| URBANIZACION |
CISTERNA DE DETENCION 1 & 2 |
PRELIMINARES |
520.01 |
|
| URBANIZACION |
CISTERNA DE DETENCION 1 & 2 |
ESTRUCTURA PRINCIPAL |
2,676.77 |
|
| URBANIZACION |
CISTERNA DE AGUA POTABLE |
PRELIMINARES |
4,250.51 |
|
| URBANIZACION |
CISTERNA DE AGUA POTABLE |
ESTRUCTURA PRINCIPAL |
11,950.61 |
|
| URBANIZACION |
INFRAESTRUTURA PARA INSTALACIONES |
INFRAESTRUCTURA AGUAS NEGRAS |
2,061.92 |
|
| URBANIZACION |
INFRAESTRUTURA PARA INSTALACIONES |
MOVIMIENTO DE TIERRA (EXCAVACIONES PARA CAJAS Y TUBERIA) |
3,463.34 |
|
| URBANIZACION |
INFRAESTRUTURA PARA INSTALACIONES |
INFRAESTRUCTURA AGUA DE LLUVIAS |
6,272.09 |
|
| URBANIZACION |
INFRAESTRUTURA PARA INSTALACIONES |
INFRAESTRUCTURA ELECTRICA |
8,263.61 |
|
| URBANIZACION |
INFRAESTRUTURA PARA INSTALACIONES |
INFRAESTRUCTURA DE TELECOMUNICACIONES |
659.57 |
|
| URBANIZACION |
GARITA DE ACCESO |
OBRA CIVIL |
6,977.74 |
|
| URBANIZACION |
GARITA DE ACCESO |
HERRERIA |
1,009.97 |
|
| URBANIZACION |
GARITA DE ACCESO |
ACABADO INTERIOR Y EXTERIOR (TEXTURAS) |
147.29 |
|
| URBANIZACION |
CUARTO DE MAQUINAS |
OBRA CIVIL |
3,178.01 |
|
| URBANIZACION |
CUARTO DE MAQUINAS |
ACABADO INTERIOR Y EXTERIOR (TEXTURAS) |
157.95 |
|
| URBANIZACION |
MUROS EN COLINDANCIAS |
PRELIMINARES |
1,146.10 |
|
| URBANIZACION |
MUROS EN COLINDANCIAS |
OBRA CIVIL |
5,938.52 |
|
| URBANIZACION |
OBRAS COMPLEMENTARIAS |
BANQUETA EN CAMINAMIENTO PRINCIPAL HACIA EDIFICIOS |
1,497.71 |
|
| URBANIZACION |
OBRAS COMPLEMENTARIAS |
MUROS DE JARDINES |
2,669.57 |
|
| URBANIZACION |
OBRAS COMPLEMENTARIAS |
PORTON VECHICULAR |
546.90 |
|
| URBANIZACION |
OBRAS COMPLEMENTARIAS |
CANCHA DE BKB |
1,257.23 |
|
| URBANIZACION |
OBRAS COMPLEMENTARIAS |
CONFORMACION DE CAMINAMIENTOS Y BANQUETAS |
7,956.40 |
|
| URBANIZACION |
OBRAS COMPLEMENTARIAS |
DEMOLICIONES Y DESTROQUE DE ARBOLES |
7,217.63 |
|
| URBANIZACION |
OBRAS COMPLEMENTARIAS |
PAVIMENTO DE INGRESO |
6,399.96 |
|
| URBANIZACION |
OBRAS COMPLEMENTARIAS |
MUROS PERIMETRALES Y PARED DE INGRESO |
2,348.89 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
SERVICIOS |
3,912.32 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
SEGURIDAD INDUSTRIAL |
3,467.83 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
HERRAMIENTA Y EQUIPO |
35,362.13 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
TOPOGRAFIA |
5,029.10 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
CAMPAMENTO, BODEGA Y CONSUMIBLES |
10,999.43 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
VIATICOS PERSONAL DE RESIDENCIA EN EL SALVADOR |
56,485.83 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
PRESTACIONES |
36,053.88 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
PLANILLA PARA LA ADMINISTRACION DE OBRA GRIS (RESIDENTES, PERSONAL TECNICO Y ADMINISTRATIVO) |
43,389.14 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
SEGURIDAD PARA EL PROYECTO |
12,610.29 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
VIATICOS SUPERVISION GERENCIA |
11,065.53 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
SEGUROS Y FIANZAS |
31,778.95 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
PLANILLA ADMINISTRACION DE SUBCONTRATOS (RESIDENTES) |
31,268.79 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
LIMPIEZA FINAL DE OBRA |
6,882.31 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
PERSONAL PARA EJECUCION DE OBRA GRIS (MAESTROS DE OBRA, ALBAÑILES Y AYUDANTES) |
0.00 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
PERSONAL PARA DESCARGA DE CAMIONES Y TRASIEGO |
7,160.71 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
PLANILLA DE NITIDOS |
4,483.75 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
MATERIAL DE NITIDOS |
2,622.99 |
|
| INDIRECTOS DE OBRA |
INDIRECTOS DE OBRA |
PERSONAL PARA EJECUCION DE OBRA GRIS (MAESTROS DE OBRA, ALBA?ILES Y AYUDANTES) |
33,877.19 |
|
| AMENIDADES |
OBRA CIVIL |
REACONDICIONAMIENTO DE TERRENO |
921.80 |
|
| AMENIDADES |
OBRA CIVIL |
CIMENTACION |
1,315.53 |
|
| AMENIDADES |
OBRA CIVIL |
LEVANTADOS DE MAMPOSTERIA NIVEL 1 & 2 |
7,353.76 |
|
| AMENIDADES |
OBRA CIVIL |
LOSA DE CONCRETO |
2,371.50 |
|
| AMENIDADES |
OBRA CIVIL |
CUBIERTA METALICA |
4,951.25 |
|
| AMENIDADES |
ESTRUCTURAS SECUNDARIAS |
CONTRAPISO & TOPPING DE CONCRETO EN GRADAS |
1,363.07 |
|
| AMENIDADES |
ACABADOS |
TABLAYESO |
166.55 |
|
| AMENIDADES |
ACABADOS |
ACABADO INTERIOR Y EXTERIOR (TEXTURAS) |
1,048.49 |
|
| TORRE A |
OBRA BRIS |
REACONDICIONAMIENTO DE TERRENO |
6,599.76 |
|
| TORRE A |
OBRA BRIS |
CIMENTACION |
27,653.22 |
|
| TORRE A |
OBRA BRIS |
NIVEL 2 MUROS Y LOSAS |
23,434.05 |
|
| TORRE A |
OBRA BRIS |
NIVEL 1 MUROS Y LOSAS |
33,561.28 |
|
| TORRE A |
OBRA BRIS |
NIVEL 8 MUROS Y LOSAS |
19,938.06 |
|
| TORRE A |
OBRA BRIS |
NIVEL 9 MUROS Y LOSAS |
26,554.78 |
|
| TORRE A |
OBRA BRIS |
NIVEL AZ MUROS Y LOSAS |
852.94 |
|
| TORRE A |
OBRA BRIS |
NIVEL 3 MUROS Y LOSAS |
22,259.44 |
|
| TORRE A |
OBRA BRIS |
NIVEL 4 MUROS Y LOSAS |
21,351.48 |
|
| TORRE A |
OBRA BRIS |
NIVEL 5 MUROS Y LOSAS |
20,745.57 |
|
| TORRE A |
OBRA BRIS |
NIVEL 6 MUROS Y LOSAS |
20,367.61 |
|
| TORRE A |
OBRA BRIS |
NIVEL 7 MUROS Y LOSAS |
19,975.33 |
|
| TORRE A |
ESTRUCTURAS SECUNDARIAS Y RESANES |
CONTRAPISO |
3,343.24 |
|
| TORRE A |
ESTRUCTURAS SECUNDARIAS Y RESANES |
SILLARES Y BORDILLOS DE DUCHA |
3,788.40 |
|
| TORRE A |
ESTRUCTURAS SECUNDARIAS Y RESANES |
RESANES |
20,921.69 |
|
| TORRE A |
ESTRUCTURAS SECUNDARIAS Y RESANES |
TOPPING DE CONCRETO EN GRADAS |
5,971.68 |
|
| TORRE A |
ESTRUCTURAS SECUNDARIAS Y RESANES |
TALLADO DE VANOS |
5,090.38 |
|
| TORRE A |
ACABADOS |
TEXTURIZADO PLASTICO INTERIOR |
14,171.65 |
|
| TORRE A |
ACABADOS |
ACABADO CEMENTICIO EXTERIOR |
6,722.90 |
|
| TORRE A |
ACABADOS |
RESANE EN AREA DE AZULEJOS |
1,653.79 |
|
| TORRE A |
ACABADOS |
HERRERIA EN BALCONES Y PASILLO |
8,301.41 |
|
| TORRE A |
ACABADOS |
IMPERMEABILIZACION EN DUCHAS, BALCONES Y LOSA FINAL |
1,364.95 |
|
| TORRE A |
ACABADOS |
MODULOS DE ESCALERAS METALICAS |
21,141.03 |
|
| TORRE C |
ACABADOS |
HERRERIA EN BALCONES Y PASILLO |
8,301.41 |
|
| TORRE C |
ACABADOS |
MODULOS DE ESCALERAS METALICAS |
10,125.61 |
|
| TORRE C |
ACABADOS |
TEXTURIZADO PLASTICO INTERIOR |
14,161.39 |
|
| TORRE C |
ACABADOS |
ACABADO CEMENTICIO EXTERIOR |
6,733.26 |
|
| TORRE C |
ACABADOS |
RESANE EN AREA DE AZULEJOS |
1,653.79 |
|
| TORRE C |
ACABADOS |
IMPERMEABILIZACION EN DUCHAS, BALCONES Y LOSA FINAL |
1,374.51 |
|
| TORRE C |
OBRA GRIS |
REACONDICIONAMIENTO DE TERRENO |
6,530.65 |
|
| TORRE C |
OBRA GRIS |
NIVEL 1 MUROS Y LOSAS |
34,434.93 |
|
| TORRE C |
OBRA GRIS |
CIMENTACION |
27,366.47 |
|
| TORRE C |
OBRA GRIS |
NIVEL 4 MUROS Y LOSAS |
21,624.01 |
|
| TORRE C |
OBRA GRIS |
NIVEL 5 MUROS Y LOSAS |
21,018.10 |
|
| TORRE C |
OBRA GRIS |
NIVEL 6 MUROS Y LOSAS |
20,636.39 |
|
| TORRE C |
OBRA GRIS |
NIVEL 3 MUROS Y LOSAS |
22,528.21 |
|
| TORRE C |
OBRA GRIS |
NIVEL 2 MUROS Y LOSAS |
24,089.51 |
|
| TORRE C |
OBRA GRIS |
NIVEL 8 MUROS Y LOSAS |
20,198.18 |
|
| TORRE C |
OBRA GRIS |
NIVEL 7 MUROS Y LOSAS |
20,235.45 |
|
| TORRE C |
OBRA GRIS |
NIVEL 9 MUROS Y LOSAS |
28,612.92 |
|
| TORRE C |
OBRA GRIS |
NIVEL AZ MUROS Y LOSAS |
302.21 |
|
| TORRE C |
ESTRUCTURAS SECUNDARIAS Y RESANES |
CONTRAPISO |
3,432.99 |
|
| TORRE C |
ESTRUCTURAS SECUNDARIAS Y RESANES |
SILLARES Y BORDILLOS DE DUCHA |
3,788.40 |
|
| TORRE C |
ESTRUCTURAS SECUNDARIAS Y RESANES |
RESANES |
21,235.17 |
|
| TORRE C |
ESTRUCTURAS SECUNDARIAS Y RESANES |
TOPPING DE CONCRETO EN GRADAS |
2,230.97 |
|
| TORRE C |
ESTRUCTURAS SECUNDARIAS Y RESANES |
TALLADO DE VANOS |
5,090.38 |
|
| TORRE B |
OBRA GRIS |
CIMENTACION |
20,114.18 |
|
| TORRE B |
OBRA GRIS |
REACONDICIONAMIENTO DE TERRENO |
4,802.96 |
|
| TORRE B |
OBRA GRIS |
NIVEL 1 MUROS Y LOSAS |
21,967.77 |
|
| TORRE B |
OBRA GRIS |
NIVEL 3 MUROS Y LOSAS |
16,346.07 |
|
| TORRE B |
OBRA GRIS |
NIVEL 2 MUROS Y LOSAS |
16,504.36 |
|
| TORRE B |
OBRA GRIS |
NIVEL 8 MUROS Y LOSAS |
14,531.13 |
|
| TORRE B |
OBRA GRIS |
NIVEL 9 MUROS Y LOSAS |
19,755.04 |
|
| TORRE B |
OBRA GRIS |
NIVEL AZ MUROS Y LOSAS |
350.68 |
|
| TORRE B |
OBRA GRIS |
NIVEL 4 MUROS Y LOSAS |
15,859.86 |
|
| TORRE B |
OBRA GRIS |
NIVEL 5 MUROS Y LOSAS |
15,133.31 |
|
| TORRE B |
OBRA GRIS |
NIVEL 6 MUROS Y LOSAS |
15,014.04 |
|
| TORRE B |
OBRA GRIS |
NIVEL 7 MUROS Y LOSAS |
14,531.13 |
|
| TORRE B |
ESTRUCTURAS SECUNDARIAS Y RESANES |
CONTRAPISO |
2,490.60 |
|
| TORRE B |
ESTRUCTURAS SECUNDARIAS Y RESANES |
SILLARES Y BORDILLOS DE DUCHA |
3,030.22 |
|
| TORRE B |
ESTRUCTURAS SECUNDARIAS Y RESANES |
RESANES |
15,743.72 |
|
| TORRE B |
ESTRUCTURAS SECUNDARIAS Y RESANES |
TOPPING DE CONCRETO EN GRADAS |
5,971.68 |
|
| TORRE B |
ESTRUCTURAS SECUNDARIAS Y RESANES |
TALLADO DE VANOS |
3,713.48 |
|
| TORRE B |
ACABADOS |
TEXTURIZADO PLASTICO INTERIOR |
10,085.61 |
|
| TORRE B |
ACABADOS |
ACABADO CEMENTICIO EXTERIOR |
4,969.24 |
|
| TORRE B |
ACABADOS |
RESANE EN AREA DE AZULEJOS |
1,211.11 |
|
| TORRE B |
ACABADOS |
HERRERIA EN BALCONES Y PASILLO |
6,302.36 |
|
| TORRE B |
ACABADOS |
IMPERMEABILIZACION EN DUCHAS, BALCONES Y LOSA FINAL |
959.75 |
|
| TORRE B |
ACABADOS |
MODULOS DE ESCALERAS METALICAS |
19,696.11 |
|
| TORRE DE ESTACIONAMIENTOS |
OBRA GRIS |
REACONDICIONAMIENTO DE TERRENO |
6,877.84 |
|
| TORRE DE ESTACIONAMIENTOS |
OBRA GRIS |
CIMENTACION |
32,157.15 |
|
| TORRE DE ESTACIONAMIENTOS |
OBRA GRIS |
COLADO DE CONCRETO EN LOSACERO |
57,233.28 |
|
| TORRE DE ESTACIONAMIENTOS |
ESTRUCTURAS SECUNDARIAS Y RESANES |
CONTRAPISO DE ESTACIONAMIENTO NIVEL 1 |
12,030.33 |
|
| TORRE DE ESTACIONAMIENTOS |
ESTRUCTURAS SECUNDARIAS Y RESANES |
MURO DE BLOCK PERIMETRAL |
22,877.19 |
|
| TORRE DE ESTACIONAMIENTOS |
ESTRUCTURAS SECUNDARIAS Y RESANES |
TOPPING DE CONCRETO EN GRADAS |
706.96 |
|
| TORRE DE ESTACIONAMIENTOS |
ESTRUCTURAS SECUNDARIAS Y RESANES |
COLADO DE CONCRETO EN PUENTES |
581.13 |
|
| TORRE DE ESTACIONAMIENTOS |
ESTRUCTURAS SECUNDARIAS Y RESANES |
TALLADO DE VANOS |
580.28 |
|
| TORRE DE ESTACIONAMIENTOS |
ACABADOS |
ACABADO EXTERIOR EN MUROS DE ESTACIONAMIENTO |
1,233.98 |
|
| TORRE DE ESTACIONAMIENTOS |
ACABADOS |
COLOCACION DE TOPES DE PARQUEO |
2,261.31 |
|