 70.47% - - - 3.39 -238.68% - - 70.47% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
THINNER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 47.77% 100.00% 52.23% - - - 2.09 -109.33% - - 52.23% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 130.90% 100.00% -30.90% - - - 0.76 23.61% - - -30.90% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 126.79% 100.00% -26.79% - - - 0.79 21.13% - - -26.79% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 193.01% 100.00% -93.01% - - - 0.52 48.19% - - -93.01% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 110.09% 100.00% -10.09% - - - 0.91 9.17% - - -10.09% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 286.43% 100.00% -186.43% - - - 0.35 65.09% - - -186.43% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 136.03% 100.00% -36.03% - - - 0.74 26.49% - - -36.03% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 70.18% 100.00% 29.82% - - - 1.42 -42.50% - - 29.82% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 3.59% 100.00% 96.41% - - - 27.87 -2687.30% - - 96.41% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 3.59% 100.00% 96.41% - - - 27.87 -2687.30% - - 96.41% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 38.07% 100.00% 61.93% - - - 2.63 -162.66% - - 61.93% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 2-1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 1.69% 100.00% 98.31% - - - 59.30 -5829.62% - - 98.31% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 59.03% 100.00% 40.97% - - - 1.69 -69.40% - - 40.97% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.15% 100.00% -0.15% - - - 1.00 0.15% - - -0.15% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 100.00% -3.14% - - - 0.97 3.04% - - -3.14% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.42% 100.00% 99.58% - - - 239.21 -23820.67% - - 99.58% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 12.71% 100.00% 87.29% - - - 7.87 -686.51% - - 87.29% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 12.92% 100.00% 87.08% - - - 7.74 -673.70% - - 87.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 5.70% 100.00% 94.30% - - - 17.55 -1654.91% - - 94.30% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 32
- - - - - - 1.30% 1.26% 81.16% 100.00% 18.84% - - - 1.23 -23.21% - - 18.84% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 95.00% 100.00% 5.00% - - - 1.05 -5.26% - - 5.00% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 104.49% 100.00% -4.49% - - - 0.96 4.29% - - -4.49% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 143.90% 100.00% -43.90% - - - 0.69 30.51% - - -43.90% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 143.90% 100.00% -43.90% - - - 0.69 30.51% - - -43.90% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 40.39% 100.00% 59.61% - - - 2.48 -147.61% - - 59.61% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 1457.80% 100.00% -1357.80% - - - 0.07 93.14% - - -1357.80% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
MALLA DE REFUERZO 0.97X45.70 (44.32MST)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 178.04% 100.00% -78.04% - - - 0.56 43.83% - - -78.04% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 118.15% 100.00% -18.15% - - - 0.85 15.36% - - -18.15% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 2734.54% 100.00% -2634.54% - - - 0.04 96.34% - - -2634.54% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 123.75% 100.00% -23.75% - - - 0.81 19.19% - - -23.75% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 123.75% 100.00% -23.75% - - - 0.81 19.19% - - -23.75% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 5.27% 100.00% 94.73% - - - 18.99 -1798.85% - - 94.73% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 248.91 -24791.00% - - 99.60% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 459.65% 100.00% -359.65% - - - 0.22 78.24% - - -359.65% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 4.57% 100.00% 95.43% - - - 21.88 -2087.82% - - 95.43% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA DE BROCA 37709 DE 7X7X16
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 1 5/8" X 10' (CAL 26)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 104.32% 100.00% -4.32% - - - 0.96 4.14% - - -4.32% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 127.39% 100.00% -27.39% - - - 0.78 21.50% - - -27.39% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 211544.44% 100.00% -211444.44% - - - 0.00 99.95% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 8547.75% 100.00% -8447.75% - - - 0.01 98.83% - - -8447.75% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 151.57% 100.00% -51.57% - - - 0.66 34.02% - - -51.57% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 149.25% 100.00% -49.25% - - - 0.67 33.00% - - -49.25% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 93.05% 100.00% 6.95% - - - 1.07 -7.47% - - 6.95% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 98.95% 100.00% 1.05% - - - 1.01 -1.06% - - 1.05% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 97.73% 100.00% 2.27% - - - 1.02 -2.33% - - 2.27% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 55.48% 100.00% 44.52% - - - 1.80 -80.25% - - 44.52% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 190.08% 100.00% -90.08% - - - 0.53 47.39% - - -90.08% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 232.66% 100.00% -132.66% - - - 0.43 57.02% - - -132.66% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 81.50% 100.00% 18.50% - - - 1.23 -22.70% - - 18.50% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 81.50% 100.00% 18.50% - - - 1.23 -22.70% - - 18.50% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 62.98% 100.00% 37.02% - - - 1.59 -58.78% - - 37.02% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 103.87% 100.00% -3.87% - - - 0.96 3.72% - - -3.87% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 131.18% 100.00% -31.18% - - - 0.76 23.77% - - -31.18% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 172.07% 100.00% -72.07% - - - 0.58 41.88% - - -72.07% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 116.06% 100.00% -16.06% - - - 0.86 13.84% - - -16.06% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 48.63% 100.00% 51.37% - - - 2.06 -105.63% - - 51.37% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 86.32% 100.00% 13.68% - - - 1.16 -15.85% - - 13.68% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 125.80% 100.00% -25.80% - - - 0.79 20.51% - - -25.80% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.59% 100.00% 62.41% - - - 2.66 -166.06% - - 62.41% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 83.03% 100.00% 16.97% - - - 1.20 -20.45% - - 16.97% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 83.03% 100.00% 16.97% - - - 1.20 -20.45% - - 16.97% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 163.33% 100.00% -63.33% - - - 0.61 38.77% - - -63.33% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 77.34% 100.00% 22.66% - - - 1.29 -29.30% - - 22.66% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 104.12% 100.00% -4.12% - - - 0.96 3.96% - - -4.12% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 338780.00% 100.00% -338680.00% - - - 0.00 99.97% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 9789.16% 100.00% -9689.16% - - - 0.01 98.98% - - -9689.16% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 2389.03% 100.00% -2289.03% - - - 0.04 95.81% - - -2289.03% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 312.19% 100.00% -212.19% - - - 0.32 67.97% - - -212.19% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 110.61% 100.00% -10.61% - - - 0.90 9.59% - - -10.61% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 75.44% 100.00% 24.56% - - - 1.33 -32.55% - - 24.56% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.95% 100.00% 28.05% - - - 1.39 -38.99% - - 28.05% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 271.21% 100.00% -171.21% - - - 0.37 63.13% - - -171.21% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 211.59% 100.00% -111.59% - - - 0.47 52.74% - - -111.59% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 266.39% 100.00% -166.39% - - - 0.38 62.46% - - -166.39% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 143.07% 100.00% -43.07% - - - 0.70 30.10% - - -43.07% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 874.04% 100.00% -774.04% - - - 0.11 88.56% - - -774.04% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 90.48% 100.00% 9.52% - - - 1.11 -10.52% - - 9.52% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 56.87% 100.00% 43.13% - - - 1.76 -75.83% - - 43.13% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLANCHA DE THERMOPOR DE 2*50*100 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 48.93% 100.00% 51.07% - - - 2.04 -104.37% - - 51.07% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 48.93% 100.00% 51.07% - - - 2.04 -104.37% - - 51.07% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 91.76% 100.00% 8.24% - - - 1.09 -8.98% - - 8.24% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 75.27% 100.00% 24.73% - - - 1.33 -32.86% - - 24.73% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 557.62% 100.00% -457.62% - - - 0.18 82.07% - - -457.62% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 541.41% 100.00% -441.41% - - - 0.18 81.53% - - -441.41% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 541.41% 100.00% -441.41% - - - 0.18 81.53% - - -441.41% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 12' TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACIDO MURIATICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIA VIDRIO LIQUIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DETERGENTE ESPUMIL 1000 GRS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESINFECTANTE OLIMPO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 116.30% 100.00% -16.30% - - - 0.86 14.02% - - -16.30% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 102.79% 100.00% -2.79% - - - 0.97 2.71% - - -2.79% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 102.79% 100.00% -2.79% - - - 0.97 2.71% - - -2.79% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 102.79% 100.00% -2.79% - - - 0.97 2.71% - - -2.79% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 115.10% 100.00% -15.10% - - - 0.87 13.12% - - -15.10% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 171.08% 100.00% -71.08% - - - 0.58 41.55% - - -71.08% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 159.91% 100.00% -59.91% - - - 0.63 37.46% - - -59.91% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 159.91% 100.00% -59.91% - - - 0.63 37.46% - - -59.91% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 85.36% 100.00% 14.64% - - - 1.17 -17.15% - - 14.64% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 85.11% 100.00% 14.89% - - - 1.17 -17.50% - - 14.89% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.08% 100.00% -3.08% - - - 0.97 2.99% - - -3.08% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 84.56% 100.00% 15.44% - - - 1.18 -18.26% - - 15.44% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 100.00% 67.70% - - - 3.10 -209.63% - - 67.70% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
THINNER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 99.90% 100.00% 0.10% - - - 1.00 -0.10% - - 0.10% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 95.92% 100.00% 4.08% - - - 1.04 -4.25% - - 4.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIURETANO MARCA DYMONIC 100
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 80.61% 100.00% 19.39% - - - 1.24 -24.05% - - 19.39% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 65.52% 100.00% 34.48% - - - 1.53 -52.62% - - 34.48% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 65.52% 100.00% 34.48% - - - 1.53 -52.62% - - 34.48% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 29.53% 100.00% 70.47% - - - 3.39 -238.68% - - 70.47% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 45.43% 100.00% 54.57% - - - 2.20 -120.12% - - 54.57% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 130.90% 100.00% -30.90% - - - 0.76 23.61% - - -30.90% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 126.79% 100.00% -26.79% - - - 0.79 21.13% - - -26.79% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 193.01% 100.00% -93.01% - - - 0.52 48.19% - - -93.01% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 110.09% 100.00% -10.09% - - - 0.91 9.17% - - -10.09% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 286.43% 100.00% -186.43% - - - 0.35 65.09% - - -186.43% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 136.03% 100.00% -36.03% - - - 0.74 26.49% - - -36.03% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 70.18% 100.00% 29.82% - - - 1.42 -42.50% - - 29.82% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 43.62% 100.00% 56.38% - - - 2.29 -129.28% - - 56.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 43.62% 100.00% 56.38% - - - 2.29 -129.28% - - 56.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 43.62% 100.00% 56.38% - - - 2.29 -129.28% - - 56.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 43.62% 100.00% 56.38% - - - 2.29 -129.28% - - 56.38% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 55.39% 100.00% 44.61% - - - 1.81 -80.53% - - 44.61% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 101.59% 100.00% -1.59% - - - 0.98 1.56% - - -1.59% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 100.00% -3.14% - - - 0.97 3.04% - - -3.14% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 49.87% 100.00% 50.13% - - - 2.01 -100.52% - - 50.13% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 3.35% 100.00% 96.65% - - - 29.82 -2881.90% - - 96.65% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 42.74% 100.00% 57.26% - - - 2.34 -133.99% - - 57.26% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 2.17% 100.00% 97.83% - - - 46.04 -4503.90% - - 97.83% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
CASA # 27
- - - - - - 1.30% 1.26% 79.17% 100.00% 20.83% - - - 1.26 -26.32% - - 20.83% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 83.86% 100.00% 16.14% - - - 1.19 -19.25% - - 16.14% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 109.41% 100.00% -9.41% - - - 0.91 8.60% - - -9.41% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 134.46% 100.00% -34.46% - - - 0.74 25.63% - - -34.46% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 218.44% 100.00% -118.44% - - - 0.46 54.22% - - -118.44% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE BOMBEO CONVENCIONAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION CON PLUMA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 56.53% 100.00% 43.47% - - - 1.77 -76.89% - - 43.47% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 326.34 -32534.00% - - 99.69% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 4.28% 100.00% 95.72% - - - 23.38 -2238.36% - - 95.72% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 95.43% 100.00% 4.57% - - - 1.05 -4.79% - - 4.57% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.59% 100.00% 62.41% - - - 2.66 -166.06% - - 62.41% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 4" X 4" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 91.81% 100.00% 8.19% - - - 1.09 -8.92% - - 8.19% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 91.81% 100.00% 8.19% - - - 1.09 -8.92% - - 8.19% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 88.15% 100.00% 11.85% - - - 1.13 -13.45% - - 11.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 106.49% 100.00% -6.49% - - - 0.94 6.10% - - -6.49% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 106.49% 100.00% -6.49% - - - 0.94 6.10% - - -6.49% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 58.65% 100.00% 41.35% - - - 1.71 -70.52% - - 41.35% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2278.43% 100.00% -2178.43% - - - 0.04 95.61% - - -2178.43% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
MALLA DE REFUERZO 0.97X45.70 (44.32MST)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICONE SISTA 280ML BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 294.52% 100.00% -194.52% - - - 0.34 66.05% - - -194.52% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 71.68% 100.00% 28.32% - - - 1.40 -39.50% - - 28.32% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 169.95% 100.00% -69.95% - - - 0.59 41.16% - - -69.95% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 1046.59% 100.00% -946.59% - - - 0.10 90.45% - - -946.59% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 68.06% 100.00% 31.94% - - - 1.47 -46.92% - - 31.94% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 68.06% 100.00% 31.94% - - - 1.47 -46.92% - - 31.94% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 11.78% 100.00% 88.22% - - - 8.49 -749.02% - - 88.22% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 28.87% 100.00% 71.13% - - - 3.46 -246.43% - - 71.13% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 854.18% 100.00% -754.18% - - - 0.12 88.29% - - -754.18% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 2.59% 100.00% 97.41% - - - 38.57 -3757.32% - - 97.41% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
BROCAS PARA CONCRETO SDS 3/8 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA DE BROCA 37709 DE 7X7X16
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 1 5/8" X 10' (CAL 26)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 86.17% 100.00% 13.83% - - - 1.16 -16.05% - - 13.83% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 117.73% 100.00% -17.73% - - - 0.85 15.06% - - -17.73% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 243921.82% 100.00% -243821.82% - - - 0.00 99.96% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 23330.38% 100.00% -23230.38% - - - 0.00 99.57% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EMULSIKA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 292.59% 100.00% -192.59% - - - 0.34 65.82% - - -192.59% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 147.73% 100.00% -47.73% - - - 0.68 32.31% - - -47.73% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 88.40% 100.00% 11.60% - - - 1.13 -13.12% - - 11.60% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 46.15% 100.00% 53.85% - - - 2.17 -116.69% - - 53.85% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 9.69% 100.00% 90.31% - - - 10.31 -931.47% - - 90.31% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 354.77% 100.00% -254.77% - - - 0.28 71.81% - - -254.77% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 418.54% 100.00% -318.54% - - - 0.24 76.11% - - -318.54% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1608.12% 100.00% -1508.12% - - - 0.06 93.78% - - -1508.12% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 160.94% 100.00% -60.94% - - - 0.62 37.87% - - -60.94% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 582.96% 100.00% -482.96% - - - 0.17 82.85% - - -482.96% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 90.48% 100.00% 9.52% - - - 1.11 -10.52% - - 9.52% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 56.87% 100.00% 43.13% - - - 1.76 -75.83% - - 43.13% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLANCHA DE THERMOPOR DE 2*50*100 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 52.48% 100.00% 47.52% - - - 1.91 -90.54% - - 47.52% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 52.48% 100.00% 47.52% - - - 1.91 -90.54% - - 47.52% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 91.76% 100.00% 8.24% - - - 1.09 -8.98% - - 8.24% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 66.54% 100.00% 33.46% - - - 1.50 -50.29% - - 33.46% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 75.48% 100.00% 24.52% - - - 1.32 -32.49% - - 24.52% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 75.48% 100.00% 24.52% - - - 1.32 -32.49% - - 24.52% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 62.98% 100.00% 37.02% - - - 1.59 -58.78% - - 37.02% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 61.45% 100.00% 38.55% - - - 1.63 -62.73% - - 38.55% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2522.52% 100.00% -2422.52% - - - 0.04 96.04% - - -2422.52% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 343.06% 100.00% -243.06% - - - 0.29 70.85% - - -243.06% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 152.67% 100.00% -52.67% - - - 0.66 34.50% - - -52.67% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 136.26% 100.00% -36.26% - - - 0.73 26.61% - - -36.26% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 48.55% 100.00% 51.45% - - - 2.06 -105.96% - - 51.45% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 254.03% 100.00% -154.03% - - - 0.39 60.63% - - -154.03% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 257.34% 100.00% -157.34% - - - 0.39 61.14% - - -157.34% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 362.05% 100.00% -262.05% - - - 0.28 72.38% - - -262.05% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 10.07% 100.00% 89.93% - - - 9.93 -892.94% - - 89.93% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.44% 82.40% 100.00% 17.60% - - - 1.21 -21.35% - - 17.60% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 307.89% 100.00% -207.89% - - - 0.32 67.52% - - -207.89% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 296.13% 100.00% -196.13% - - - 0.34 66.23% - - -196.13% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 296.13% 100.00% -196.13% - - - 0.34 66.23% - - -196.13% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 12' TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIA VIDRIO LIQUIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DETERGENTE ESPUMIL 1000 GRS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESINFECTANTE OLIMPO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 174.91% 100.00% -74.91% - - - 0.57 42.83% - - -74.91% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 174.91% 100.00% -74.91% - - - 0.57 42.83% - - -74.91% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 174.91% 100.00% -74.91% - - - 0.57 42.83% - - -74.91% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 493.16 -49216.00% - - 99.80% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 147.15% 100.00% -47.15% - - - 0.68 32.04% - - -47.15% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 213.33% 100.00% -113.33% - - - 0.47 53.13% - - -113.33% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 202.20% 100.00% -102.20% - - - 0.49 50.54% - - -102.20% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 202.20% 100.00% -102.20% - - - 0.49 50.54% - - -102.20% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 111.99% 100.00% -11.99% - - - 0.89 10.71% - - -11.99% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 104.77% 100.00% -4.77% - - - 0.95 4.55% - - -4.77% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.41% 100.00% 59.59% - - - 2.47 -147.46% - - 59.59% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 118.14% 100.00% -18.14% - - - 0.85 15.35% - - -18.14% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 86.98% 100.00% 13.02% - - - 1.15 -14.96% - - 13.02% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.08% 100.00% -3.08% - - - 0.97 2.99% - - -3.08% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 84.23% 100.00% 15.77% - - - 1.19 -18.72% - - 15.77% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 31.22% 100.00% 68.78% - - - 3.20 -220.31% - - 68.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 2''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 102.04% 100.00% -2.04% - - - 0.98 2.00% - - -2.04% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 98.89% 100.00% 1.11% - - - 1.01 -1.12% - - 1.11% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 4.35% 100.00% 95.65% - - - 22.98 -2197.74% - - 95.65% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA ELECTRICA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BARRENO ROTOMARTILLO ELEC. TRUPER 1/2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCA DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 82.27% 100.00% 17.73% - - - 1.22 -21.56% - - 17.73% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 77.19% 100.00% 22.81% - - - 1.30 -29.55% - - 22.81% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 77.19% 100.00% 22.81% - - - 1.30 -29.55% - - 22.81% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 37.27% 100.00% 62.73% - - - 2.68 -168.29% - - 62.73% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.09% 73.90% 100.00% 26.10% - - - 1.35 -35.32% - - 26.10% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 77.52% 100.00% 22.48% - - - 1.29 -28.99% - - 22.48% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 77.52% 100.00% 22.48% - - - 1.29 -28.99% - - 22.48% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 77.52% 100.00% 22.48% - - - 1.29 -28.99% - - 22.48% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.28% 100.00% 93.72% - - - 15.93 -1492.52% - - 93.72% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 11.00% 100.00% 89.00% - - - 9.09 -809.31% - - 89.00% - 0.00%
SILICONE SISTA 280ML BLANCO
- - - - - - 0.00% 0.00% 11.00% 100.00% 89.00% - - - 9.09 -809.31% - - 89.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 1.56% 100.00% 98.44% - - - 64.05 -6304.76% - - 98.44% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 1.56% 100.00% 98.44% - - - 64.05 -6304.76% - - 98.44% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 48.30% 100.00% 51.70% - - - 2.07 -107.04% - - 51.70% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 136.33% 100.00% -36.33% - - - 0.73 26.65% - - -36.33% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 132.22% 100.00% -32.22% - - - 0.76 24.37% - - -32.22% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 193.01% 100.00% -93.01% - - - 0.52 48.19% - - -93.01% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 62.22% 100.00% 37.78% - - - 1.61 -60.71% - - 37.78% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 110.09% 100.00% -10.09% - - - 0.91 9.17% - - -10.09% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 286.43% 100.00% -186.43% - - - 0.35 65.09% - - -186.43% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 100.00% 3.30% - - - 1.03 -3.41% - - 3.30% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 129.63% 100.00% -29.63% - - - 0.77 22.86% - - -29.63% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 1.51% 100.00% 98.49% - - - 66.20 -6519.75% - - 98.49% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 1.51% 100.00% 98.49% - - - 66.20 -6519.75% - - 98.49% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 42.69% 100.00% 57.31% - - - 2.34 -134.26% - - 57.31% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 42.69% 100.00% 57.31% - - - 2.34 -134.26% - - 57.31% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 42.69% 100.00% 57.31% - - - 2.34 -134.26% - - 57.31% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 42.69% 100.00% 57.31% - - - 2.34 -134.26% - - 57.31% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 35.60% 100.00% 64.40% - - - 2.81 -180.88% - - 64.40% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 22.29% 100.00% 77.71% - - - 4.49 -348.65% - - 77.71% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 60.14% 100.00% 39.86% - - - 1.66 -66.28% - - 39.86% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.37% 100.00% -0.37% - - - 1.00 0.36% - - -0.37% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.37% 100.00% -3.37% - - - 0.97 3.26% - - -3.37% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.28% 100.00% 99.72% - - - 362.43 -36143.43% - - 99.72% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 14.82% 100.00% 85.18% - - - 6.75 -574.63% - - 85.18% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 15.10% 100.00% 84.90% - - - 6.62 -562.40% - - 84.90% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 5.70% 100.00% 94.30% - - - 17.55 -1654.91% - - 94.30% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 25
- - - - - - 1.30% 1.25% 78.79% 100.00% 21.21% - - - 1.27 -26.91% - - 21.21% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 85.17% 100.00% 14.83% - - - 1.17 -17.42% - - 14.83% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 546.15% 100.00% -446.15% - - - 0.18 81.69% - - -446.15% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 501.47% 100.00% -401.47% - - - 0.20 80.06% - - -401.47% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 501.47% 100.00% -401.47% - - - 0.20 80.06% - - -401.47% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SEGURIDAD INDUSTRIAL',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GUANTES DE LATEX
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASCARILLAS KN95
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 5 TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 12' TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MANO DE OBRA PLANILLA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PERSONAL DE OBRA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIA VIDRIO LIQUIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DETERGENTE ESPUMIL 1000 GRS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SQUEEGEE LIMPIADOR DE VIDRIOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 121.14% 100.00% -21.14% - - - 0.83 17.45% - - -21.14% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 171.21% 100.00% -71.21% - - - 0.58 41.59% - - -71.21% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 155.70% 100.00% -55.70% - - - 0.64 35.77% - - -55.70% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 155.70% 100.00% -55.70% - - - 0.64 35.77% - - -55.70% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 94.54% 100.00% 5.46% - - - 1.06 -5.77% - - 5.46% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 93.77% 100.00% 6.23% - - - 1.07 -6.65% - - 6.23% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 118.95% 100.00% -18.95% - - - 0.84 15.93% - - -18.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 86.98% 100.00% 13.02% - - - 1.15 -14.96% - - 13.02% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.15% 100.00% -3.15% - - - 0.97 3.06% - - -3.15% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 84.56% 100.00% 15.44% - - - 1.18 -18.26% - - 15.44% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 31.22% 100.00% 68.78% - - - 3.20 -220.31% - - 68.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 2''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 100.64% 100.00% -0.64% - - - 0.99 0.63% - - -0.64% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 100.03% 100.00% -0.03% - - - 1.00 0.03% - - -0.03% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 100.03% 100.00% -0.03% - - - 1.00 0.03% - - -0.03% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 100.03% 100.00% -0.03% - - - 1.00 0.03% - - -0.03% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA METALICA DE 2" MANGO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 5 TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 1''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 100.62% 100.00% -0.62% - - - 0.99 0.61% - - -0.62% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 95.92% 100.00% 4.08% - - - 1.04 -4.25% - - 4.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #220 H-98 O A-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #150 H-98 O C-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 100 P/AGUA BASE DE LONA 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 93.49% 100.00% 6.51% - - - 1.07 -6.96% - - 6.51% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 88.42% 100.00% 11.58% - - - 1.13 -13.10% - - 11.58% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 88.42% 100.00% 11.58% - - - 1.13 -13.10% - - 11.58% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 52.42% 100.00% 47.58% - - - 1.91 -90.77% - - 47.58% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 80.20% 100.00% 19.80% - - - 1.25 -24.69% - - 19.80% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 79.66% 100.00% 20.34% - - - 1.26 -25.54% - - 20.34% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 10.74% 100.00% 89.26% - - - 9.31 -830.72% - - 89.26% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 30.96% 100.00% 69.04% - - - 3.23 -223.01% - - 69.04% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 26.85% 100.00% 73.15% - - - 3.72 -272.39% - - 73.15% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 354.38 -35338.00% - - 99.72% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 62.22% 100.00% 37.78% - - - 1.61 -60.71% - - 37.78% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 500.50 -49950.00% - - 99.80% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 506.24 -50524.00% - - 99.80% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2326.71 -232571.00% - - 99.96% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 100.00% 100.00% - - - 1539.00 -153800.00% - - 99.94% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONTRALLAVE 1/2 X 1/4 A LA PARED ICE MAKER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 82.91% 100.00% 17.09% - - - 1.21 -20.61% - - 17.09% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 110.13% 100.00% -10.13% - - - 0.91 9.20% - - -10.13% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 144.30% 100.00% -44.30% - - - 0.69 30.70% - - -44.30% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 207.49% 100.00% -107.49% - - - 0.48 51.81% - - -107.49% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 109.17% 100.00% -9.17% - - - 0.92 8.40% - - -9.17% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 46.39% 100.00% 53.61% - - - 2.16 -115.56% - - 53.61% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 95.99% 100.00% 4.01% - - - 1.04 -4.17% - - 4.01% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 95.43% 100.00% 4.57% - - - 1.05 -4.79% - - 4.57% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.59% 100.00% 62.41% - - - 2.66 -166.06% - - 62.41% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 81.94% 100.00% 18.06% - - - 1.22 -22.05% - - 18.06% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 81.94% 100.00% 18.06% - - - 1.22 -22.05% - - 18.06% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 182.55% 100.00% -82.55% - - - 0.55 45.22% - - -82.55% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 86.88% 100.00% 13.12% - - - 1.15 -15.10% - - 13.12% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 116.41% 100.00% -16.41% - - - 0.86 14.10% - - -16.41% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 116.41% 100.00% -16.41% - - - 0.86 14.10% - - -16.41% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 38.93% 100.00% 61.07% - - - 2.57 -156.89% - - 61.07% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2074.17% 100.00% -1974.17% - - - 0.05 95.18% - - -1974.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MALLA DE REFUERZO 0.97X45.70 (44.32MST)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 440.90% 100.00% -340.90% - - - 0.23 77.32% - - -340.90% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 440.90% 100.00% -340.90% - - - 0.23 77.32% - - -340.90% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 113.24% 100.00% -13.24% - - - 0.88 11.69% - - -13.24% - 0.00%
MONOCAPA BLANCO EXTRA FINO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 71.68% 100.00% 28.32% - - - 1.40 -39.50% - - 28.32% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 98.77% 100.00% 1.23% - - - 1.01 -1.25% - - 1.23% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 314.13% 100.00% -214.13% - - - 0.32 68.17% - - -214.13% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 27.03% 100.00% 72.97% - - - 3.70 -269.97% - - 72.97% - 0.00%
LIJA P/AGUA #220 H-98 O A-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 2.45% 100.00% 97.55% - - - 40.89 -3989.44% - - 97.55% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 248.91 -24791.00% - - 99.60% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA DE BROCA 37709 DE 7X7X16
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 1 5/8" X 10' (CAL 26)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 76.74% 100.00% 23.26% - - - 1.30 -30.30% - - 23.26% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 80.63% 100.00% 19.37% - - - 1.24 -24.02% - - 19.37% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 615733.33% 100.00% -615633.33% - - - 0.00 99.98% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 5025.03% 100.00% -4925.03% - - - 0.02 98.01% - - -4925.03% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 387.24% 100.00% -287.24% - - - 0.26 74.18% - - -287.24% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 152.17% 100.00% -52.17% - - - 0.66 34.28% - - -52.17% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 136.26% 100.00% -36.26% - - - 0.73 26.61% - - -36.26% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 53.78% 100.00% 46.22% - - - 1.86 -85.96% - - 46.22% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 254.20% 100.00% -154.20% - - - 0.39 60.66% - - -154.20% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 257.40% 100.00% -157.40% - - - 0.39 61.15% - - -157.40% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 278.20% 100.00% -178.20% - - - 0.36 64.06% - - -178.20% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 24.23% 100.00% 75.77% - - - 4.13 -312.68% - - 75.77% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 75.48% 100.00% 24.52% - - - 1.32 -32.49% - - 24.52% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 75.48% 100.00% 24.52% - - - 1.32 -32.49% - - 24.52% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 62.98% 100.00% 37.02% - - - 1.59 -58.78% - - 37.02% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 75.76% 100.00% 24.24% - - - 1.32 -31.99% - - 24.24% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 105.46% 100.00% -5.46% - - - 0.95 5.18% - - -5.46% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 5172.41% 100.00% -5072.41% - - - 0.02 98.07% - - -5072.41% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 249.90% 100.00% -149.90% - - - 0.40 59.98% - - -149.90% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 131.47% 100.00% -31.47% - - - 0.76 23.94% - - -31.47% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 123.41% 100.00% -23.41% - - - 0.81 18.97% - - -23.41% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 77.70% 100.00% 22.30% - - - 1.29 -28.70% - - 22.30% - 0.00%
ACERO DE 1/2 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 9.69% 100.00% 90.31% - - - 10.31 -931.47% - - 90.31% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 169.41% 100.00% -69.41% - - - 0.59 40.97% - - -69.41% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.27% 100.00% -109.27% - - - 0.48 52.21% - - -109.27% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 97.73% 100.00% 2.27% - - - 1.02 -2.32% - - 2.27% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 141.24% 100.00% -41.24% - - - 0.71 29.20% - - -41.24% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 581.56% 100.00% -481.56% - - - 0.17 82.80% - - -481.56% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 96.41% 100.00% 3.59% - - - 1.04 -3.73% - - 3.59% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 54.60% 100.00% 45.40% - - - 1.83 -83.16% - - 45.40% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLANCHA DE THERMOPOR DE 2*50*100 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 43.82% 100.00% 56.18% - - - 2.28 -128.20% - - 56.18% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 43.82% 100.00% 56.18% - - - 2.28 -128.20% - - 56.18% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 45.18% 100.00% 54.82% - - - 2.21 -121.36% - - 54.82% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 55.32% 100.00% 44.68% - - - 1.81 -80.76% - - 44.68% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.13% 100.00% -0.13% - - - 1.00 0.13% - - -0.13% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 100.00% -3.14% - - - 0.97 3.04% - - -3.14% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 4.84% 100.00% 95.16% - - - 20.67 -1967.08% - - 95.16% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 5.70% 100.00% 94.30% - - - 17.55 -1654.91% - - 94.30% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 4.81% 100.00% 95.19% - - - 20.78 -1978.17% - - 95.19% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
CASA # 31
- - - - - - 1.30% 1.25% 78.21% 100.00% 21.79% - - - 1.28 -27.87% - - 21.79% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 91.08% 100.00% 8.92% - - - 1.10 -9.79% - - 8.92% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 118.88% 100.00% -18.88% - - - 0.84 15.88% - - -18.88% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 164.37% 100.00% -64.37% - - - 0.61 39.16% - - -64.37% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 164.37% 100.00% -64.37% - - - 0.61 39.16% - - -64.37% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 44.88% 100.00% 55.12% - - - 2.23 -122.83% - - 55.12% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 3301.11% 100.00% -3201.11% - - - 0.03 96.97% - - -3201.11% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
MALLA DE REFUERZO 0.97X45.70 (44.32MST)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 144.08% 100.00% -44.08% - - - 0.69 30.60% - - -44.08% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 106.47% 100.00% -6.47% - - - 0.94 6.08% - - -6.47% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 1787.42% 100.00% -1687.42% - - - 0.06 94.41% - - -1687.42% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 25.15% 100.00% 74.85% - - - 3.98 -297.59% - - 74.85% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 100 P/AGUA BASE DE LONA 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 12.38% 100.00% 87.62% - - - 8.08 -708.06% - - 87.62% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 12.38% 100.00% 87.62% - - - 8.08 -708.06% - - 87.62% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 2.45% 100.00% 97.55% - - - 40.89 -3989.44% - - 97.55% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 248.91 -24791.00% - - 99.60% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPERMEABILIZANTE FASTYL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1/2" PUNTA DE BROCA 37709 DE 7X7X16
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DECOPASTA EXTERIOR PARA TABLA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BASECOAT DUROCK SACO 22 KG USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TORNILLO DE 1 1/2" PARA DUROCK
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 1 5/8" X 10' (CAL 26)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 10' (CAL 22) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 101.73% 100.00% -1.73% - - - 0.98 1.70% - - -1.73% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 127.02% 100.00% -27.02% - - - 0.79 21.27% - - -27.02% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 172.07% 100.00% -72.07% - - - 0.58 41.88% - - -72.07% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 106.28% 100.00% -6.28% - - - 0.94 5.91% - - -6.28% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 47.07% 100.00% 52.93% - - - 2.12 -112.45% - - 52.93% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 99.60% 100.00% 0.40% - - - 1.00 -0.40% - - 0.40% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 82.89% 100.00% 17.11% - - - 1.21 -20.65% - - 17.11% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.59% 100.00% 62.41% - - - 2.66 -166.06% - - 62.41% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 83.03% 100.00% 16.97% - - - 1.20 -20.45% - - 16.97% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 83.03% 100.00% 16.97% - - - 1.20 -20.45% - - 16.97% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 163.33% 100.00% -63.33% - - - 0.61 38.77% - - -63.33% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 82.11% 100.00% 17.89% - - - 1.22 -21.78% - - 17.89% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 84.87% 100.00% 15.13% - - - 1.18 -17.82% - - 15.13% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 926440.00% 100.00% -926340.00% - - - 0.00 99.99% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6776.38% 100.00% -6676.38% - - - 0.01 98.52% - - -6676.38% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 319.88% 100.00% -219.88% - - - 0.31 68.74% - - -219.88% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 106.10% 100.00% -6.10% - - - 0.94 5.75% - - -6.10% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 97.73% 100.00% 2.27% - - - 1.02 -2.33% - - 2.27% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 65.16% 100.00% 34.84% - - - 1.53 -53.46% - - 34.84% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 89.46% 100.00% 10.54% - - - 1.12 -11.78% - - 10.54% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 190.08% 100.00% -90.08% - - - 0.53 47.39% - - -90.08% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 232.66% 100.00% -132.66% - - - 0.43 57.02% - - -132.66% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 49.86% 100.00% 50.14% - - - 2.01 -100.57% - - 50.14% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO FLUIDO 3003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 82.42% 100.00% 17.58% - - - 1.21 -21.33% - - 17.58% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 82.42% 100.00% 17.58% - - - 1.21 -21.33% - - 17.58% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 62.98% 100.00% 37.02% - - - 1.59 -58.78% - - 37.02% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 74.22% 100.00% 25.78% - - - 1.35 -34.73% - - 25.78% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 98.78% 100.00% 1.22% - - - 1.01 -1.23% - - 1.22% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 13894.25% 100.00% -13794.25% - - - 0.01 99.28% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 289.59% 100.00% -189.59% - - - 0.35 65.47% - - -189.59% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 122.82% 100.00% -22.82% - - - 0.81 18.58% - - -22.82% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 88.39% 100.00% 11.61% - - - 1.13 -13.14% - - 11.61% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.56% 100.00% 27.44% - - - 1.38 -37.83% - - 27.44% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 282.38% 100.00% -182.38% - - - 0.35 64.59% - - -182.38% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 69.76% 100.00% 30.24% - - - 1.43 -43.36% - - 30.24% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 576.67% 100.00% -476.67% - - - 0.17 82.66% - - -476.67% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 150.61% 100.00% -50.61% - - - 0.66 33.60% - - -50.61% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 879.41% 100.00% -779.41% - - - 0.11 88.63% - - -779.41% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 84.69% 100.00% 15.31% - - - 1.18 -18.08% - - 15.31% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 56.87% 100.00% 43.13% - - - 1.76 -75.83% - - 43.13% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PLANCHA DE THERMOPOR DE 2*50*100 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 48.31% 100.00% 51.69% - - - 2.07 -106.99% - - 51.69% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 48.31% 100.00% 51.69% - - - 2.07 -106.99% - - 51.69% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 86.12% 100.00% 13.88% - - - 1.16 -16.12% - - 13.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 72.37% 100.00% 27.63% - - - 1.38 -38.18% - - 27.63% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 493.47% 100.00% -393.47% - - - 0.20 79.74% - - -393.47% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 387.33% 100.00% -287.33% - - - 0.26 74.18% - - -287.33% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 387.33% 100.00% -287.33% - - - 0.26 74.18% - - -287.33% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1384.32 -138332.00% - - 99.93% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA FLEXIBLE 12' TRUPER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEPILLO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIA VIDRIO LIQUIDO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA PARA TRAPEADOR
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESCOBAS PLASTICAS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DETERGENTE ESPUMIL 1000 GRS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESINFECTANTE OLIMPO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SQUEEGEE LIMPIADOR DE VIDRIOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 291.99% 100.00% -191.99% - - - 0.34 65.75% - - -191.99% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 118.26% 100.00% -18.26% - - - 0.85 15.44% - - -18.26% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 102.79% 100.00% -2.79% - - - 0.97 2.71% - - -2.79% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 102.79% 100.00% -2.79% - - - 0.97 2.71% - - -2.79% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 102.79% 100.00% -2.79% - - - 0.97 2.71% - - -2.79% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE DE 3''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 99.86% 100.00% 0.14% - - - 1.00 -0.14% - - 0.14% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 95.92% 100.00% 4.08% - - - 1.04 -4.25% - - 4.08% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 1.38% 100.00% 98.62% - - - 72.28 -7127.88% - - 98.62% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 94.17% 100.00% 5.83% - - - 1.06 -6.19% - - 5.83% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 106.33% 100.00% -6.33% - - - 0.94 5.95% - - -6.33% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 106.33% 100.00% -6.33% - - - 0.94 5.95% - - -6.33% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 106.33% 100.00% -6.33% - - - 0.94 5.95% - - -6.33% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 87.71% 100.00% 12.29% - - - 1.14 -14.01% - - 12.29% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 82.74% 100.00% 17.26% - - - 1.21 -20.87% - - 17.26% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 40.15% 100.00% 59.85% - - - 2.49 -149.07% - - 59.85% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 404.67 -40367.00% - - 99.75% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 103.08% 100.00% -3.08% - - - 0.97 2.99% - - -3.08% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 84.56% 100.00% 15.44% - - - 1.18 -18.26% - - 15.44% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 100.00% 67.70% - - - 3.10 -209.63% - - 67.70% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 78.34% 100.00% 21.66% - - - 1.28 -27.64% - - 21.66% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 65.52% 100.00% 34.48% - - - 1.53 -52.62% - - 34.48% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 65.52% 100.00% 34.48% - - - 1.53 -52.62% - - 34.48% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 29.53% 100.00% 70.47% - - - 3.39 -238.68% - - 70.47% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA COLONIAL STYLE LATEX MATE BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BB SELLADOR MULTIFUNCIONAL BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 46.11% 100.00% 53.89% - - - 2.17 -116.88% - - 53.89% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 130.90% 100.00% -30.90% - - - 0.76 23.61% - - -30.90% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 126.79% 100.00% -26.79% - - - 0.79 21.13% - - -26.79% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 193.01% 100.00% -93.01% - - - 0.52 48.19% - - -93.01% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 38.89% 100.00% 61.11% - - - 2.57 -157.14% - - 61.11% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 110.09% 100.00% -10.09% - - - 0.91 9.17% - - -10.09% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 286.43% 100.00% -186.43% - - - 0.35 65.09% - - -186.43% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 136.03% 100.00% -36.03% - - - 0.74 26.49% - - -36.03% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 70.18% 100.00% 29.82% - - - 1.42 -42.50% - - 29.82% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CHORRO DE ESFERA 1/2 P/MANGUERA GENEBRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BAJADA DE AGUA DE 3 ALUMINIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 1.04% 100.00% 98.96% - - - 96.19 -9518.81% - - 98.96% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 1.04% 100.00% 98.96% - - - 96.19 -9518.81% - - 98.96% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 12373.64 -1237264.00% - - 99.99% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 14.35% 100.00% 85.65% - - - 6.97 -596.65% - - 85.65% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CANAL 2-1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 54.88% 100.00% 45.12% - - - 1.82 -82.21% - - 45.12% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 100.13% 100.00% -0.13% - - - 1.00 0.13% - - -0.13% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 103.14% 100.00% -3.14% - - - 0.97 3.04% - - -3.14% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 100.00% 100.00% -0.00% - - - 1.00 0.00% - - -0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1076.43 -107543.00% - - 99.91% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 3.91% 100.00% 96.09% - - - 25.59 -2459.44% - - 96.09% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 5.70% 100.00% 94.30% - - - 17.55 -1654.91% - - 94.30% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 955.55 -95455.00% - - 99.90% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 3.85% 100.00% 96.15% - - - 25.95 -2495.14% - - 96.15% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 100.00% 100.00% - - - 31851.65 -3185065.00% - - 100.00% - 0.00%
CASA # 45
- - - - - - 1.30% 1.25% 69.09% 89.85% 20.76% - - - 1.30 -30.04% - - 23.10% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 77.24% 77.70% 0.46% - - - 1.01 -0.59% - - 0.59% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 150.69% 100.00% -50.69% - - - 0.66 33.64% - - -50.69% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 144.03% 100.00% -44.03% - - - 0.69 30.57% - - -44.03% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 119.53% 100.00% -19.53% - - - 0.84 16.34% - - -19.53% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 188.38% 100.00% -88.38% - - - 0.53 46.92% - - -88.38% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 172.70% 100.00% -72.70% - - - 0.58 42.10% - - -72.70% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 172.70% 100.00% -72.70% - - - 0.58 42.10% - - -72.70% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 82.95% 100.00% 17.05% - - - 1.21 -20.56% - - 17.05% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 82.95% 100.00% 17.05% - - - 1.21 -20.56% - - 17.05% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 475.62 -47462.00% - - 99.79% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 59.31% 100.00% 40.69% - - - 1.69 -68.61% - - 40.69% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 446.44 -44544.00% - - 99.78% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 100.00% 67.70% - - - 3.10 -209.63% - - 67.70% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 113.64% 100.00% -13.64% - - - 0.88 12.00% - - -13.64% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 109.62% 100.00% -9.62% - - - 0.91 8.77% - - -9.62% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 89.81% 100.00% 10.19% - - - 1.11 -11.34% - - 10.19% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 87.81% 100.00% 12.19% - - - 1.14 -13.88% - - 12.19% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA BLANCO EXTRA FINO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #220 H-98 O A-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA P/AGUA #150 H-98 O C-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 100 P/AGUA BASE DE LONA 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 514.88% 0.00% -514.88% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPATULA METALICA DE 2" MANGO PLASTICO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALCOHOL EN GEL ANTIBACTERIAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 508.55% 0.00% -508.55% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 508.55% 0.00% -508.55% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 38.13% 0.00% -38.13% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 109.88% 0.00% -109.88% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 105.77% 0.00% -105.77% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 99.89% 0.00% -99.89% - - - 0.00 100.00% - - 0.00% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 80.72% 0.00% -80.72% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 148.15% 0.00% -148.15% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 0.00% -96.70% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 42.88% 0.00% -42.88% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 75.19% 0.00% -75.19% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
RODILLO CON FELPA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FELPA SIN RODILLO DE FIBRA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MINI FELPAS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 73.82% 0.00% -73.82% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 73.82% 0.00% -73.82% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 71.87% 0.00% -71.87% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 87.44% 100.00% 12.56% - - - 1.14 -14.37% - - 12.56% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 112.27% 100.00% -12.27% - - - 0.89 10.93% - - -12.27% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 183.75% 100.00% -83.75% - - - 0.54 45.58% - - -83.75% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 289315.56% 100.00% -289215.56% - - - 0.00 99.97% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 11676.25% 100.00% -11576.25% - - - 0.01 99.14% - - 0.00% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2102.10% 100.00% -2002.10% - - - 0.05 95.24% - - -2002.10% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
EPOXICO ICITY 400ML
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 1049.14% 100.00% -949.14% - - - 0.10 90.47% - - -949.14% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 1802.13% 100.00% -1702.13% - - - 0.06 94.45% - - -1702.13% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 323.60% 100.00% -223.60% - - - 0.31 69.10% - - -223.60% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 171.15% 100.00% -71.15% - - - 0.58 41.57% - - -71.15% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 137.87% 100.00% -37.87% - - - 0.73 27.47% - - -37.87% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 119.77% 100.00% -19.77% - - - 0.83 16.51% - - -19.77% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 32.24% 100.00% 67.76% - - - 3.10 -210.19% - - 67.76% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 292.11% 100.00% -192.11% - - - 0.34 65.77% - - -192.11% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 220.72% 100.00% -120.72% - - - 0.45 54.69% - - -120.72% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 337.18% 100.00% -237.18% - - - 0.30 70.34% - - -237.18% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 32.33% 100.00% 67.67% - - - 3.09 -209.33% - - 67.67% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 32.33% 100.00% 67.67% - - - 3.09 -209.33% - - 67.67% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 92.75% 100.00% 7.25% - - - 1.08 -7.82% - - 7.25% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 161.67% 100.00% -61.67% - - - 0.62 38.15% - - -61.67% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 220.42% 100.00% -120.42% - - - 0.45 54.63% - - -120.42% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 202.43% 100.00% -102.43% - - - 0.49 50.60% - - -102.43% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 123.44% 100.00% -23.44% - - - 0.81 18.99% - - -23.44% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 90.52% 100.00% 9.48% - - - 1.10 -10.47% - - 9.48% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 93.77% 100.00% 6.23% - - - 1.07 -6.64% - - 6.23% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.26% 100.00% -27.26% - - - 0.79 21.42% - - -27.26% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.07% 100.00% 62.93% - - - 2.70 -169.75% - - 62.93% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 22.02% 100.00% 77.98% - - - 4.54 -354.12% - - 77.98% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 22.02% 100.00% 77.98% - - - 4.54 -354.12% - - 77.98% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 110.79% 100.00% -10.79% - - - 0.90 9.74% - - -10.79% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 81.53% 100.00% 18.47% - - - 1.23 -22.66% - - 18.47% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 143.85% 100.00% -43.85% - - - 0.70 30.48% - - -43.85% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 13625.45% 100.00% -13525.45% - - - 0.01 99.27% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 4377.01% 100.00% -4277.01% - - - 0.02 97.72% - - -4277.01% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 62720.00% 100.00% -62620.00% - - - 0.00 99.84% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 653.09% 100.00% -553.09% - - - 0.15 84.69% - - -553.09% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 166.79% 100.00% -66.79% - - - 0.60 40.04% - - -66.79% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 107.03% 100.00% -7.03% - - - 0.93 6.57% - - -7.03% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 73.89% 100.00% 26.11% - - - 1.35 -35.33% - - 26.11% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 795.26% 100.00% -695.26% - - - 0.13 87.43% - - -695.26% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 266.82% 100.00% -166.82% - - - 0.37 62.52% - - -166.82% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 143.95% 100.00% -43.95% - - - 0.69 30.53% - - -43.95% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 883.60% 100.00% -783.60% - - - 0.11 88.68% - - -783.60% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('BLOCK LEVANTADOS EN MUROS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BLOCK DE 19X19X39 - 100KGS/CM2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 8.25% 100.00% 91.75% - - - 12.12 -1112.01% - - 91.75% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 8.25% 100.00% 91.75% - - - 12.12 -1112.01% - - 91.75% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y COMPLEMENTOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BOMBA PARA FUMIGAR (MATABI)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 65.54% 100.00% 34.46% - - - 1.53 -52.57% - - 34.46% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 115.88% 100.00% -15.88% - - - 0.86 13.71% - - -15.88% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6794.37% 100.00% -6694.37% - - - 0.01 98.53% - - -6694.37% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 2272.46% 100.00% -2172.46% - - - 0.04 95.60% - - -2172.46% - 0.00%
SILICONE SISTA 280ML BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 1794.43% 100.00% -1694.43% - - - 0.06 94.43% - - -1694.43% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 1794.43% 100.00% -1694.43% - - - 0.06 94.43% - - -1694.43% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 198.05% 100.00% -98.05% - - - 0.50 49.51% - - -98.05% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 131.91% 100.00% -31.91% - - - 0.76 24.19% - - -31.91% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 2279.58% 100.00% -2179.58% - - - 0.04 95.61% - - -2179.58% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 136.90% 100.00% -36.90% - - - 0.73 26.96% - - -36.90% - 0.00%
LIJA P/AGUA #220 H-98 O A-99 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIJA NO. 100 P/AGUA BASE DE LONA 3M
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
TUBO RECTANGULAR DE ALUMINIO DE 1 3/4" X 3" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO CIRCULAR CORTE DE MADERA 7 1/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 14.32% 100.00% 85.68% - - - 6.98 -598.31% - - 85.68% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 6.97% 100.00% 93.03% - - - 14.35 -1335.00% - - 93.03% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 26.76% 100.00% 73.24% - - - 3.74 -273.63% - - 73.24% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 436.89% 100.00% -336.89% - - - 0.23 77.11% - - -336.89% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPERMEABILIZANTE FASTYL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PASTA TABLAROCA 28KG USG CUBETA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA MALLA ADHESIVA DE 4" X 300'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 35.37% 100.00% 64.63% - - - 2.83 -182.76% - - 64.63% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 35.37% 100.00% 64.63% - - - 2.83 -182.76% - - 64.63% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 3.85% 86.12% 82.27% - - - 22.38 -2138.08% - - 95.53% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 5.53% 88.00% 82.47% - - - 15.91 -1491.40% - - 93.72% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 9.71% 88.00% 78.29% - - - 9.06 -806.29% - - 88.97% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO PVC GRIS DE 2" X 3 MTS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
VUELTA PVC GRIS DE 2"
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 5.40% 88.00% 82.60% - - - 16.28 -1528.33% - - 93.86% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 1.95% 84.00% 82.05% - - - 43.00 -4200.17% - - 97.67% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 30.56% 84.00% 53.44% - - - 2.75 -174.86% - - 63.62% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 1.10% 84.00% 82.90% - - - 76.70 -7570.04% - - 98.70% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
CASA # 47
- - - - - - 1.30% 1.25% 38.86% 50.85% 11.99% - - - 1.31 -30.84% - - 23.57% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 75.25% 74.46% -0.79% - - - 0.99 1.04% - - -1.06% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 106.07% 100.00% -6.07% - - - 0.94 5.72% - - -6.07% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 206.40% 100.00% -106.40% - - - 0.48 51.55% - - -106.40% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 285.07% 100.00% -185.07% - - - 0.35 64.92% - - -185.07% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 212.82% 100.00% -112.82% - - - 0.47 53.01% - - -112.82% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 144.59% 100.00% -44.59% - - - 0.69 30.84% - - -44.59% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 58.71% 100.00% 41.29% - - - 1.70 -70.32% - - 41.29% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 87.74% 100.00% 12.26% - - - 1.14 -13.97% - - 12.26% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.04% 100.00% -27.04% - - - 0.79 21.29% - - -27.04% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9672.31 -967131.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9672.31 -967131.00% - - 99.99% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 102.32% 100.00% -2.32% - - - 0.98 2.27% - - -2.32% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 168.38% 100.00% -68.38% - - - 0.59 40.61% - - -68.38% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6347.05% 100.00% -6247.05% - - - 0.02 98.42% - - -6247.05% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 277.85% 100.00% -177.85% - - - 0.36 64.01% - - -177.85% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 186.94% 100.00% -86.94% - - - 0.53 46.51% - - -86.94% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 164.76% 100.00% -64.76% - - - 0.61 39.30% - - -64.76% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 87.41% 100.00% 12.59% - - - 1.14 -14.41% - - 12.59% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 35.44% 100.00% 64.56% - - - 2.82 -182.20% - - 64.56% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 433.30% 100.00% -333.30% - - - 0.23 76.92% - - -333.30% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 2721.01% 100.00% -2621.01% - - - 0.04 96.32% - - -2621.01% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 28.38% 100.00% 71.62% - - - 3.52 -252.30% - - 71.62% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 28.38% 100.00% 71.62% - - - 3.52 -252.30% - - 71.62% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 69.33% 100.00% 30.67% - - - 1.44 -44.23% - - 30.67% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 130.30% 100.00% -30.30% - - - 0.77 23.25% - - -30.30% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 4377.01% 100.00% -4277.01% - - - 0.02 97.72% - - -4277.01% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 62720.00% 100.00% -62620.00% - - - 0.00 99.84% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 473.84% 100.00% -373.84% - - - 0.21 78.90% - - -373.84% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
YOMBOLON 3-32
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 179.73% 100.00% -79.73% - - - 0.56 44.36% - - -79.73% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 102.74% 100.00% -2.74% - - - 0.97 2.67% - - -2.74% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 401.48% 100.00% -301.48% - - - 0.25 75.09% - - -301.48% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 38.56% 100.00% 61.44% - - - 2.59 -159.32% - - 61.44% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 173.72% 100.00% -73.72% - - - 0.58 42.44% - - -73.72% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.36 -14736.00% - - 99.33% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 132.16% 100.00% -32.16% - - - 0.76 24.33% - - -32.16% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 315.52% 100.00% -215.52% - - - 0.32 68.31% - - -215.52% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 963.70% 100.00% -863.70% - - - 0.10 89.62% - - -863.70% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 110.02% 100.00% -10.02% - - - 0.91 9.11% - - -10.02% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 192.21% 100.00% -92.21% - - - 0.52 47.97% - - -92.21% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 29062.75 -2906175.00% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 29062.75 -2906175.00% - - 100.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 39.16% 0.00% -39.16% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 44.52% 0.00% -44.52% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 48.04% 0.00% -48.04% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.35% 0.00% -71.35% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 138.01% 0.00% -138.01% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 111.24% 0.00% -111.24% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 1348.78% 0.00% -1348.78% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 24.88% 0.00% -24.88% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 67.74% 0.00% -67.74% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 12.38% 0.00% -12.38% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 12.38% 0.00% -12.38% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 36.12% 0.00% -36.12% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 36.12% 0.00% -36.12% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 1.52% 86.12% 84.60% - - - 56.53 -5552.84% - - 98.23% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 2.71% 88.00% 85.29% - - - 32.52 -3152.24% - - 96.93% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 2.79% 88.00% 85.21% - - - 31.58 -3057.52% - - 96.83% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.19% 84.00% 83.81% - - - 438.47 -43747.33% - - 99.77% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 84.00% 77.42% - - - 12.77 -1177.11% - - 92.17% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 7.67% 0.00% -7.67% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 0.14% 0.00% -0.14% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 31.00% 0.00% -31.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 31.00% 0.00% -31.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 31.00% 0.00% -31.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.56% 0.00% -1.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 4.51% 0.00% -4.51% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 0.40% 0.00% -0.40% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 50.94% 0.00% -50.94% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 50.94% 0.00% -50.94% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 50.94% 0.00% -50.94% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 50.94% 0.00% -50.94% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 50
- - - - - - 1.30% 1.25% 34.48% 50.85% 16.37% - - - 1.47 -47.47% - - 32.19% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 70.79% 74.46% 3.67% - - - 1.05 -5.18% - - 4.92% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 122.19% 100.00% -22.19% - - - 0.82 18.16% - - -22.19% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 203.38% 100.00% -103.38% - - - 0.49 50.83% - - -103.38% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 433.25% 100.00% -333.25% - - - 0.23 76.92% - - -333.25% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 27112.05% 100.00% -27012.05% - - - 0.00 99.63% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 285.07% 100.00% -185.07% - - - 0.35 64.92% - - -185.07% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 271.86% 100.00% -171.86% - - - 0.37 63.22% - - -171.86% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 91.24% 100.00% 8.76% - - - 1.10 -9.60% - - 8.76% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 58.71% 100.00% 41.29% - - - 1.70 -70.32% - - 41.29% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 100.28% 100.00% -0.28% - - - 1.00 0.28% - - -0.28% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 81.47% 100.00% 18.53% - - - 1.23 -22.74% - - 18.53% - 0.00%
CLAVO DE LAMINA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 40.26% 100.00% 59.74% - - - 2.48 -148.38% - - 59.74% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 40.26% 100.00% 59.74% - - - 2.48 -148.38% - - 59.74% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 88.09% 100.00% 11.91% - - - 1.14 -13.53% - - 11.91% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 157.08% 100.00% -57.08% - - - 0.64 36.34% - - -57.08% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 39946.67% 100.00% -39846.67% - - - 0.00 99.75% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 187.45% 100.00% -87.45% - - - 0.53 46.65% - - -87.45% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 155.51% 100.00% -55.51% - - - 0.64 35.70% - - -55.51% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 138.76% 100.00% -38.76% - - - 0.72 27.93% - - -38.76% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 196.67% 100.00% -96.67% - - - 0.51 49.15% - - -96.67% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 689.14 -68814.00% - - 99.85% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 143.81% 100.00% -43.81% - - - 0.70 30.46% - - -43.81% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.94 -10094.00% - - 99.02% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 10.04% 100.00% 89.96% - - - 9.96 -896.02% - - 89.96% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 10.04% 100.00% 89.96% - - - 9.96 -896.02% - - 89.96% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 57.28% 100.00% 42.72% - - - 1.75 -74.59% - - 42.72% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 107.64% 100.00% -7.64% - - - 0.93 7.10% - - -7.64% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 345718.18% 100.00% -345618.18% - - - 0.00 99.97% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 1847.29% 100.00% -1747.29% - - - 0.05 94.59% - - -1747.29% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 455.64% 100.00% -355.64% - - - 0.22 78.05% - - -355.64% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 110.02% 100.00% -10.02% - - - 0.91 9.11% - - -10.02% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 98.91% 100.00% 1.09% - - - 1.01 -1.10% - - 1.09% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 44.66% 100.00% 55.34% - - - 2.24 -123.92% - - 55.34% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 38.56% 100.00% 61.44% - - - 2.59 -159.32% - - 61.44% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 316.39% 100.00% -216.39% - - - 0.32 68.39% - - -216.39% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 132.16% 100.00% -32.16% - - - 0.76 24.33% - - -32.16% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 184.18% 100.00% -84.18% - - - 0.54 45.70% - - -84.18% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 486.62% 100.00% -386.62% - - - 0.21 79.45% - - -386.62% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 29062.75 -2906175.00% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 29062.75 -2906175.00% - - 100.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 46.35% 0.00% -46.35% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 37.19% 0.00% -37.19% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 48.04% 0.00% -48.04% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.35% 0.00% -71.35% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 532.82% 0.00% -532.82% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 69.58% 0.00% -69.58% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 73.42% 0.00% -73.42% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 21.27% 0.00% -21.27% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 145.35% 0.00% -145.35% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 61.88% 0.00% -61.88% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 61.88% 0.00% -61.88% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 52.14% 0.00% -52.14% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 52.14% 0.00% -52.14% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 1.52% 86.12% 84.60% - - - 56.53 -5552.84% - - 98.23% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 2.71% 88.00% 85.29% - - - 32.52 -3152.24% - - 96.93% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 2.79% 88.00% 85.21% - - - 31.58 -3057.52% - - 96.83% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.19% 84.00% 83.81% - - - 438.47 -43747.33% - - 99.77% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 84.00% 77.42% - - - 12.77 -1177.11% - - 92.17% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 1.13% 0.00% -1.13% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.56% 0.00% -1.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 4.51% 0.00% -4.51% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 0.40% 0.00% -0.40% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 43
- - - - - - 1.30% 1.25% 57.22% 88.06% 30.84% - - - 1.54 -53.89% - - 35.02% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 61.47% 72.52% 11.05% - - - 1.18 -17.98% - - 15.24% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 131.60% 100.00% -31.60% - - - 0.76 24.01% - - -31.60% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 176.16% 100.00% -76.16% - - - 0.57 43.23% - - -76.16% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 173.46% 100.00% -73.46% - - - 0.58 42.35% - - -73.46% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 173.46% 100.00% -73.46% - - - 0.58 42.35% - - -73.46% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 107.92% 100.00% -7.92% - - - 0.93 7.34% - - -7.92% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 107.35% 100.00% -7.35% - - - 0.93 6.85% - - -7.35% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 475.62 -47462.00% - - 99.79% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 86.95% 100.00% 13.05% - - - 1.15 -15.01% - - 13.05% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 446.44 -44544.00% - - 99.78% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.28% 100.00% 67.72% - - - 3.10 -209.74% - - 67.72% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 95.05% 100.00% 4.95% - - - 1.05 -5.21% - - 4.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 94.54% 100.00% 5.46% - - - 1.06 -5.78% - - 5.46% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 28911.52 -2891052.00% - - 100.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 28911.52 -2891052.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 94.17% 100.00% 5.83% - - - 1.06 -6.19% - - 5.83% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 94.17% 100.00% 5.83% - - - 1.06 -6.19% - - 5.83% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 94.17% 100.00% 5.83% - - - 1.06 -6.19% - - 5.83% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 94.17% 100.00% 5.83% - - - 1.06 -6.19% - - 5.83% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 41.42% 100.00% 58.58% - - - 2.41 -141.41% - - 58.58% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 17.12% 100.00% 82.88% - - - 5.84 -484.00% - - 82.88% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 17.12% 100.00% 82.88% - - - 5.84 -484.00% - - 82.88% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 17.12% 100.00% 82.88% - - - 5.84 -484.00% - - 82.88% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 17.12% 100.00% 82.88% - - - 5.84 -484.00% - - 82.88% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 117.53% 0.00% -117.53% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 117.53% 0.00% -117.53% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 117.53% 0.00% -117.53% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 145.49% 0.00% -145.49% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 145.49% 0.00% -145.49% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 145.49% 0.00% -145.49% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.56% 0.00% -1.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 4.51% 0.00% -4.51% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 0.40% 0.00% -0.40% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 0.00% -46.62% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 73.84% 100.00% 26.16% - - - 1.35 -35.43% - - 26.16% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 94.43% 100.00% 5.57% - - - 1.06 -5.90% - - 5.57% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 156.93% 100.00% -56.93% - - - 0.64 36.28% - - -56.93% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 153933.33% 100.00% -153833.33% - - - 0.00 99.94% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
MEZCLON PREPARADO LA ROCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 5005.01% 100.00% -4905.01% - - - 0.02 98.00% - - -4905.01% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 178.75% 100.00% -78.75% - - - 0.56 44.06% - - -78.75% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 171.15% 100.00% -71.15% - - - 0.58 41.57% - - -71.15% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 148.46% 100.00% -48.46% - - - 0.67 32.64% - - -48.46% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 130.68% 100.00% -30.68% - - - 0.77 23.48% - - -30.68% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 64.43% 100.00% 35.57% - - - 1.55 -55.20% - - 35.57% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 331.58% 100.00% -231.58% - - - 0.30 69.84% - - -231.58% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 220.72% 100.00% -120.72% - - - 0.45 54.69% - - -120.72% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 337.18% 100.00% -237.18% - - - 0.30 70.34% - - -237.18% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 24.38% 100.00% 75.62% - - - 4.10 -310.24% - - 75.62% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 24.38% 100.00% 75.62% - - - 4.10 -310.24% - - 75.62% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 82.27% 100.00% 17.73% - - - 1.22 -21.55% - - 17.73% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 138.62% 100.00% -38.62% - - - 0.72 27.86% - - -38.62% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 68127.27% 100.00% -68027.27% - - - 0.00 99.85% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 318.91% 100.00% -218.91% - - - 0.31 68.64% - - -218.91% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 213.63% 100.00% -113.63% - - - 0.47 53.19% - - -113.63% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 107.03% 100.00% -7.03% - - - 0.93 6.57% - - -7.03% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 77.37% 100.00% 22.63% - - - 1.29 -29.24% - - 22.63% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1396.43% 100.00% -1296.43% - - - 0.07 92.84% - - -1296.43% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 266.99% 100.00% -166.99% - - - 0.37 62.55% - - -166.99% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 159.25% 100.00% -59.25% - - - 0.63 37.21% - - -59.25% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 926.42% 100.00% -826.42% - - - 0.11 89.21% - - -826.42% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 12.18 -1118.00% - - 91.79% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 18.99% 100.00% 81.01% - - - 5.27 -426.65% - - 81.01% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 18.99% 100.00% 81.01% - - - 5.27 -426.65% - - 81.01% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 54.03% 100.00% 45.97% - - - 1.85 -85.10% - - 45.97% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 77.18% 100.00% 22.82% - - - 1.30 -29.57% - - 22.82% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6422.51% 100.00% -6322.51% - - - 0.02 98.44% - - -6322.51% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 268.11% 100.00% -168.11% - - - 0.37 62.70% - - -168.11% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 184.86% 100.00% -84.86% - - - 0.54 45.90% - - -84.86% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 3846.06% 100.00% -3746.06% - - - 0.03 97.40% - - -3746.06% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 92.82% 100.00% 7.18% - - - 1.08 -7.74% - - 7.18% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 92.82% 100.00% 7.18% - - - 1.08 -7.74% - - 7.18% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 35.80% 100.00% 64.20% - - - 2.79 -179.32% - - 64.20% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 22.74% 100.00% 77.26% - - - 4.40 -339.74% - - 77.26% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 8.92% 100.00% 91.08% - - - 11.21 -1020.71% - - 91.08% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 10923.05% 100.00% -10823.05% - - - 0.01 99.08% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 20.40% 100.00% 79.60% - - - 4.90 -390.24% - - 79.60% - 0.00%
DISCOS P/CORTE D/METAL DE 9"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESPIGAS DE HULE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 40.27% 100.00% 59.73% - - - 2.48 -148.32% - - 59.73% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 40.27% 100.00% 59.73% - - - 2.48 -148.32% - - 59.73% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 42.61% 100.00% 57.39% - - - 2.35 -134.67% - - 57.39% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 78.76% 100.00% 21.24% - - - 1.27 -26.97% - - 21.24% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 138.39% 100.00% -38.39% - - - 0.72 27.74% - - -38.39% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.00% 100.00% 29.00% - - - 1.41 -40.84% - - 29.00% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 93.83% 100.00% 6.17% - - - 1.07 -6.58% - - 6.17% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.02% 100.00% -27.02% - - - 0.79 21.27% - - -27.02% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 38.02% 100.00% 61.98% - - - 2.63 -163.01% - - 61.98% - 0.00%
SERVICIO DE BOMBEO COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIO DE COLOCACION COBRO MINIMO < 4M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.07% 100.00% 62.93% - - - 2.70 -169.75% - - 62.93% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 4.87% 100.00% 95.13% - - - 20.52 -1952.35% - - 95.13% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 4.87% 100.00% 95.13% - - - 20.52 -1952.35% - - 95.13% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 4.20% 86.12% 81.92% - - - 20.49 -1948.70% - - 95.12% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 5.38% 88.00% 82.62% - - - 16.34 -1534.21% - - 93.88% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 5.40% 88.00% 82.60% - - - 16.28 -1528.28% - - 93.86% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 4.73% 88.00% 83.27% - - - 18.60 -1759.92% - - 94.62% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA DE AISLAR SCOTCH
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 2.87% 84.00% 81.13% - - - 29.24 -2823.78% - - 96.58% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 78.95% 84.00% 5.05% - - - 1.06 -6.39% - - 6.01% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.59% 84.00% 83.41% - - - 142.24 -14124.02% - - 99.30% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
CASA # 51
- - - - - - 1.30% 1.25% 32.87% 50.85% 17.98% - - - 1.55 -54.71% - - 35.36% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 67.42% 74.46% 7.04% - - - 1.10 -10.45% - - 9.46% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 92.48% 100.00% 7.52% - - - 1.08 -8.13% - - 7.52% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 179.80% 100.00% -79.80% - - - 0.56 44.38% - - -79.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 270.17% 100.00% -170.17% - - - 0.37 62.99% - - -170.17% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 129.50% 100.00% -29.50% - - - 0.77 22.78% - - -29.50% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 90.62% 100.00% 9.38% - - - 1.10 -10.35% - - 9.38% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 58.71% 100.00% 41.29% - - - 1.70 -70.32% - - 41.29% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 100.28% 100.00% -0.28% - - - 1.00 0.28% - - -0.28% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 82.86% 100.00% 17.14% - - - 1.21 -20.69% - - 17.14% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
HILO NYLON P/ALBAÑIL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9672.31 -967131.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9672.31 -967131.00% - - 99.99% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 63.80% 100.00% 36.20% - - - 1.57 -56.74% - - 36.20% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 119.90% 100.00% -19.90% - - - 0.83 16.60% - - -19.90% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 1728.93% 100.00% -1628.93% - - - 0.06 94.22% - - -1628.93% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 171.15% 100.00% -71.15% - - - 0.58 41.57% - - -71.15% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 157.31% 100.00% -57.31% - - - 0.64 36.43% - - -57.31% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 55.94% 100.00% 44.06% - - - 1.79 -78.76% - - 44.06% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5325.36 -532436.00% - - 99.98% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 689.14 -68814.00% - - 99.85% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 165.16% 100.00% -65.16% - - - 0.61 39.45% - - -65.16% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 219.49% 100.00% -119.49% - - - 0.46 54.44% - - -119.49% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 140.82% 100.00% -40.82% - - - 0.71 28.99% - - -40.82% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 23778.62 -2377762.00% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 23778.62 -2377762.00% - - 100.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 53.61% 100.00% 46.39% - - - 1.87 -86.55% - - 46.39% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 100.74% 100.00% -0.74% - - - 0.99 0.74% - - -0.74% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 229003.64% 100.00% -228903.64% - - - 0.00 99.96% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 821.02% 100.00% -721.02% - - - 0.12 87.82% - - -721.02% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 131.47% 100.00% -31.47% - - - 0.76 23.94% - - -31.47% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 97.91% 100.00% 2.09% - - - 1.02 -2.13% - - 2.09% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 44.66% 100.00% 55.34% - - - 2.24 -123.92% - - 55.34% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 41.20% 100.00% 58.80% - - - 2.43 -142.73% - - 58.80% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 316.39% 100.00% -216.39% - - - 0.32 68.39% - - -216.39% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 132.16% 100.00% -32.16% - - - 0.76 24.33% - - -32.16% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 180.69% 100.00% -80.69% - - - 0.55 44.66% - - -80.69% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 446.87% 100.00% -346.87% - - - 0.22 77.62% - - -346.87% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 29062.75 -2906175.00% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 29062.75 -2906175.00% - - 100.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 78.56% 0.00% -78.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 38.69% 0.00% -38.69% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 50.72% 0.00% -50.72% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 89.19% 0.00% -89.19% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 5051.66% 0.00% -5051.66% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 2272.46% 0.00% -2272.46% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 160.44% 0.00% -160.44% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 147.04% 0.00% -147.04% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 103.15% 0.00% -103.15% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 103.15% 0.00% -103.15% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 1.52% 86.12% 84.60% - - - 56.53 -5552.84% - - 98.23% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 2.71% 88.00% 85.29% - - - 32.52 -3152.24% - - 96.93% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 2.79% 88.00% 85.21% - - - 31.58 -3057.52% - - 96.83% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.19% 84.00% 83.81% - - - 438.47 -43747.33% - - 99.77% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 84.00% 77.42% - - - 12.77 -1177.11% - - 92.17% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 1.13% 0.00% -1.13% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.56% 0.00% -1.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 4.51% 0.00% -4.51% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 0.40% 0.00% -0.40% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 44
- - - - - - 1.30% 1.25% 55.72% 89.85% 34.13% - - - 1.61 -61.26% - - 37.99% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 81.72% 77.70% -4.02% - - - 0.95 4.92% - - -5.18% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 174.21% 100.00% -74.21% - - - 0.57 42.60% - - -74.21% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 173.82% 100.00% -73.82% - - - 0.58 42.47% - - -73.82% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 79.28% 100.00% 20.72% - - - 1.26 -26.13% - - 20.72% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 74.72% 100.00% 25.28% - - - 1.34 -33.84% - - 25.28% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILICONE SISTA 280ML BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 129.82% 100.00% -29.82% - - - 0.77 22.97% - - -29.82% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 173.46% 100.00% -73.46% - - - 0.58 42.35% - - -73.46% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 173.46% 100.00% -73.46% - - - 0.58 42.35% - - -73.46% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 173.46% 100.00% -73.46% - - - 0.58 42.35% - - -73.46% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 106.63% 100.00% -6.63% - - - 0.94 6.22% - - -6.63% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 106.63% 100.00% -6.63% - - - 0.94 6.22% - - -6.63% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 475.62 -47462.00% - - 99.79% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2165.00 -216400.00% - - 99.95% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 59.31% 100.00% 40.69% - - - 1.69 -68.61% - - 40.69% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 446.44 -44544.00% - - 99.78% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 7561.51 -756051.00% - - 99.99% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 32.30% 100.00% 67.70% - - - 3.10 -209.63% - - 67.70% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA ACERO MA GR 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANGOLA GRIS MA 20X66 A
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 96.66% 100.00% 3.34% - - - 1.03 -3.45% - - 3.34% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 46.62% 100.00% 53.38% - - - 2.15 -114.50% - - 53.38% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 2.20% 100.00% 97.80% - - - 45.46 -4445.82% - - 97.80% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3385.73 -338473.00% - - 99.97% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 129.34% 0.00% -129.34% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 129.34% 0.00% -129.34% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 129.34% 0.00% -129.34% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 364.89% 0.00% -364.89% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 364.89% 0.00% -364.89% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 364.89% 0.00% -364.89% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 38.13% 0.00% -38.13% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 109.88% 0.00% -109.88% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 105.77% 0.00% -105.77% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 99.89% 0.00% -99.89% - - - 0.00 100.00% - - 0.00% - 0.00%
GRIFO TIPO MEZCLADORA P/LAVATRASTOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 80.72% 0.00% -80.72% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 148.15% 0.00% -148.15% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE TIPO PUSH
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 96.70% 0.00% -96.70% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 42.88% 0.00% -42.88% - - - 0.00 100.00% - - 0.00% - 0.00%
DESAGUE LAVAMANOS TIPO REJILLA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAÑO BAJO HOME
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REJILLA DUCHA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 0.78% 0.00% -0.78% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 2"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCHA DE 4"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2116.34 -211534.00% - - 99.95% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 25107.78 -2510678.00% - - 100.00% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 56.49% 100.00% 43.51% - - - 1.77 -77.03% - - 43.51% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 95.21% 100.00% 4.79% - - - 1.05 -5.03% - - 4.79% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 172.96% 100.00% -72.96% - - - 0.58 42.18% - - -72.96% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 64046.07% 100.00% -63946.07% - - - 0.00 99.84% - - 0.00% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
PIEDRIN DE 3/8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 812.70% 100.00% -712.70% - - - 0.12 87.70% - - -712.70% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 50857.43% 100.00% -50757.43% - - - 0.00 99.80% - - 0.00% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 225.48% 100.00% -125.48% - - - 0.44 55.65% - - -125.48% - 0.00%
SERVICIO DE COLOCACION DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 207.49% 100.00% -107.49% - - - 0.48 51.81% - - -107.49% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 122.03% 100.00% -22.03% - - - 0.82 18.05% - - -22.03% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.82% 100.00% 27.18% - - - 1.37 -37.33% - - 27.18% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 93.77% 100.00% 6.23% - - - 1.07 -6.64% - - 6.23% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.26% 100.00% -27.26% - - - 0.79 21.42% - - -27.26% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 37.07% 100.00% 62.93% - - - 2.70 -169.75% - - 62.93% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 14.41% 100.00% 85.59% - - - 6.94 -593.96% - - 85.59% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 14.41% 100.00% 85.59% - - - 6.94 -593.96% - - 85.59% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 110.79% 100.00% -10.79% - - - 0.90 9.74% - - -10.79% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 70.84% 100.00% 29.16% - - - 1.41 -41.17% - - 29.16% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 122.68% 100.00% -22.68% - - - 0.82 18.49% - - -22.68% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 821.02% 100.00% -721.02% - - - 0.12 87.82% - - -721.02% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 389.89% 100.00% -289.89% - - - 0.26 74.35% - - -289.89% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 166.24% 100.00% -66.24% - - - 0.60 39.85% - - -66.24% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 107.03% 100.00% -7.03% - - - 0.93 6.57% - - -7.03% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 72.80% 100.00% 27.20% - - - 1.37 -37.36% - - 27.20% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 795.26% 100.00% -695.26% - - - 0.13 87.43% - - -695.26% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 266.82% 100.00% -166.82% - - - 0.37 62.52% - - -166.82% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 144.05% 100.00% -44.05% - - - 0.69 30.58% - - -44.05% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 883.60% 100.00% -783.60% - - - 0.11 88.68% - - -783.60% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 12.40% 100.00% 87.60% - - - 8.07 -706.77% - - 87.60% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 12.40% 100.00% 87.60% - - - 8.07 -706.77% - - 87.60% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 46.74% 100.00% 53.26% - - - 2.14 -113.95% - - 53.26% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 74.27% 100.00% 25.73% - - - 1.35 -34.64% - - 25.73% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 5544.59% 100.00% -5444.59% - - - 0.02 98.20% - - -5444.59% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SILICONE SISTA 280ML BLANCO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 439.33% 100.00% -339.33% - - - 0.23 77.24% - - -339.33% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 439.33% 100.00% -339.33% - - - 0.23 77.24% - - -339.33% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 191.29% 100.00% -91.29% - - - 0.52 47.72% - - -91.29% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 119.81% 100.00% -19.81% - - - 0.83 16.54% - - -19.81% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 3217.96% 100.00% -3117.96% - - - 0.03 96.89% - - -3117.96% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 61.74% 100.00% 38.26% - - - 1.62 -61.98% - - 38.26% - 0.00%
DISCOS P/CORTE D/CONCRETO DIAMANTADO DE 9"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCOS P/CORTE D/METAL DE 4 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 5/8 X 8"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 35.80% 100.00% 64.20% - - - 2.79 -179.32% - - 64.20% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 15.09% 100.00% 84.91% - - - 6.63 -562.69% - - 84.91% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 39.24% 100.00% 60.76% - - - 2.55 -154.82% - - 60.76% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 425.36% 100.00% -325.36% - - - 0.24 76.49% - - -325.36% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 343.72% 100.00% -243.72% - - - 0.29 70.91% - - -243.72% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('PINTURAS, SOLVENTES E IMPERMEABILIZANTE',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
THINNER
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 29.41% 100.00% 70.59% - - - 3.40 -240.04% - - 70.59% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 29.41% 100.00% 70.59% - - - 3.40 -240.04% - - 70.59% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUMINISTRO PARA HERRAMIENTA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TENSOR GALVANIZADO E 1/2 PLG 680 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 31.69% 100.00% 68.31% - - - 3.16 -215.60% - - 68.31% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 48.85% 100.00% 51.15% - - - 2.05 -104.70% - - 51.15% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 178.75% 100.00% -78.75% - - - 0.56 44.06% - - -78.75% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 140.22% 100.00% -40.22% - - - 0.71 28.68% - - -40.22% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 119.77% 100.00% -19.77% - - - 0.83 16.51% - - -19.77% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 64.46% 100.00% 35.54% - - - 1.55 -55.15% - - 35.54% - 0.00%
ACERO DE 1/4 X 6 MT COMERCIAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 292.11% 100.00% -192.11% - - - 0.34 65.77% - - -192.11% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 220.72% 100.00% -120.72% - - - 0.45 54.69% - - -120.72% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 337.18% 100.00% -237.18% - - - 0.30 70.34% - - -237.18% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 0.00% 100.00% 100.00% - - - 16308.96 -1630796.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 12.69% 100.00% 87.31% - - - 7.88 -687.73% - - 87.31% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 12.69% 100.00% 87.31% - - - 7.88 -687.73% - - 87.31% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 3.08% 86.12% 83.04% - - - 27.96 -2696.27% - - 96.42% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 5.25% 88.00% 82.75% - - - 16.77 -1577.13% - - 94.04% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 5.40% 88.00% 82.60% - - - 16.28 -1528.28% - - 93.86% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.64% 84.00% 83.36% - - - 131.57 -13057.34% - - 99.24% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 84.00% 77.42% - - - 12.77 -1177.11% - - 92.17% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.46% 84.00% 83.54% - - - 182.51 -18150.60% - - 99.45% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
CASA # 53
- - - - - - 1.30% 1.25% 36.55% 63.05% 26.50% - - - 1.73 -72.51% - - 42.03% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 67.22% 100.00% 32.78% - - - 1.49 -48.76% - - 32.78% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 108.18% 100.00% -8.18% - - - 0.92 7.56% - - -8.18% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 186.70% 100.00% -86.70% - - - 0.54 46.44% - - -86.70% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 285.07% 100.00% -185.07% - - - 0.35 64.92% - - -185.07% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 101.20% 100.00% -1.20% - - - 0.99 1.19% - - -1.20% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 58.71% 100.00% 41.29% - - - 1.70 -70.32% - - 41.29% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 87.74% 100.00% 12.26% - - - 1.14 -13.97% - - 12.26% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.04% 100.00% -27.04% - - - 0.79 21.29% - - -27.04% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 71.18% 100.00% 28.82% - - - 1.40 -40.50% - - 28.82% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 27.87% 100.00% 72.13% - - - 3.59 -258.87% - - 72.13% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 27.87% 100.00% 72.13% - - - 3.59 -258.87% - - 72.13% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 75.10% 100.00% 24.90% - - - 1.33 -33.16% - - 24.90% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 125.68% 100.00% -25.68% - - - 0.80 20.43% - - -25.68% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 488240.00% 100.00% -488140.00% - - - 0.00 99.98% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 187.32% 100.00% -87.32% - - - 0.53 46.61% - - -87.32% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 33.13% 100.00% 66.87% - - - 3.02 -201.81% - - 66.87% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 27.75% 100.00% 72.25% - - - 3.60 -260.30% - - 72.25% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5325.36 -532436.00% - - 99.98% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 689.14 -68814.00% - - 99.85% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 143.81% 100.00% -43.81% - - - 0.70 30.46% - - -43.81% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.94 -10094.00% - - 99.02% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 18.34% 100.00% 81.66% - - - 5.45 -445.12% - - 81.66% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 18.34% 100.00% 81.66% - - - 5.45 -445.12% - - 81.66% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 62.60% 100.00% 37.40% - - - 1.60 -59.76% - - 37.40% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 93.74% 100.00% 6.26% - - - 1.07 -6.68% - - 6.26% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 93.74% 100.00% 6.26% - - - 1.07 -6.68% - - 6.26% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 11.77% 100.00% 88.23% - - - 8.50 -749.59% - - 88.23% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 1713.55% 100.00% -1613.55% - - - 0.06 94.16% - - -1613.55% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 154.69% 100.00% -54.69% - - - 0.65 35.36% - - -54.69% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 154.69% 100.00% -54.69% - - - 0.65 35.36% - - -54.69% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 39.27% 100.00% 60.73% - - - 2.55 -154.63% - - 60.73% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 248.91 -24791.00% - - 99.60% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 14.41 -1341.00% - - 93.06% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 5.27% 100.00% 94.73% - - - 18.97 -1797.09% - - 94.73% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 5.56% 100.00% 94.44% - - - 17.98 -1697.97% - - 94.44% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 71.88 -7088.00% - - 98.61% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 869.44 -86844.00% - - 99.88% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 50.28% 100.00% 49.72% - - - 1.99 -98.89% - - 49.72% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 87.57% 100.00% 12.43% - - - 1.14 -14.20% - - 12.43% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 280336.36% 100.00% -280236.36% - - - 0.00 99.96% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 126.26% 100.00% -26.26% - - - 0.79 20.80% - - -26.26% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 108.36% 100.00% -8.36% - - - 0.92 7.71% - - -8.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 57.18% 100.00% 42.82% - - - 1.75 -74.88% - - 42.82% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6508.78 -650778.00% - - 99.98% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 25.38% 100.00% 74.62% - - - 3.94 -293.96% - - 74.62% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 176.25% 100.00% -76.25% - - - 0.57 43.26% - - -76.25% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.36 -14736.00% - - 99.33% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 132.16% 100.00% -32.16% - - - 0.76 24.33% - - -32.16% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 169.07% 100.00% -69.07% - - - 0.59 40.85% - - -69.07% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 446.87% 100.00% -346.87% - - - 0.22 77.62% - - -346.87% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 12.18 -1118.00% - - 91.79% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 8.21% 100.00% 91.79% - - - 12.17 -1117.35% - - 91.79% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 8.21% 100.00% 91.79% - - - 12.17 -1117.35% - - 91.79% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 2.86% 86.12% 83.26% - - - 30.11 -2910.70% - - 96.68% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 5.03% 88.00% 82.97% - - - 17.50 -1650.16% - - 94.29% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 5.18% 88.00% 82.82% - - - 16.99 -1599.18% - - 94.11% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.42% 84.00% 83.58% - - - 200.67 -19967.03% - - 99.50% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 14.37% 84.00% 69.63% - - - 5.84 -484.48% - - 82.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 11.39% 0.00% -11.39% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 5.93% 0.00% -5.93% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO ACERADO DE 4"
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 41.42% 0.00% -41.42% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('TABLAYESO',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
FULMINANTE CAL.27 AMARILLO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROCK EXTERIOR 8' X 4' X 1/2" USG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DN27 1" C/ARANDELA SIN REMACHE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POSTE DE 2 1/2" X 12' (CAL 26) LMS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 53.49% 0.00% -53.49% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 81.91% 0.00% -81.91% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 81.91% 0.00% -81.91% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGATEC PLUS ADHESIVO PARA CERAMICA GRIS DE 20KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGATEC SISATEC SISA NEGRO DE 10 KG
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANDORRA ACERO GR 43X43
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO ANGOLA GRIS 20X66
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SAMBORO PISO CERAMICO ANDORRA PLOMO MA 43X43 A
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.56% 0.00% -1.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 4.51% 0.00% -4.51% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 0.40% 0.00% -0.40% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 2.12% 0.00% -2.12% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 49
- - - - - - 1.30% 1.25% 33.31% 63.05% 29.74% - - - 1.89 -89.28% - - 47.17% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 68.18% 100.00% 31.82% - - - 1.47 -46.66% - - 31.82% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 101.05% 100.00% -1.05% - - - 0.99 1.04% - - -1.05% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 175.93% 100.00% -75.93% - - - 0.57 43.16% - - -75.93% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 272.11% 100.00% -172.11% - - - 0.37 63.25% - - -172.11% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 89.65% 100.00% 10.35% - - - 1.12 -11.54% - - 10.35% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 58.71% 100.00% 41.29% - - - 1.70 -70.32% - - 41.29% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 98.49% 100.00% 1.51% - - - 1.02 -1.54% - - 1.51% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 82.86% 100.00% 17.14% - - - 1.21 -20.69% - - 17.14% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 71.18% 100.00% 28.82% - - - 1.40 -40.50% - - 28.82% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 24.24% 100.00% 75.76% - - - 4.13 -312.59% - - 75.76% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 24.24% 100.00% 75.76% - - - 4.13 -312.59% - - 75.76% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 73.77% 100.00% 26.23% - - - 1.36 -35.56% - - 26.23% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 99.82% 100.00% 0.18% - - - 1.00 -0.18% - - 0.18% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 99.82% 100.00% 0.18% - - - 1.00 -0.18% - - 0.18% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 31.43% 100.00% 68.57% - - - 3.18 -218.16% - - 68.57% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 144.11% 100.00% -44.11% - - - 0.69 30.61% - - -44.11% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 133.48% 100.00% -33.48% - - - 0.75 25.08% - - -33.48% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 728.52% 100.00% -628.52% - - - 0.14 86.27% - - -628.52% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 48.04% 100.00% 51.96% - - - 2.08 -108.15% - - 51.96% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 71.35% 100.00% 28.65% - - - 1.40 -40.15% - - 28.65% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 14.41 -1341.00% - - 93.06% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 47.65% 100.00% 52.35% - - - 2.10 -109.88% - - 52.35% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 498.41 -49741.00% - - 99.80% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 498.41 -49741.00% - - 99.80% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 61.74% 100.00% 38.26% - - - 1.62 -61.98% - - 38.26% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 116.02% 100.00% -16.02% - - - 0.86 13.81% - - -16.02% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 203127.27% 100.00% -203027.27% - - - 0.00 99.95% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 124.95% 100.00% -24.95% - - - 0.80 19.97% - - -24.95% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 75.95% 100.00% 24.05% - - - 1.32 -31.67% - - 24.05% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 35.93% 100.00% 64.07% - - - 2.78 -178.35% - - 64.07% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 316.39% 100.00% -216.39% - - - 0.32 68.39% - - -216.39% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 132.16% 100.00% -32.16% - - - 0.76 24.33% - - -32.16% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 199.29% 100.00% -99.29% - - - 0.50 49.82% - - -99.29% - 0.00%
CLAVO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 1003.45% 100.00% -903.45% - - - 0.10 90.03% - - -903.45% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 121.61% 100.00% -21.61% - - - 0.82 17.77% - - -21.61% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 60.92% 100.00% 39.08% - - - 1.64 -64.16% - - 39.08% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 12.18 -1118.00% - - 91.79% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 29062.75 -2906175.00% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 29062.75 -2906175.00% - - 100.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 57.37% 100.00% 42.63% - - - 1.74 -74.32% - - 42.63% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 107.81% 100.00% -7.81% - - - 0.93 7.24% - - -7.81% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 46604.44% 100.00% -46504.44% - - - 0.00 99.79% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 4254.25% 100.00% -4154.25% - - - 0.02 97.65% - - -4154.25% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 266.64% 100.00% -166.64% - - - 0.38 62.50% - - -166.64% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 161.98% 100.00% -61.98% - - - 0.62 38.26% - - -61.98% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 27.37% 100.00% 72.63% - - - 3.65 -265.33% - - 72.63% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5325.36 -532436.00% - - 99.98% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 689.14 -68814.00% - - 99.85% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 106.55% 100.00% -6.55% - - - 0.94 6.15% - - -6.55% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 631.67% 100.00% -531.67% - - - 0.16 84.17% - - -531.67% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 23778.62 -2377762.00% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 23778.62 -2377762.00% - - 100.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 1.67% 86.12% 84.45% - - - 51.48 -5047.86% - - 98.06% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 2.99% 88.00% 85.01% - - - 29.45 -2845.18% - - 96.60% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 9.69% 88.00% 78.31% - - - 9.09 -808.55% - - 88.99% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CINTA DE AISLAR SCOTCH
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 2.79% 88.00% 85.21% - - - 31.58 -3057.52% - - 96.83% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.19% 84.00% 83.81% - - - 438.47 -43747.33% - - 99.77% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 84.00% 77.42% - - - 12.77 -1177.11% - - 92.17% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 1.28% 0.00% -1.28% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 14.14% 0.00% -14.14% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
WIPE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('LIMPIEZA',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TOALLA DE MICROFIBRA 20U SURTIDO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.56% 0.00% -1.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 4.51% 0.00% -4.51% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 0.40% 0.00% -0.40% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 52
- - - - - - 1.30% 1.25% 30.52% 63.05% 32.53% - - - 2.07 -106.60% - - 51.60% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 62.40% 100.00% 37.60% - - - 1.60 -60.25% - - 37.60% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 76.05% 100.00% 23.95% - - - 1.31 -31.49% - - 23.95% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 147.98% 100.00% -47.98% - - - 0.68 32.43% - - -47.98% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 207.89% 100.00% -107.89% - - - 0.48 51.90% - - -107.89% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 92.36% 100.00% 7.64% - - - 1.08 -8.27% - - 7.64% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 58.71% 100.00% 41.29% - - - 1.70 -70.32% - - 41.29% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 100.28% 100.00% -0.28% - - - 1.00 0.28% - - -0.28% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 81.47% 100.00% 18.53% - - - 1.23 -22.74% - - 18.53% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CLAVO DE 4"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 71.18% 100.00% 28.82% - - - 1.40 -40.50% - - 28.82% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PARALES DE 3 X 3 X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9672.31 -967131.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9672.31 -967131.00% - - 99.99% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 74.16% 100.00% 25.84% - - - 1.35 -34.84% - - 25.84% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 123.92% 100.00% -23.92% - - - 0.81 19.30% - - -23.92% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 248686.67% 100.00% -248586.67% - - - 0.00 99.96% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 190.89% 100.00% -90.89% - - - 0.52 47.61% - - -90.89% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 33.13% 100.00% 66.87% - - - 3.02 -201.81% - - 66.87% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 27.75% 100.00% 72.25% - - - 3.60 -260.30% - - 72.25% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5325.36 -532436.00% - - 99.98% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 689.14 -68814.00% - - 99.85% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 143.81% 100.00% -43.81% - - - 0.70 30.46% - - -43.81% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.94 -10094.00% - - 99.02% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.99 -899.00% - - 89.99% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 18.34% 100.00% 81.66% - - - 5.45 -445.12% - - 81.66% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 18.34% 100.00% 81.66% - - - 5.45 -445.12% - - 81.66% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 60.23% 100.00% 39.77% - - - 1.66 -66.03% - - 39.77% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 106.27% 100.00% -6.27% - - - 0.94 5.90% - - -6.27% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 666323.64% 100.00% -666223.64% - - - 0.00 99.98% - - 0.00% - 0.00%
MONOCAPA GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPELLO GRUESO GRIS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 244.08% 100.00% -144.08% - - - 0.41 59.03% - - -144.08% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 128.36% 100.00% -28.36% - - - 0.78 22.09% - - -28.36% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 56.48% 100.00% 43.52% - - - 1.77 -77.07% - - 43.52% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6508.78 -650778.00% - - 99.98% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 22.75% 100.00% 77.25% - - - 4.40 -339.60% - - 77.25% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 176.25% 100.00% -76.25% - - - 0.57 43.26% - - -76.25% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.36 -14736.00% - - 99.33% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 132.16% 100.00% -32.16% - - - 0.76 24.33% - - -32.16% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 169.07% 100.00% -69.07% - - - 0.59 40.85% - - -69.07% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 446.87% 100.00% -346.87% - - - 0.22 77.62% - - -346.87% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 12.18 -1118.00% - - 91.79% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 8.21% 100.00% 91.79% - - - 12.17 -1117.35% - - 91.79% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 8.21% 100.00% 91.79% - - - 12.17 -1117.35% - - 91.79% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 46.08% 100.00% 53.92% - - - 2.17 -117.02% - - 53.92% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 53.96% 100.00% 46.04% - - - 1.85 -85.32% - - 46.04% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 53.96% 100.00% 46.04% - - - 1.85 -85.32% - - 46.04% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 33.48% 100.00% 66.52% - - - 2.99 -198.69% - - 66.52% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 2246.38% 100.00% -2146.38% - - - 0.04 95.55% - - -2146.38% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
ADHERENTE ACRILICO ACRYLAC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 184.79% 100.00% -84.79% - - - 0.54 45.88% - - -84.79% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
MASKING TAPE 1" X 25 YDS (60)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CORONA PARA DESBASTE 5" PULGADAS PROFESIONAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
BROCAS PARA CONCRETO SDS 3/8 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 123.75% 100.00% -23.75% - - - 0.81 19.19% - - -23.75% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 123.75% 100.00% -23.75% - - - 0.81 19.19% - - -23.75% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 79.07% 100.00% 20.93% - - - 1.26 -26.47% - - 20.93% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 83.43% 100.00% 16.57% - - - 1.20 -19.86% - - 16.57% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 71.88 -7088.00% - - 98.61% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 46.51% 100.00% 53.49% - - - 2.15 -115.02% - - 53.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 58.86% 100.00% 41.14% - - - 1.70 -69.88% - - 41.14% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 14.41 -1341.00% - - 93.06% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 1.78% 86.12% 84.34% - - - 48.46 -4746.00% - - 97.94% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 2.71% 88.00% 85.29% - - - 32.52 -3152.24% - - 96.93% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 2.79% 88.00% 85.21% - - - 31.58 -3057.52% - - 96.83% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.73% 84.00% 83.27% - - - 114.92 -11391.62% - - 99.13% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 25.10% 84.00% 58.90% - - - 3.35 -234.71% - - 70.12% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SIKAGROUT-212 GP - 22.7 KG
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 1.13% 0.00% -1.13% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.56% 0.00% -1.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 4.51% 0.00% -4.51% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 0.40% 0.00% -0.40% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CASA # 48
- - - - - - 1.30% 1.25% 27.78% 63.05% 35.27% - - - 2.27 -126.99% - - 55.95% - 0.00%
OBRA CIVIL
- - - - - - 0.62% 0.60% 56.49% 100.00% 43.51% - - - 1.77 -77.03% - - 43.51% - 0.00%
OBRA CIVIL - PRELIMINARES Y CIMENTACION
- - - - - - 0.07% 0.07% 88.33% 100.00% 11.67% - - - 1.13 -13.21% - - 11.67% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 171.89% 100.00% -71.89% - - - 0.58 41.82% - - -71.89% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.34 66.00% - - -194.12% - 0.00%
('CONCRETO',)
- - - - - - 0.02% 0.02% 272.11% 100.00% -172.11% - - - 0.37 63.25% - - -172.11% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 5128.79 -512779.00% - - 99.98% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.89 11.00% - - -12.36% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.66 34.00% - - -51.52% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.23 77.00% - - -334.78% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.02% 0.02% 101.20% 100.00% -1.20% - - - 0.99 1.19% - - -1.20% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 58.71% 100.00% 41.29% - - - 1.70 -70.32% - - 41.29% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 87.74% 100.00% 12.26% - - - 1.14 -13.97% - - 12.26% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 127.04% 100.00% -27.04% - - - 0.79 21.29% - - -27.04% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 75.63% 100.00% 24.37% - - - 1.32 -32.23% - - 24.37% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 115.75 -11475.00% - - 99.14% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 727.22 -72622.00% - - 99.86% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TUBO RECTANGULAR DE METAL DE 1" X 2" X 6 MTS.
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.82 -15482.00% - - 99.36% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 153.33 -15233.00% - - 99.35% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 2.49 -149.00% - - 59.84% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 384.16 -38316.00% - - 99.74% - 0.00%
('INDIRECTOS DE OBRA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('FLETES Y EXTRACCIONES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
DESALOJO DE MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1036.22 -103522.00% - - 99.90% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9672.31 -967131.00% - - 99.99% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9672.31 -967131.00% - - 99.99% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 832.67 -83167.00% - - 99.88% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8839.64 -883864.00% - - 99.99% - 0.00%
OBRA CIVIL - NIVEL 2 | MUROS Y LOSAS
- - - - - - 0.18% 0.17% 76.77% 100.00% 23.23% - - - 1.30 -30.25% - - 23.23% - 0.00%
('MATERIALES',)
- - - - - - 0.09% 0.09% 128.83% 100.00% -28.83% - - - 0.78 22.38% - - -28.83% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 46604.44% 100.00% -46504.44% - - - 0.00 99.79% - - 0.00% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.45 55.00% - - -122.22% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 6347.05% 100.00% -6247.05% - - - 0.02 98.42% - - -6247.05% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.29 -829.00% - - 89.24% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.70 30.00% - - -42.86% - 0.00%
CURADOR CURASEAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DESENCOFRANTE BASE DE ACEITE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 441.31% 100.00% -341.31% - - - 0.23 77.34% - - -341.31% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 294.21 -29321.00% - - 99.66% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 2.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SILLETA PARA MALLA SM100 RECUBRIMIENTO 7.5
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUROPORT DE 1 CM. X 4 PIES X 8 PIES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.05 95.00% - - -1900.00% - 0.00%
('CONCRETO',)
- - - - - - 0.05% 0.05% 171.15% 100.00% -71.15% - - - 0.58 41.57% - - -71.15% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9335.34 -933434.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.02% 0.02% 0.00% 100.00% 100.00% - - - 6973.62 -697262.00% - - 99.99% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.03% 0.03% 66.63% 100.00% 33.37% - - - 1.50 -50.07% - - 33.37% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 65.56% 100.00% 34.44% - - - 1.53 -52.54% - - 34.44% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 39.87 -3887.00% - - 97.49% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 32.21% 100.00% 67.79% - - - 3.10 -210.42% - - 67.79% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 545.26 -54426.00% - - 99.82% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.43 -67443.00% - - 99.85% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 121.38 -12038.00% - - 99.18% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 133.70 -13270.00% - - 99.25% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 106.55% 100.00% -6.55% - - - 0.94 6.15% - - -6.55% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 631.67% 100.00% -531.67% - - - 0.16 84.17% - - -531.67% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 22.61 -2161.00% - - 95.58% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 552.95 -55195.00% - - 99.82% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 148.06 -14706.00% - - 99.32% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 82.98 -8198.00% - - 98.79% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 321.91 -32091.00% - - 99.69% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1575.04 -157404.00% - - 99.94% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 928.14 -92714.00% - - 99.89% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 646.90 -64590.00% - - 99.85% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 18.34% 100.00% 81.66% - - - 5.45 -445.12% - - 81.66% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 18.34% 100.00% 81.66% - - - 5.45 -445.12% - - 81.66% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 2607.99 -260699.00% - - 99.96% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.07% 0.07% 0.00% 100.00% 100.00% - - - 21170.63 -2116963.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1037.38 -103638.00% - - 99.90% - 0.00%
OBRA CIVIL - NIVEL 1 | MUROS Y LOSAS
- - - - - - 0.21% 0.21% 54.86% 100.00% 45.14% - - - 1.82 -82.27% - - 45.14% - 0.00%
('MATERIALES',)
- - - - - - 0.11% 0.11% 103.11% 100.00% -3.11% - - - 0.97 3.01% - - -3.11% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
CAL
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.55 45.00% - - -81.82% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.04% 0.04% 115.88% 100.00% -15.88% - - - 0.86 13.70% - - -15.88% - 0.00%
ELECTROMALLA 6X6 DE 4.5/4.5
- - - - - - 0.02% 0.02% 75.95% 100.00% 24.05% - - - 1.32 -31.67% - - 24.05% - 0.00%
ELECTROMALLA 6X6 DE 7/7
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 48.72 -4772.00% - - 97.95% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 22.75% 100.00% 77.25% - - - 4.40 -339.60% - - 77.25% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 666.43 -66543.00% - - 99.85% - 0.00%
ACERO DE 3/8 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/2 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 252.69% 100.00% -152.69% - - - 0.40 60.43% - - -152.69% - 0.00%
ACERO DE 3/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 209.89% 100.00% -109.89% - - - 0.48 52.36% - - -109.89% - 0.00%
ACERO DE 5/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 132.16% 100.00% -32.16% - - - 0.76 24.33% - - -32.16% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.01% 0.01% 184.18% 100.00% -84.18% - - - 0.54 45.70% - - -84.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 963.70% 100.00% -863.70% - - - 0.10 89.62% - - -863.70% - 0.00%
('CONCRETO',)
- - - - - - 0.07% 0.06% 110.02% 100.00% -10.02% - - - 0.91 9.11% - - -10.02% - 0.00%
CONCRETO CONVENCIONAL 3001 M3
- - - - - - 0.04% 0.04% 0.00% 100.00% 100.00% - - - 11409.86 -1140886.00% - - 99.99% - 0.00%
CONCRETO VIVIENDA INDUSTRIAL TNM 3/8 3000 PSI
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 8523.31 -852231.00% - - 99.99% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 66.57% 100.00% 33.43% - - - 1.50 -50.21% - - 33.43% - 0.00%
DUROPORT DE 1' X 1' X 14
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 359.59 -35859.00% - - 99.72% - 0.00%
DISCO SEPARADORES PARA MUROS DE 15 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 8 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 10 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DISCO SEPARADORES PARA MUROS DE 12 CM
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.06 94.00% - - -1566.67% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 12.18 -1118.00% - - 91.79% - 0.00%
DESENCOFRANTE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.33 -1033.00% - - 91.17% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.85 15.00% - - -17.65% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
GRANZA DE ARENA BLANCA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 27.63 -2663.00% - - 96.38% - 0.00%
('MADERA',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 675.81 -67481.00% - - 99.85% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 180.96 -17996.00% - - 99.45% - 0.00%
REGLA DE 3"X3"X10'
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 101.41 -10041.00% - - 99.01% - 0.00%
PLYWOOD FENOLICO DE 4' X 8' X 3/4''
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 393.44 -39244.00% - - 99.75% - 0.00%
('MATERIALES',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1925.08 -192408.00% - - 99.95% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1134.43 -113343.00% - - 99.91% - 0.00%
MATERIALES
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 790.65 -78965.00% - - 99.87% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
ALQUILER PUNTAL METALICO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1267.91 -126691.00% - - 99.92% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 29062.75 -2906175.00% - - 100.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 100.00% 100.00% - - - 29062.75 -2906175.00% - - 100.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3187.54 -318654.00% - - 99.97% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.09% 0.08% 0.00% 100.00% 100.00% - - - 25875.21 -2587421.00% - - 100.00% - 0.00%
ACABADOS GRISES
- - - - - - 0.16% 0.15% 21.64% 100.00% 78.36% - - - 4.62 -362.06% - - 78.36% - 0.00%
('MATERIALES',)
- - - - - - 0.06% 0.06% 40.56% 100.00% 59.44% - - - 2.47 -146.56% - - 59.44% - 0.00%
('AGLOMERADOS',)
- - - - - - 0.01% 0.01% 213.55% 100.00% -113.55% - - - 0.47 53.17% - - -113.55% - 0.00%
CONCRETO 4001PSI MAXIPASTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 83.59 -8259.00% - - 98.80% - 0.00%
MONOCAPA GRIS
- - - - - - 0.01% 0.01% 222.68% 100.00% -122.68% - - - 0.45 55.09% - - -122.68% - 0.00%
CEMENTO UGC
- - - - - - 0.00% 0.00% 103.62% 100.00% -3.62% - - - 0.97 3.49% - - -3.62% - 0.00%
('ACERO DE REFUERZO',)
- - - - - - 0.01% 0.01% 41.18% 100.00% 58.82% - - - 2.43 -142.87% - - 58.82% - 0.00%
CLAVO ACERADO DE 2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ALAMBRE DE AMARRE
- - - - - - 0.00% 0.00% 14.27% 100.00% 85.73% - - - 7.01 -600.76% - - 85.73% - 0.00%
ELECTROMALLA 6X6 DE 9/9
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ACERO DE 1/4 X 6 MT G40 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 11.24 -1024.00% - - 91.10% - 0.00%
ACERO DE 3/8 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 17.38 -1638.00% - - 94.25% - 0.00%
CLAVO DE 3"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 3.47 -247.00% - - 71.18% - 0.00%
ACERO DE 1/4 X 6 MT G60 LEG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 14.41 -1341.00% - - 93.06% - 0.00%
ELECTROMALLA 6X6 6/6 LISA
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1730.09 -172909.00% - - 99.94% - 0.00%
('FERRETERIA',)
- - - - - - 0.00% 0.00% 15.53% 100.00% 84.47% - - - 6.44 -544.03% - - 84.47% - 0.00%
DUROPORT DE 4' X 8' DE 2 PLGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
NYLON NEGRO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 862.86 -86186.00% - - 99.88% - 0.00%
BROCAS PARA CONCRETO SDS 1/2 X 6"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.58 -558.00% - - 84.80% - 0.00%
('COMBUSTIBLES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
COMBUSTIBLE
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 9.83 -883.00% - - 89.83% - 0.00%
('ADITIVOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
SIKADUR 31 HI-MOD GEL 5 KGS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 23.46 -2246.00% - - 95.74% - 0.00%
('AGREGADOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 25.93 -2493.00% - - 96.14% - 0.00%
PIEDRIN DE 1/2"
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 19.18 -1818.00% - - 94.79% - 0.00%
ARENA DE RIO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 6.75 -575.00% - - 85.19% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 498.41 -49741.00% - - 99.80% - 0.00%
ADHESIVO CAPA GRUESA 40 KG
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 498.41 -49741.00% - - 99.80% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 680.79 -67979.00% - - 99.85% - 0.00%
('MADERA',)
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
TABLA 1" X 12" X 10'
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 1665.98 -166498.00% - - 99.94% - 0.00%
('CONCRETO',)
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9281.66 -928066.00% - - 99.99% - 0.00%
CONCRETO CONVENCIONAL 4003 M3
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 80.67 -7967.00% - - 98.76% - 0.00%
CONCRETO CONVENCIONAL 3003 M3
- - - - - - 0.03% 0.03% 0.00% 100.00% 100.00% - - - 9200.99 -919999.00% - - 99.99% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 10.29% 100.00% 89.71% - - - 9.72 -872.15% - - 89.71% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 10.29% 100.00% 89.71% - - - 9.72 -872.15% - - 89.71% - 0.00%
SUBCONTRATO IMPERMEABILIZACION
- - - - - - 0.01% 0.01% 0.00% 100.00% 100.00% - - - 3654.77 -365377.00% - - 99.97% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE BOMBEO DE CONCRETO
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 1506.18 -150518.00% - - 99.93% - 0.00%
SERVICIOS DE MANO DE OBRA
- - - - - - 0.08% 0.08% 0.00% 100.00% 100.00% - - - 24620.20 -2461920.00% - - 100.00% - 0.00%
('HERRAMIENTA Y EQUIPO',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
('ALQUILER EQUIPO DE CONSTRUCCION',)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
ALQUILER ANDAMIOS METALICOS COMPLETOS C/(2MARCO, 2CRUCERTAS Y 4CONECTORES)
- - - - - - 0.00% 0.00% 0.00% 100.00% 100.00% - - - 155.98 -15498.00% - - 99.36% - 0.00%
INSTALACIONES
- - - - - - 0.23% 0.22% 1.52% 86.12% 84.60% - - - 56.53 -5552.84% - - 98.23% - 0.00%
INSTALACIONES ELECTRICAS
- - - - - - 0.12% 0.12% 2.71% 88.00% 85.29% - - - 32.52 -3152.24% - - 96.93% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.12% 0.11% 2.79% 88.00% 85.21% - - - 31.58 -3057.52% - - 96.83% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE ELECTRICIDAD',)
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
SUB CONTRATO INSTALACION ELECTRICA
- - - - - - 0.12% 0.11% 0.00% 88.00% 88.00% - - - 31575.18 -3157418.32% - - 100.00% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 88.00% 88.00% - - - 947.26 -94625.84% - - 99.89% - 0.00%
INSTALACIONES HIDROSANITARIAS
- - - - - - 0.11% 0.10% 0.19% 84.00% 83.81% - - - 438.47 -43747.33% - - 99.77% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 6.58% 84.00% 77.42% - - - 12.77 -1177.11% - - 92.17% - 0.00%
('MATERIALES',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
IMPREVISTOS
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 802.66 -80166.20% - - 99.88% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
POLIDUCTO NEGRO DE 1"
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
CAJA RECTANGULAR METALICA DE 2' X 4'
- - - - - - 0.00% 0.00% 0.00% 84.00% 84.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
('SUB. CONTRATO MO. DE PLOMERIA',)
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
SUB CONTRATO SERVICIOS DE PLOMERIA
- - - - - - 0.11% 0.10% 0.00% 84.00% 84.00% - - - 26755.39 -2675438.60% - - 100.00% - 0.00%
ACABADOS FINALES
- - - - - - 0.45% 0.43% 1.51% 0.00% -1.51% - - - 0.00 100.00% - - 0.00% - 0.00%
ACABADOS CEMENTICIOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.10% 0.09% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
JARDINIZACION
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LIMPIEZA FINAL
- - - - - - 0.00% 0.00% 37.09% 0.00% -37.09% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.00% 0.00% 37.09% 0.00% -37.09% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.00% 0.00% 37.09% 0.00% -37.09% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO DE MANO DE OBRA DIRECTA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO DE TABLAYESO',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO MO DE TABLAYESO
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISOS Y AZULEJOS
- - - - - - 0.07% 0.06% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PISOS Y AZULEJOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 1
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
AZULEJO TIPO 2
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ESTUQUE
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 2
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PISO CERAMICO TIPO 3
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PEGAMIX 20KG
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATO INSTALACION DE PISO',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATO COLOCACION DE PISO/AZULEJO
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ARTEFACTOS
- - - - - - 0.06% 0.06% 1.56% 0.00% -1.56% - - - 0.00 100.00% - - 0.00% - 0.00%
('MATERIALES',)
- - - - - - 0.02% 0.02% 4.51% 0.00% -4.51% - - - 0.00 100.00% - - 0.00% - 0.00%
('ELECTRICIDAD',)
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
EXTRACTOR DE OLORES 50CM
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('PLOMERIA',)
- - - - - - 0.02% 0.02% 0.40% 0.00% -0.40% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVATRASTOS DE DOBLE FOSA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PILA DE 1 LAVADERO DERECH. O IZQ.
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS DE PEDESTAL
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
LAVAMANOS IMPORTADO
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
INODORO 1
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
DUCHA IMPORTADA
- - - - - - 0.01% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
REPOSADERA DE CONCRETO 0.22X0.22 CON TAPADERA REDONDA
- - - - - - 0.00% 0.00% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.04% 0.04% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PUERTAS
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.06% 0.06% 6.55% 0.00% -6.55% - - - 0.00 100.00% - - 0.00% - 0.00%
VENTANAS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.08% 0.08% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
ZOCALOS, PASAMANOS Y CELOSIA
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.02% 0.02% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
PINTURA INTERIORES Y EXTERIORES
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.03% 0.03% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
COMPLEMENTARIOS EN CULATAS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUBCONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
('SUB. CONTRATOS',)
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%
SUBCONTRATOS
- - - - - - 0.01% 0.01% 0.00% 0.00% 0.00% - - - 0.00 100.00% - - 0.00% - 0.00%